Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• Turbines
• Turbine installation
• Cables
• Cable Laying
• Other offshore activities
• The challenge
• Round Up
3
Installed Capacity / MW per Country
4
Offshore Wind 2002-2012
Frederikshavn
Robin Rigg Utgrunden
Walney Blyth Offshore Anholt
Barrow Offshore Yttre Stengrund
Gwyntt y Mor
G M Ormonde Samsø
S
Horns Rev 1 Lillgrund
North Hoyle Burbo Bank Horns Rev 2 Sprogø
Arklow Bank Rhyl Flats
Lynn Inner Dowsing Alpha Ventus Rødsand 2 Baltic I
Nysted
y
Lincs Nordsee Ost
Bard Offshore I
Norder Gründe
Scroby Sands
Gr. Gabbard Prinses Amalia
Egmond an Zee
Gunfleet Sands
Kentish Flats Blight Bank
Thanet Thornton Bank
5
Typical Offshore Installation
Hardware: Software:
Foundations 15% Installation Foundations 5%
Turbines 45% Installation Turbines 5%
Cables 15% Installation Cables 4%
Transformer Station 2% Trafic Control/HSE/Project Management 4%
Scour protection etc. 5%
2.5-3.0
2.5 3.0 Mil. Euro/MW
6
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• Turbines
• Turbine installation
• Cables
• Cable Laying
• Other offshore activities
• The challenge
• Round Up
7
Off h
Offshore Foundations
F d ti
8
Installation of Gravity Foundations
Nysted
Lillgrund
Thornton Bank
R d
Rødsand
d II
Sprogø
Photo: www.JanWinther.com
9
Installation of Monopile
Foundations
Horns Rev I &II Burbo Bank
Kentish Flats Barrow
Scroby Sands Robin Rigg
Prinses Amalia (Q7) Lynn Inner Dowsing
Egmond an Zee Rhyl Flats
Gunfleet Sands
Th
Thanet
t
Arklow
y
North Hoyle
Greater Gabbard
Blight Bank
Baltic 1
Walney 1
Total approx.
approx 1000 installed end of 2010
10
Jackets, Tripod, Tripile
Bard
11
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• Turbines
• Turbine installation
• Cables
• Cable Laying
y g
• Other offshore activities
• The challenge
• Round Up
12
Installation and equipment
13
Installation and equipment
HLV Svanen
14
Installation and equipment
15
Installation and equipment
16
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• Turbines
• Turbine installation
• Cables
• Cable Laying
• Other offshore activities
• Th challenge
The h ll
• Round Up
17
Turbines
Siemens 2.3M Units Weight
1a Hub 32.3
1b Blades 9.2
1a + 1b Hub + Blades 60
2 Nacelle 82
3 Tower (approx.)
(approx ) 130
(1+2+3) Total Assembly 246
18
Turbines
Vestas V90, 3MW Units Weight
1a Hub 40
1b Blades 9+
1a + 1b Hub + Blades 67+
2 Nacelle 70
3 T
Tower (
(approx.)
) 110
(1+2+3) Total Assembly 247+
19
Turbines
Multibrid 5M Units Weight
1a Hub 62
1b Blades 49 5
49.5
1a + 1b Hub + Blades 111.5
2 Nacelle 233
3 T
Tower (
(approx.)
) 200
(1+2+3) Total Assembly 544
20
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• T bi
Turbines
• Turbine installation
• Cables
• Cable Laying
y g
• Other offshore activities
• The challenge
• Round Up
21
Turbine Installations
22
Turbine Installation
Siemens
Vestas 2.3MW
2.0MW/3.0MW
23
Turbine Installation
Repower 5.0 MW
Full Rotor Installation
24
Feeding Offshore
25
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• T bi
Turbines
• Turbine installation
• Cables
• Cable Laying
• Other offshore activities
• The challenge
• Round Up
26
Offshore Turbines/Foundations
Interay cables
Transformer Station
Shore Line
Transformer Station
Distribution of Power
27
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• T bi
Turbines
• Turbine installation
• Cables
• Cable laying
• Other offshore activities
• The challenge
• Round Up
28
29
Cable laying
30
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• T bi
Turbines
• Turbine installation
• Cables
• Cable laying
• The challenge
• Round Up
31
Service - Lifetime
32
Service
33
Crew vessels
M/V Thjalfe
Thj lf Catemaran
Service vessels
34
Other vessels will be required as well…
T
Tugs
Hotel ships
35
Presentation Structure
• 2002 – 2012 Market
• Foundations
• Foundation installation
• T bi
Turbines
• Turbine installation
• Cables
• Cable laying
• Other offshore activities
• The challenge
• Round Up
36
Future Selection of Harbour
• Decide the
logistic flow for;
• Foundation
F d ti
installation
• Turbine installation
• Cable Installation
• Cost / Time
• Contingency
• Storage
• Risk (delivery /
handling / damage)
• Safety
37
38
Port Logistics
39
Turbines
6,0 MW Turbine (Siemens/Vestas)
Rotor diameter : 126 m;;
Hub Height : 90 m;
Total Weight at hub height (nacelle + blades) : 250-350 tons;
Weight of tower : 500 tons;
8,5 MW Turbine
Rotor diameter : 160 m;
Hub Height : 110 m;
Total Weight at hub height (nacelle + blades) : 800 tons;
W i ht off tower
Weight t : 1000 tons;
t
10 MW turbine (Clipper)
Rotor diameter : 150 meter
Hub height: 100 meter
40
T bi
Turbines
• 3 – 5 – 6 MW
• Vestas
• Siemens
• RePower
• Multibrid
• Gamesa
• BARD
• Alstrom
• Nordex
• 2-4 Chinese exporters
41
A d ffoundations
And d ti even larger
l and
d different
diff t…
Photo Jos Beurskens
42
Floating Vessel Types
piling operations
leg cranes
43
New V
N Vessels
l
(from Oil & Gas)
44
T i l design
Typical d i off new vessels
l
45
F
From design
d i to t installation
i t ll ti
• Detailed Design
• Class Approval etc. 2-2½ year
• Construction
C i
• Test ?
46
By 2015-2016?
48
Offshore wind - hardware
• Grid / Cables / Transformers
• Distribution of 50 GW offshore wind in 2030
• Cable production
• Technology
• Foundations
• Steel
• Production facilities
• New designs
• Materials
• Turbines
• Production
• Development
• Onshore - offshore
49
Offshore wind - software
• Harbours
• Germany
• UK
• Others
• Vessels
• IInstallation
t ll ti
• Service
• Other vessels
• Manpower / Know-how
• NAREC, Newcastle UK
• Bremen / Oldenburg
Oldenburg, Germany
• Esbjerg, Denmark
• The Netherlands
• From oil and gas
• From shipping
• Technical / engineering
• Managers
g
50
51