Item
Description Unit Quantity Rate (Tk.) Amount (Tk.)
No.
1 Design of Jetty and other related working drawing LS -
a) Beam m3 650.00 -
b) Slab m3 560.00 -
6 M.S. Fabrication Work : Supplying, fabrication and fixing
to details as per design of deformed reinforcement bars in
concrete conforming to ASTM A615 standard including
straightening and cleaning rust, if any, bending and binding
in position, welding where necessary including supply of G.I. MT 175.00 -
wires etc. all complete in all respects in piles, beams and
slab in jetty. Deformed bar with minimum fy = 420 MPa shall
have to be used.
Page: 1 OF 2
Bill of Quantities for Construction of Jetty for 10000 DWT Vessel.
Item
Description Unit Quantity Rate (Tk.) Amount (Tk.)
No.
7 Pile Driving Analyser (PDA), Lateral Load Test and
Integrity Tests: Mobilization and installation of equipment,
making load platform including necessary load arrangement,
and execution of pile load tests, including pile integrity test, Nos. -
all complete as per Specification and direction of the
Engineer.
Total : -