UNIT I : Install electrical metallic /nonmetallic (PVC conduit)


 Interpret electrical wiring diagrams and mechanical drawings
 Identify proper usage and types of conduits, fittings in electrical
installation.
 Identify technique of installation and bending of conduit and fitting.
 Apply proper usage of safety harness.
 Interpret plan and details drawing.
 Practice proper handling of materials, tools and equipment
 Practice procedure in proper bending of conduits
 Practice procedure in installing conduits
 Perform the installation economically

UNIT II : Install wire ways and cable tray


 Identify use of materials, tools and equipment
 Interpret electrical/mechanical drawing
 Determine suitability for installation and used of bus way, cable tray,
fittings and panels, conformity with the provision of the PEC Code.
 Practice wire way and cable tray installation
 Practice proper use of safety harness (PPE)
 Interpret technical plan
 Use effective communication skills (written and oral )
 Practice effective use of measuring tape
 Perform the installation economically

UNIT III : Install auxiliary terminal cabinet and distribution panel


 Learn and apply mensuration
 Determine blue print reading and materials specification.
 Read proper proofing standards
 Perform proper procedure in installation of auxiliary terminal cabinet and
distribution panel.
 Apply proper use of safety harness (PPE).
 Interpret technical plan
 Practice effective use of measuring devices
 Practice proper handling of tools and equipment
 Install terminal cabinet and distribution panel
 Perform the installation economically

UNIT IV : Prepare for cable pulling and installation


 Read and familiarize:
o mensuration
o Blue print reading and materials specification.
o uses of wires, cables and tools
o required sizes of cable based on PEC Wire Table
 Prepare cable for installation
 Interpret technical plan and drawing.
 Practice effective use of measuring tapes
 Practice proper handling of tools and equipment
 Apply methods and techniques in various type of wiring wires and cables.

UNIT V : Perform wiring and cabling lay out


 Read and familiarize:
o Mensuration
o Blue print reading and materials specification
o Application of pulling compound
o Methods in cable pulling
 Interpret technical plan and drawing.
 Apply methods in cable pulling
 Follow procedures in bending radius and loop tolerances for cables

UNIT VI: Notify completion of work


 Describe processes, Operations Systems
- Maintenance of tools & materials
- Storage of tools
 Check and conform the installation based on job requirement
 Practice good housekeeping.
 Perform commissioning activities