Precast Pile Analysis For Lifting 29m Long 26.11
Precast Pile Analysis For Lifting 29m Long 26.11
Employer: SUMMIT
General Information:
Pile Size= 400mm x 400mm
Length of Pile, L = 28.6m
Concrete Cylinder Crushing Strength at 28 days, f’c= 30 MPa
Yield Strength of Rebar = 415 MPa
Main Reinforcement = 4d-20mm and 4-d22mm diameter bar
Evaluated shaft friction of 400 x 400, driven to depth of 29m from existing ground
level (EGL).For a set value of 2.2 at 28.25m depth safe capacity skin friction with
factor of safety of 3 = 750 kN
Safe shaft friction using CPT = 2435x 0.7/1.5= 1136 kN
From static load test and dynamic load test of TP-5, it is evaluated that the ultimate
shaft friction is reduced about 30% from that of Computed from CPT.
Safe Shaft friction using CPT / Safe capacity using set value 2.2mm= 1136/750=1.51
Safe Shaft friction from set value= 2160/(1.50x1.51)= 947 kN