Realization of Gas Treatment Units (EPC 2 – Phase 1)

South West Gas Fields Development Project, Algeria


DAILY REPORT CPF HBH UPDATE
DATE: 01-09-2020
PREPARED BY: ABDELAZIZ BENYAHIA
DESCRIPTION OF ELEMENT TOTAL QUANTITY
OF CONCRETE
MAIN POWER
LEAN CONC FOOTINGS PEDESTALS RING WALL
C.S.
Sl. No AREA N⁰ ITEM N⁰ C.S. PAIVIN EQUIPMENT PICTUR REMARKS
EXCAV REINFORC FORMW CASTING PROTICTI BACKFIL
REPARE G m3
ON
INSP Q= m3 INSP Q= m3 INSP Q= m3 INSP Q= m3 NBR TOTAL
1 A
2 B
3 C
4 D
5 Main Piperack E
6 F 6
7 G
8 H

5 forwork for 8 P6 + 2P3+ 2P5 and F2 ready for pouring


9 A

10 GTG SHELTER B
8 7 pouring concrete for 3 P1

11 C
7 2 9 pouring concrete for 2P5+1P4 and F2

12 D 2

13 A 6 removing form
14 B
HP GTC
15 C 4 removing form on going for GTC-C
16 D 97 8 pouring concrete for GTC D

17 A 6 formwork ongoing
18 LP GTC B
19 C
20 D

21 FIRE WATER 3
22 RAW WATER TANK
23 TANK PRODUCED W
BUFFER 174 144
24 FRESH WATER

25 DIESEL STORAGE TANK

Concrete surface repair, protective coating + backfilling and


26 FENCE A 3 instalation of panels

27 105
WATER WELL
28 106

1G66-ST-25-001 & 002 A, B & C 6 removing form for F1 &F2 & F3 axe C
29

30 STAIR TOWER HP A/B/C/D 16 A & B ready for pouring

60 pouring concrete for A&B&C&D


31 STAIR TOWER LP A/B/C/D

32 SLUG CATCHER FOUNDATION A,B AND C


33 PROCESS RACK 1G01-SW-20-009
34 PROCESS RACK 1G01-SW-20-010
35 PROCESS RACK 1G01-SW-20-011
36 PROCESS RACK 1G01-SW-20-012
37 ELEC AIR compressor shelter 29 reinforcement for foundations
38 Flare area
39 HP Fuel gas separator
40
Fence post precast 4 form for 11 fondation
manhole precast 5 form for 9 manholes (walls)
41 GCB WORKSHOP
fence panel welding 3
bar bending 22