Professional Documents
Culture Documents
Input For Trashrack Details: M /s M /s M /s
Input For Trashrack Details: M /s M /s M /s
Input For Trashrack Details: M /s M /s M /s
Design of Trashrack
Clear Spacing between bars a 50.00 mm
Thickness t 20.00 mm
Shape Factor K 2.42
Angle of Inclination with
horizontal α 75.00 degree
Width B 6.00 m
Depth H 2.60 m
Gross Submerged Area gross area/sinα 16.15 m2
Percentage opening a/(a+t) 71.43
Effective area Aeff 11.54 m2
Approach Velocity V 0.64 m/s
Headloss through Intake hl=K*(t/a) *V2/2g*sinα
4/3
0.014 m
velocity should limit to 1m/s for small hydroelectric project according to IS Code
ondition
10.5 54.41377