Solar Floating / Rooftop/ Ground Mounted Electric Vehicle Charging DG Set
Solar Floating / Rooftop/ Ground Mounted Electric Vehicle Charging DG Set
2019
Proposed Targets by Govt up to 2022.
https://niti.gov.in/writereaddata/files/175-GW-Renewable-Energy.pdf
Renewable Purchase Obligation - Targets
To push renewables governments across the world have made permitting difficult for
new thermal power projects. Some are mandating and have fast tracked de-
commissioning while others have banned new thermal power plants.
Floating solar opens new opportunities for scaling up solar generating capacity
OUR PRODUCT - SAMPLE PANEL & FLOAT ASSEMBELY
POTENTIAL USERS FOR Estimated Potential at 400+ GW
FLOATING SOLAR
• Smart cities
• Water utility companies
• Large manufacturing companies
• Thermal power companies
• Hydro power companies
• Irrigation ponds and canals
• Wastewater treatment companies
• Drinking water reservoirs
• Beach side resorts/hotels
• Mining companies
• Cement companies
• Fertilizers companies
• Gas exploration companies etc
PROJECT PROCESS FLOW
1. Presentations
2. Feasibility Studies
3. Project Reports
4. Proposals
5. System design and
engineering
6. Solution deployment
7. Commissioning and
handover
8. Training
9. O&M services
10. Asset Management
Energy generation & Area Requirement:
1) STC:1000 W/m2 irradiance, 25°C cell temperature, AM1.5g spectrum according to EN 60904-3. |
2) Power measurement uncertainty is within +/- 3%.
Return on Investment:
Project Size In DC 100%
0%
Energy Generation in 25 years 1 3 5 7 9 11 13 15 17 19 21 23 25
-20%
Total Expected 38660
-40%
Generation In KWH
-60%
Energy Purchase 10
cost per Unit Rs -80%