JOB SAFETY ANALYSIS

APPROVED BY
DATE WORK LOCATION PREPARED BY JSA NO
OWNER NAME POSITION
02-Jun-20 Pilot Plant Existing Office BRIAN TAN BL 01

NAME OF PROJECT / WORKS PILOT PLANT EXTENSION (EXISTING OFFICE) SCHEDULE DATE

JOB DESCRIPTION ELECTRICAL WIRING FOR PILOT PLANT 03-06 TO 15-06

COUNTER MEASURE
ACTIVITY BY SEQUENCE POTENTIAL HAZARDS SAFETY DEVICE / PPE
PRECAUTIONS

Area preparation Not aware safety precautions during material handling Safety Briefing before start work.

Site Clearance Accessibility Make sure access location and with assist. Proper access to working area.

Proper PPE (Safety Shoe,


Errection of Scaffolding (Aluminium Type -
Minor Injury Wear Glove Glove, Body Harness if higher
Mobile)
than 2.0m)

Safety harness during all the time during work at


Using Fibre Ladder Fall during working at high Safety Harness
high
Obtain LOTO Permit or with permission / Proper PPE (Safety Shoe,
Termination of outgoing-cables Direct contact with live electricity, serious injury
supervision glove)

Proper PPE (Safety Shoe,


Installation of Conduit Pipe (GI) Minor Injury in Body or Hand during cutting Correct tools using, Face Shield as additional PPE Glove, Goggle/ Safety Glass if
using Electric Cutter)

Proper PPE (Safety Shoe,


Installation of Exhaust fan Minor Injury in Body or Hand Only allow experienced / qualified worker
glove)

Proper PPE (Safety Shoe,


Installation of Cable Tray Minor Injury in Body or Hand during cutting Correct tools using, Face Shield as additional PPE Glove, Goggle/ Safety Glass if
using Electric Cutter)

Obtain LOTO Permit or with permission / Proper PPE (Safety Shoe,


Termination of Main incoming cable Direct contact with live electricity, serious injury
supervision Glove)

Page 1 of 1