Project Mitsubishi Showroom

Location Butuan City, Agusan del Norte


Owner Fast Autoworld Philippine Corp. (FAPC)

MATERIAL LABOR UNIT TOTAL


DESCRIPTION QTY UNIT COST COST COST COST
I. GROUND FLOOR (GLASSWORK)
a. Service Manager's Office
(Supply and Installation of Fixed Glass using 6mm thk. Clear
glass in 2x4 rectangular aluminum analok frame)
i. Glass Partition 1 - 94 3/4" x 107 1/2" 1.00 set 4,500.00 1,500.00 6,000.00 6,000.00
ii. Glass Partition 2 - 46 3/4" x 51" 1.00 set 2,592.00 864.00 3,456.00 3,456.00
b. Branch Manager's Office
Fixed Window Panel ( 1.20m x 1.20m) 1.00 set 7,092.00 2,364.00 9,456.00 9,456.00
c. Toilet
(1/4" thk mirror w/o Frame)
i. PWD Toilet - Mirror (1.00m x 1.00m) 1.00 set 2,160.00 720.00 2,880.00 2,880.00
ii. Men's Toilet - Mirror (2.10m x 1.00m) 1.00 set 4,320.00 1,440.00 5,760.00 5,760.00
1.00 set 4,320.00 1,440.00 5,760.00 5,760.00
d.