TUGAS BESAR PERPETAAN & SIG 2015

BAB IV
PENGOLAHAN DATA
TABEL 4.1 DATA THEODOLITH
Tempat : Area Sekitar FISIP Universitas Brawijaya.

Alat : Theodolith.

PembacaanBakUkur PembacaanSudut Jarak Roll


Posisi Titik Keterangan
Ba Bt Bb Horizontal Vertikal Meter
danTinggiAlat Target
(cm) (cm) (cm) ° ‘ “ ° ‘ “ (m)
A Utara 89 85 81 0 0 0 93 6 20    
1.48 B 142 112 83 7 44 0 89 20 0 57.6  
E 130 105 78 119 11 40 90 44 0 57.1  
1 69 58 47 32 16 40 90 45 20   pohon
2 177 170 163 129 14 10 90 48 10   pojokkavling
 
3 166 155 145 234 48 0 90 14 30   tembokpojok
4 241 225 209 315 6 0 88 1 30   tiang
5 225 210 195 341 28 30 88 3 10   pohon
B A 117 80 51 0 0 0 91 13 30 57.6  
1.5 C 148 117 87 90 58 50 90 8 50 63.3  
1 152 145 138 226 43 10 90 29 0   pohonkecil
  2 123 116 109 326 41 20 90 31 40   pohon
3 206 195 184 25 11 10 89 49 20   tiang

ALBERTUS EKY YULIAN - 145060100111004 37


TUGAS BESAR PERPETAAN & SIG 2015

4 158 142 126 130 49 30 90 12 50   pohon


5 210 200 190 153 12 40 87 34 0   batu bata
C B 180 148 118 0 0 0 89 37 40 63.3  
1.55 D 151 113 63 88 0 0 90 40 0 86.3  
1 169 164 160 43 28 50 89 19 20   Tembokpojok
2 143 132 121 110 1 10 90 53 10   Pintu gudang
sampingtama
  3 105 95 85 173 0 0 90 30 40  
n
4 105 98 91 225 39 30 90 42 20   pohon
5 89 79 70 317 31 0 90 43 40   tiang
D C 180 137 94 0 0 0 89 15 0 86.3  
1.57 E 171 160 149 159 39 10 90 10 10 21.23  
1 179 173 168 82 45 10 88 0 10   tembokpojok
2 134 129 124 165 35 10 91 53 20   pohon
  3 109 91 74 230 26 20 91 54 0   pojokkavling
4 128 120 112 255 45 0 90 6 0   pohon
5 139 130 121 9 19 10 90 8 10   mipa corner
E D 83 72 61 0 0 0 91 14 20 21.23  
1.5 A 223 197 171 90 46 10 88 43 10 57.1  
1 134 124 114 80 11 10 89 51 10   pohon
2 149 139 129 168 32 30 89 50 40   pohon
  3 154 146 138 240 37 30 89 51 0   pohon
4 150 144 137 300 54 40 89 53 6   gedung
5 174 169 164 38 26 40 87 16 40   pohon

ALBERTUS EKY YULIAN - 145060100111004 38


TUGAS BESAR PERPETAAN & SIG 2015

TABEL 4.2 DATA WATERPASS


Tempat : Area Sekitar FISIP Universitas Brawijaya.

Alat : Waterpass.

ALBERTUS EKY YULIAN - 145060100111004 39


TUGAS BESAR PERPETAAN & SIG 2015

ALBERTUS EKY YULIAN - 145060100111004 40


TUGAS BESAR PERPETAAN & SIG 2015

4. 1. Perhitungan

PERHITUNGAN THEODOLITH

TABEL 4.3 PERHITUNGAN JARAK OPTIS TITIK POLIGON

Pembacaan Baak
Pembacaan Sudut (ba-
2
cos θ Ukur Jarak Optis
Slug bb)
Vertikal θ Ba Bt Bb
(°) (') (") (°) (') (") (m) (m) (m) (m)
                         
0,9998 58,9920126
A-B 89 20 0 0 -40 0 1,42 1,12 0,83 0,59
6 1
0,9995 65,9698349
B-A 91 13 30 1 13 30 1,17 0,8 0,51 0,66
4 1
                      0 0
0,9999 60,9995972
B-C 90 8 50 0 8 50 1,48 1,17 0,87 0,61
9 5
0,9999 61,9973833
C-B 89 37 40 0 -22 -20 1,8 1,48 1,18 0,62
6 5
                      0 0
0,9998 87,9880866
C-D 90 40 0 0 40 0 1,51 1,13 0,63 0,88
6 1
0,9998 85,9852649
D-C 89 15 0 0 -45 0 1,8 1,37 0,94 0,86
3 7
                      0 0
0,9999 21,9998075
D-E 90 10 10 0 10 10 1,71 1,6 1,49 0,22
9 9

ALBERTUS EKY YULIAN - 145060100111004 41


TUGAS BESAR PERPETAAN & SIG 2015

0,9995 21,9897157
E-D 91 14 20 1 14 20 0,83 0,72 0,61 0,22
3 1
                      0 0
51,9740293
E-A 88 43 10 -1 -16 -50 0,9995 2,23 1,97 1,71 0,52
6
0,9998 51,9914820
A-E 90 44 0 0 44 0 1,3 1,05 0,78 0,52
4 1

TABEL 4.4 PERHITUNGAN JARAK OPTIS TITIK DETAIL

(ba- Jarak
Posisi & Pembacaan Baak Ukur
Titik Vertikal θ 2
cos θ bb) Optis
Tinggi Alat
Target Ba Bt Bb
(m)
(°) (') (") (°) (') (") (cm) (cm) (cm) (m)
                           
0,9998 21,996
A 1 90 45 20 0 45 20 0,690 0,580 0,470 0,220
3 2
13,997
h= 148 cm 2 90 48 10 0 48 10 0,9998 1,770 1,700 1,630 0,140
3
0,9999 20,999
  3 90 14 30 0 14 30 1,660 1,550 1,450 0,210
8 6
0,9988 31,962
  4 88 1 30 -1 -58 -30 2,410 2,250 2,090 0,320
1 0
0,9988 29,965
  5 88 3 10 -1 -56 -50 2,250 2,100 1,950 0,300
5 4
                           
0,9999 13,999
B 1 90 29 0 0 29 0 1,520 1,450 1,380 0,140
3 0
h= 150 cm 2 90 31 40 0 31 40 0,9999 1,230 1,160 1,090 0,140 13,998

ALBERTUS EKY YULIAN - 145060100111004 42


TUGAS BESAR PERPETAAN & SIG 2015

2 8
0,9999 21,999
  3 89 49 20 0 -10 -40 2,060 1,950 1,840 0,220
9 8
0,9999 31,999
  4 90 12 50 0 12 50 1,580 1,420 1,260 0,320
9 6
0,9979 19,958
  5 87 34 0 -2 -36 0 2,100 2,000 1,900 0,200
4 8
                           
0,9998
C 1 89 19 20 0 -40 -40 1,690 1,640 1,600 0,090 8,9987
6
0,9997 21,994
h= 155 cm 2 90 53 10 0 53 10 1,430 1,320 1,210 0,220
6 7
0,9999 19,998
  3 90 30 40 0 30 40 1,050 0,950 0,850 0,200
2 4
0,9998 13,997
  4 90 42 20 0 42 20 1,050 0,980 0,910 0,140
5 9
0,9998 18,996
  5 90 43 40 0 43 40 0,890 0,790 0,700 0,190
4 9
                           
0,9987 10,986
D 1 88 0 10 -1 -59 -50 1,790 1,730 1,680 0,110
9 6
0,9989
h= 157 cm 2 91 53 20 1 53 20 1,340 1,290 1,240 0,100 9,9891
1
34,961
  3 91 54 0 1 54 0 0,9989 1,090 0,910 0,740 0,350
5
16,000
  4 90 6 0 0 6 0 1 1,280 1,200 1,120 0,160
0
0,9999 17,999
  5 90 8 10 0 8 10 1,390 1,300 1,210 0,180
9 9
                           

ALBERTUS EKY YULIAN - 145060100111004 43


TUGAS BESAR PERPETAAN & SIG 2015

0,9999 19,999
E 1 89 51 10 0 -8 -50 1,340 1,240 1,140 0,200
9 9
0,9999 19,999
h= 150 cm 2 89 50 40 0 -9 -40 1,490 1,390 1,290 0,200
9 8
0,9999 15,999
  3 89 51 0 0 -9 0 1,540 1,460 1,380 0,160
9 9
12,999
  4 89 53 6 0 -6 -54 1 1,500 1,440 1,370 0,130
9
0,9977
  5 87 16 40 -2 -43 -20 1,740 1,690 1,640 0,100 9,9774
4

TABEL 4.5 PERHITUNGAN JARAK RERATA POLIGON


Jarak Optis
Jarak Roll Meter Jarak Rerata
Slag Depan Belakang
(m) (m) (m) (m)
         
A-B 58,99201 65,96983 57,6 60,8539
B-C 60,99960 61,99738 63,3 62,0990
C-D 87,98809 85,98526 86,3 86,7578
D-E 21,99981 21,98972 21,23 21,7398
E-A 51,97403 51,99148 57,1 53,6885

ALBERTUS EKY YULIAN - 145060100111004 44


TUGAS BESAR PERPETAAN & SIG 2015

TABEL 4. 6 PERHITUNGAN BENANG TENGAH RATA-RATA


Pembacaan Baak Ukur BTR
Sudut Vertikal Θ
Slag Ba Bt Bb
(°) (') (") (°) (') (") (m) (m) (m) (m)
A-B 89 20 0 0 -40 0 1,42 1,12 0,83 1,123
B-C 90 8 50 0 8 50 1,48 1,17 0,87 1,173
C-D 90 40 0 0 40 0 1,51 1,13 0,63 1,100
D-E 90 10 10 0 10 10 1,71 1,6 1,49 1,600
E-A 88 43 10 -1 -16 -50 2,23 1,97 1,71 1,970
                     
Pembacaan Baak Ukur BTR
Sudut Vertikal Θ
Slag Ba Bt Bb
(°) (') (") (°) (') (") (m) (m) (m) (m)
B-A 91 13 30 1 13 30 1,17 0,8 0,51 0,820
C-B 89 37 40 0 -22 -20 1,8 1,48 1,18 1,485
D-C 89 15 0 0 -45 0 1,8 1,37 0,94 1,370
E-D 91 14 20 1 14 20 0,83 0,72 0,61 0,720
A-E 90 44 0 0 44 0 1,3 1,05 0,78 1,045

ALBERTUS EKY YULIAN - 145060100111004 45


TUGAS BESAR PERPETAAN & SIG 2015

TABEL 4.7 PERHITUNGAN KOORDINAT POLIGON POLIGON


Sudut Dalam Azimuth Koordinat
D D sin α D cos α
Titik S Α x y
(°) (') (") (°) (') (") (m) (m) (m) (m) (m)
                       
A 111 27 40 7 33 38 60,853949 8,0067957 60,3249 117,16 62,1049
  0 -10 -22         1,1227018 5,38064    
                       
B 90 58 50 278 22 6 62,098994 -61,437821 9,03765 126,289 127,81
  0 -10 -22         1,1456718 5,49072    
                       
C 88 0 0 186 11 44 86,757784 -9,3630943 -86,251 65,9971 142,339
  0 -10 -22         1,6006047 7,67103    
                       
D 159 39 10 165 40 32 21,739841 5,3787064 -21,064 58,2346 63,7588
  0 -10 -22         0,4010809 1,92221    
                       
E 90 46 10 76 16 20 53,688504 52,154848 12,7408 64,0144 44,617
  0 -10 -22         0,9905056 4,74708    
                       
ΣS 540 51 50 285,13907 -5,26056 -25,212
fS 0 51 50 5,26056 25,2117
ΣS' 540 0 0

Gambar 4.1. Koordinat Poligon


ALBERTUS EKY YULIAN - 145060100111004 46
TUGAS BESAR PERPETAAN & SIG 2015

160 TABEL 4. 8 PERHITUNGAN KOORDINAT


TITIK DETAIL

140 Sudut Dalam Azimuth Koordinat


Titik D D sin α D cos α
ΔS Α x y
Detail
(°) (') (") (°) (') (") (m) (m) (m) (m) (m)
120
                       
A 111 27 40 7 33 38 60,853949 8,0068 60,3249 117,16 62,1049
100 1 32 16 40 32 16 40 21,996175 11,7465 18,5971 128,906 80,7019
2 129 3 10 129 3 10 13,997252 10,8698 -8,8188 128,03 53,2861
3 234 48 0 234 48 0 20,999626 -17,16 -12,105 100 50
80
4 315 6 0 315 6 0 31,961993 -22,561 22,64 94,5987 84,7448
5 341 28 30 341 28 30 29,965363 -9,5205 28,4127 107,639 90,5176
60                        
B 90 58 50 278 22 6 62,098994 -61,438 9,03765 126,289 127,81
1 226 43 10 54 6 26 13,999004 11,3408 8,2072 137,63 136,018
40 2 326 41 20 154 4 36 13,998812 6,11983 -12,59 132,409 115,22
3 25 11 10 212 34 26 21,999788 -11,844 -18,539 114,445 109,271
20 4 130 49 30 318 12 46 31,999554 -21,323 23,8597 104,966 151,67
5 153 12 40 340 35 56 19,958844 -6,6299 18,8255 119,659 146,636
                       
0 C 88 0 0 186 11 44 86,757784 -9,3631 -86,251 65,9971 142,339
50 60 70 80 90 100 110 120 130 140
1 43 28 50 141 40 34 8,9987406 5,58017 -7,0597 71,5773 135,279
2 110 1 10 208 12 54 21,994738 -10,399 -19,381 55,5984 122,957
3 173 0 0 271 11 44 19,998409 -19,994 0,41726 46,003 142,756
4 225 39 30 323 51 14 13,997877 -8,2566 11,3035 57,7405 153,642
5 317 31 0 55 42 44 18,996935 15,6956 10,7019 81,6927 153,041

ALBERTUS EKY YULIAN - 145060100111004 47


TUGAS BESAR PERPETAAN & SIG 2015

                       
D 159 39 10 165 40 32 21,739841 5,37871 -21,064 58,2346 63,7588
1 82 45 10 88 46 32 10,986639 10,9841 0,23477 69,2187 63,9935
2 165 35 10 171 36 32 9,9891355 1,45771 -9,8822 59,6923 53,8766
3 230 26 20 236 27 42 34,961526 -29,141 -19,316 29,0936 44,4427
4 255 45 0 261 46 22 15,999951 -15,835 -2,2896 42,3993 61,4692
5 9 19 10 15 20 32 17,999898 4,76248 17,3584 62,9971 81,1172
                       
E 90 46 10 76 16 20 53,688504 52,1548 12,7408 64,0144 44,617
1 80 11 10 65 41 20 19,999868 18,2263 8,23377 82,2407 52,8508
2 168 32 30 154 2 40 19,999842 8,75341 -17,983 72,7678 26,6345
3 240 37 30 226 7 40 15,99989 -11,534 -11,089 52,4803 33,5282
4 300 54 40 286 24 50 12,999948 -12,47 3,67345 51,5442 48,2905
5 38 26 40 23 56 50 9,9774433 4,04979 9,11858 68,0642 53,7356
                       

ALBERTUS EKY YULIAN - 145060100111004 48


TUGAS BESAR PERPETAAN & SIG 2015

Gambar 4.2. Koordinat Poligon dan Titik Detail

160
A1
A2
140 A3
A4
A5
B1
120 B2
B3
B4
100 B5
C1
C2
C3
80
C4
C5
D1
60 D2
D3
D4
D5
40
E1
E2
E3
20 E4
20 40 60 80 100 120 140E5

ALBERTUS EKY YULIAN - 145060100111004 49


TUGAS BESAR PERPETAAN & SIG 2015

TABEL 4.9 PERHITUNGAN ELEVASI TITIK POLIGON


Tingg Titik
Posisi Vertikal Θ Dop D tan θ BTR Δh₀ Δhr Elevasi
i Alat Targe
Alat
(m) t (°) (') (") (°) (') (") (m) (m) (m) (m) (m) (m)
                             
60,8539
A 1,48 B 89 20 0 0 -40 0 -0,7081 1,1225 -0,3506   69,9839
5
0,8153
                           
4
                          -0,304  
60,8539 1,3012 1,9812
B 1,5 A 91 13 30 1 13 30 0,82    
5 7 7
62,0989 0,1595 0,4870
  1,5 C 90 8 50 0 8 50 1,1725   70,4953
9 6 6
0,0743
                           
2
                          -0,304  
62,0989
C 1,55 B 89 37 40 0 -22 -20 -0,4034 1,485 -0,3384    
9
86,7577 1,0095 1,4595
  1,55 D 90 40 0 0 40 0 1,1   70,2657
8 2 2
                          0,2619  
                          -0,304  
86,7577
D 1,57 C 89 15 0 0 -45 0 -1,1357 1,37 -0,9357    
8
21,7398 0,0642 0,0342
  1,57 E 90 10 10 0 10 10 1,6   70,2236
4 9 9
0,6422
                           
2

ALBERTUS EKY YULIAN - 145060100111004 50


TUGAS BESAR PERPETAAN & SIG 2015

                          -0,304  
21,7398 0,4701 1,2501
E 1,5 D 91 14 20 1 14 20 0,72    
4 5 5
  1,5 A 88 43 10 -1 -16 -50 53,6885 -1,2001 1,97 -1,6701   70,5619
                          -0,274  
                          -0,304  
A 1,48 E 90 44 0 0 44 0 53,6885 0,6872 1,045 1,1222    
                            69,9839
                        Σ Δhr 1,520  
                        f Δhr -1,520  

ALBERTUS EKY YULIAN - 145060100111004 51


TUGAS BESAR PERPETAAN & SIG 2015

TABEL 4.10 PERHITUNGAN ELEVASI TITIK DETAIL


Pembacaan Baak
Tingg Titik Ukur
Posis Vertikal θ D D tan θ BTR Δh Elevasi
i Alat Targe
i Alat Ba Bt Bb
t
(m) (°) (') (") (°) (') (") (m) (m) (m) (m) (m) (m) (m) (m)
                                 
69,983
A 1,48                            
9
21,996174 0,2900 1,1900 71,174
    1 90 45 20 0 45 20 0,69 0,58 0,47 0,58
5 8 8 0
13,997251 0,1961 69,960
    2 90 48 10 0 48 10 1,77 1,7 1,63 1,7 -0,0239
8 3 1
20,999626 0,0885 1,552 0,0160 70,000
    3 90 14 30 0 14 30 1,66 1,55 1,45
4 7 5 7 0
31,961992 68,111
    4 88 1 30 -1 -58 -30 2,41 2,25 2,09 -1,1022 2,25 -1,8722
7 8
68,345
    5 88 3 10 -1 -56 -50 2,25 2,1 1,95 29,965363 -1,0188 2,1 -1,6388
1
                                 
70,495
B 1,5                            
3
13,999003 70,663
    1 90 29 0 0 29 0 1,52 1,45 1,38 0,1181 1,45 0,1681
8 4
13,998812 0,1289 0,4689 70,964
    2 90 31 40 0 31 40 1,23 1,16 1,09 1,16
1 5 5 3
21,999788 69,977
    3 89 49 20 0 -10 -40 2,06 1,95 1,84 -0,0683 1,95 -0,5183
2 0
31,999554 0,1194 0,1994 70,694
    4 90 12 50 0 12 50 1,58 1,42 1,26 1,42
1 6 6 8

ALBERTUS EKY YULIAN - 145060100111004 52


TUGAS BESAR PERPETAAN & SIG 2015

69,089
    5 87 34 0 -2 -36 0 2,1 2 1,9 19,958844 -0,9063 2 -1,4063
0
                                 
70,265
C 1,55                            
7
8,9987406 1,642 70,066
    1 89 19 20 0 -40 -40 1,69 1,64 1,6 -0,1065 -0,199
3 5 7
21,994738 0,3401 0,5701 70,835
    2 90 53 10 0 53 10 1,43 1,32 1,21 1,32
4 9 9 8
19,998408 71,044
    3 90 30 40 0 30 40 1,05 0,95 0,85 0,1784 0,95 0,7784
5 1
13,997877 0,1723 0,7423 71,008
    4 90 42 20 0 42 20 1,05 0,98 0,91 0,98
1 8 8 0
18,996934 0,2413 0,792 0,9988 71,264
    5 90 43 40 0 43 40 0,89 0,79 0,7
6 1 5 1 5
                                 
70,223
D 1,57                            
6
10,986639 1,732 69,678
    1 88 0 10 -1 -59 -50 1,79 1,73 1,68 -0,3831 -0,5456
5 5 0
9,9891354 0,3294 0,6094 70,833
    2 91 53 20 1 53 20 1,34 1,29 1,24 1,29
9 3 3 0
34,961525 1,1597 0,912 1,8172 72,040
    3 91 54 0 1 54 0 1,09 0,91 0,74
7 9 5 9 9
15,999951 0,0279 0,3979 70,621
    4 90 6 0 0 6 0 1,28 1,2 1,12 1,2
3 3 3 5
17,999898 0,0427 0,3127 70,536
    5 90 8 10 0 8 10 1,39 1,3 1,21 1,3
4 6 6 4
                                 
E 1,5                             70,561

ALBERTUS EKY YULIAN - 145060100111004 53


TUGAS BESAR PERPETAAN & SIG 2015

9
0,2086 70,770
    1 89 51 10 0 -8 -50 1,34 1,24 1,14 19,999868 -0,0514 1,24
1 5
19,999841 0,0537 70,615
    2 89 50 40 0 -9 -40 1,49 1,39 1,29 -0,0562 1,39
9 6 6
15,999890 70,560
    3 89 51 0 0 -9 0 1,54 1,46 1,38 -0,0419 1,46 -0,0019
3 0
12,999947 1,437 0,0364 70,598
    4 89 53 6 0 -6 -54 1,5 1,44 1,37 -0,0261
6 5 1 3
9,9774433 69,897
    5 87 16 40 -2 -43 -20 1,74 1,69 1,64 -0,4744 1,69 -0,6644
3 4
                                 

ALBERTUS EKY YULIAN - 145060100111004 54


TUGAS BESAR PERPETAAN & SIG 2015

TABEL 4.11 PERHITUNGAN JARAK KONTUR

Elevasi Posisi Elevasi Titik


Δh D Elevasi Kontur Jarak Kontur Cek Jarak Kontur
Posisi Alat Titik Target Alat Target

(m) (m) (m) (m) (m) (m) (m)


                 
E 69,98393 70,56185 0,5779 53,6885 69,9839 0,0000 53,6885
          70,0000 1,4933 52,1952
          70,1000 10,7831 42,9054
          70,2000 20,0730 33,6155
          70,3000 29,3628 24,3257
          70,4000 38,6527 15,0359
          70,5000 47,9425 5,7460
          70,5619 53,6885 0,0000
               
B 69,98393 70,4953 0,5114 60,8539 69,9839 0,0000 60,8539
A           70,0000 1,9129 58,9411
          70,1000 13,8129 47,0410
          70,2000 25,7130 35,1410
          70,3000 37,6130 23,2409
          70,4000 49,5131 11,3409
          70,4953 60,8539 0,0000
               
1 69,98393 71,174 1,1901 21,9962 69,9839 0,0000 21,9962
          70,0000 0,2971 21,6991
          70,1000 2,1454 19,8508
          70,2000 3,9937 18,0025
          70,3000 5,8420 16,1542

ALBERTUS EKY YULIAN - 145060100111004 55


TUGAS BESAR PERPETAAN & SIG 2015

          70,4000 7,6903 14,3059


          70,5000 9,5386 12,4576
          70,6000 11,3869 10,6093
          70,7000 13,2352 8,7610
          70,8000 15,0835 6,9127
          70,9000 16,9318 5,0644
          71,0000 18,7801 3,2161
          71,1000 20,6284 1,3678
          71,1740 21,9962 0,0000
               
2 69,98393 69,96006 -0,0239 13,9973 69,9839 0,0000 13,9973
          69,9601 13,9973 0,0000
               
3 69,98393 70 0,0161 20,9996 69,9839 0,0000 20,9996
          70,0000 20,9996 0,0000
               
4 69,98393 68,11175 -1,8722 31,9620 69,9839 0,0000 31,9620
          69,9000 1,4328 30,5292
          69,8000 3,1400 28,8220
          69,7000 4,8472 27,1148
          69,6000 6,5544 25,4076
          69,5000 8,2616 23,7004
          69,4000 9,9688 21,9931
          69,3000 11,6761 20,2859
          69,2000 13,3833 18,5787
          69,1000 15,0905 16,8715
          69,0000 16,7977 15,1643
          68,9000 18,5049 13,4571

ALBERTUS EKY YULIAN - 145060100111004 56


TUGAS BESAR PERPETAAN & SIG 2015

          68,8000 20,2121 11,7499


          68,7000 21,9193 10,0427
          68,6000 23,6265 8,3354
          68,5000 25,3338 6,6282
          68,4000 27,0410 4,9210
          68,3000 28,7482 3,2138
          68,2000 30,4554 1,5066
          68,1118 31,9620 0,0000
               
5 69,98393 68,34515 -1,6388 29,9654 69,9839 0,0000 29,9654
          69,9000 1,5346 28,4308
          69,8000 3,3631 26,6022
          69,7000 5,1916 24,7737
          69,6000 7,0202 22,9452
          69,5000 8,8487 21,1167
          69,4000 10,6772 19,2882
          69,3000 12,5057 17,4597
          69,2000 14,3342 15,6311
          69,1000 16,1627 13,8026
          69,0000 17,9913 11,9741
          68,9000 19,8198 10,1456
          68,8000 21,6483 8,3171
          68,7000 23,4768 6,4885
          68,6000 25,3053 4,6600
          68,5000 27,1339 2,8315
          68,4000 28,9624 1,0030
          68,3451 29,9654 0,0000

ALBERTUS EKY YULIAN - 145060100111004 57


TUGAS BESAR PERPETAAN & SIG 2015

Elevasi Posisi Elevasi Titik


Δh D Elevasi Kontur Jarak Kontur Cek Jarak Kontur
Posisi Alat Titik Target Alat Target

(m) (m) (m) (m) (m) (m) (m)


                 
A 70,4953 69,98393 -0,5114 60,8539 70,4953 0,0000 60,8539
          70,4000 11,3409 49,5131
          70,3000 23,2409 37,6130
          70,2000 35,1410 25,7130
          70,1000 47,0410 13,8129
          70,0000 58,9411 1,9129
          69,9839 60,8539 0,0000
               
C 70,4953 70,26566 -0,2296 62,0990 70,4953 0,0000 62,0990
          70,4000 25,7707 36,3283
          70,3000 52,8120 9,2870
          70,2657 62,0990 0,0000
B
               
1 70,4953 70,6634 0,1681 13,9990 70,4953 0,0000 13,9990
          70,5000 0,3913 13,6077
          70,6000 8,7194 5,2797
          70,6634 13,9990 0,0000
               
2 70,4953 70,96425 0,4690 13,9988 70,4953 0,0000 13,9988
          70,5000 0,1403 13,8585
          70,6000 3,1254 10,8734
          70,7000 6,1105 7,8883
          70,8000 9,0956 4,9032
          70,9000 12,0807 1,9181

ALBERTUS EKY YULIAN - 145060100111004 58


TUGAS BESAR PERPETAAN & SIG 2015

          70,9643 13,9988 0,0000


               
3 70,4953 69,97704 -0,5183 21,9998 70,4953 0,0000 21,9998
          70,4000 4,0455 17,9543
          70,3000 8,2904 13,7094
          70,2000 12,5353 9,4645
          70,1000 16,7802 5,2196
          70,0000 21,0251 0,9746
          69,9770 21,9998 0,0000
               
4 70,4953 70,69476 0,1995 31,9996 70,4953 0,0000 31,9996
          70,5000 0,7539 31,2457
          70,6000 16,7972 15,2024
          70,6948 31,9996 0,0000
               
5 70,4953 69,08898 -1,4063 19,9588 70,4953 0,0000 19,9588
          70,4000 1,3525 18,6063
          70,3000 2,7718 17,1871
          70,2000 4,1910 15,7679
          70,1000 5,6102 14,3487
          70,0000 7,0294 12,9294
          69,9000 8,4486 11,5102
          69,8000 9,8678 10,0910
          69,7000 11,2871 8,6718
          69,6000 12,7063 7,2526
          69,5000 14,1255 5,8333
          69,4000 15,5447 4,4141
          69,3000 16,9639 2,9949

ALBERTUS EKY YULIAN - 145060100111004 59


TUGAS BESAR PERPETAAN & SIG 2015

          69,2000 18,3832 1,5757


          69,1000 19,8024 0,1565
          69,0890 19,9588 0,0000

Elevasi Posisi Elevasi Titik


Δh D Elevasi Kontur Jarak Kontur Cek Jarak Kontur
Posisi Alat Titik Target Alat Target

(m) (m) (m) (m) (m) (m) (m)


                 
B 70,26566 70,4953 0,2296 62,0990 70,2657 0,0000 62,0990
          70,3000 9,2870 52,8120
          70,4000 36,3283 25,7707
          70,4953 62,0990 0,0000
               
D 70,26566 70,22359 -0,0421 86,7578 70,2657 0,0000 86,7578
          70,2236 86,7578 0,0000
               
1 70,26566 70,0667 -0,1990 8,9987 70,2657 0,0000 8,9987
C           70,2000 2,9696 6,0291
          70,1000 7,4926 1,5061
          70,0667 8,9987 0,0000
               
2 70,26566 70,83584 0,5702 21,9947 70,2657 0,0000 21,9947
          70,3000 1,3248 20,6699
          70,4000 5,1822 16,8125
          70,5000 9,0397 12,9550
          70,6000 12,8972 9,0976
          70,7000 16,7546 5,2401

ALBERTUS EKY YULIAN - 145060100111004 60


TUGAS BESAR PERPETAAN & SIG 2015

          70,8000 20,6121 1,3827


          70,8358 21,9947 0,0000
               
3 70,26566 71,04406 0,7784 19,9984 70,2657 0,0000 19,9984
          70,3000 0,8823 19,1161
          70,4000 3,4515 16,5469
          70,5000 6,0207 13,9777
          70,6000 8,5898 11,4086
          70,7000 11,1590 8,8394
          70,8000 13,7282 6,2703
          70,9000 16,2973 3,7011
          71,0000 18,8665 1,1319
          71,0441 19,9984 0,0000
               
4 70,26566 71,00804 0,7424 13,9979 70,2657 0,0000 13,9979
          70,3000 0,6476 13,3503
          70,4000 2,5331 11,4648
          70,5000 4,4186 9,5792
          70,6000 6,3042 7,6937
          70,7000 8,1897 5,8082
          70,8000 10,0752 3,9226
          70,9000 11,9608 2,0371
          71,0000 13,8463 0,1516
          71,0080 13,9979 0,0000
               
5 70,26566 71,26447 0,9988 18,9969 70,2657 0,0000 18,9969
          70,3000 0,6532 18,3437
          70,4000 2,5551 16,4418

ALBERTUS EKY YULIAN - 145060100111004 61


TUGAS BESAR PERPETAAN & SIG 2015

          70,5000 4,4571 14,5398


          70,6000 6,3590 12,6379
          70,7000 8,2610 10,7359
          70,8000 10,1629 8,8340
          70,9000 12,0649 6,9320
          71,0000 13,9668 5,0301
          71,1000 15,8688 3,1281
          71,2000 17,7707 1,2262
          71,2645 18,9969 0,0000

Elevasi Posisi Elevasi Titik


Δh D Elevasi Kontur Jarak Kontur Cek Jarak Kontur
Posisi Alat Titik Target Alat Target

(m) (m) (m) (m) (m) (m) (m)


                 
C 70,22359 70,26566 0,0421 86,7578 70,2236 0,0000 86,7578
          70,2657 86,7578 0,0000
               
E 70,22359 70,56185 0,3383 21,7398 70,2236 0,0000 21,7398
          70,3000 4,9106 16,8292
          70,4000 11,3376 10,4022
D           70,5000 17,7646 3,9753
          70,5619 21,7398 0,0000
               
1 70,22359 69,67797 -0,5456 10,9866 70,2236 0,0000 10,9866
          70,2000 0,4751 10,5116
          70,1000 2,4887 8,4980
          70,0000 4,5022 6,4844

ALBERTUS EKY YULIAN - 145060100111004 62


TUGAS BESAR PERPETAAN & SIG 2015

          69,9000 6,5158 4,4708


          69,8000 8,5294 2,4573
          69,7000 10,5429 0,4437
          69,6780 10,9866 0,0000
               
2 70,22359 70,83303 0,6094 9,9891 70,2236 0,0000 9,9891
          70,3000 1,2524 8,7368
          70,4000 2,8914 7,0977
          70,5000 4,5305 5,4586
          70,6000 6,1696 3,8195
          70,7000 7,8087 2,1804
          70,8000 9,4478 0,5414
          70,8330 9,9891 0,0000
               
3 70,22359 72,04089 1,8173 34,9615 70,2236 0,0000 34,9615
          70,3000 1,4699 33,4916
          70,4000 3,3937 31,5678
          70,5000 5,3176 29,6440
          70,6000 7,2414 27,7201
          70,7000 9,1652 25,7963
          70,8000 11,0890 23,8725
          70,9000 13,0129 21,9487
          71,0000 14,9367 20,0248
          71,1000 16,8605 18,1010
          71,2000 18,7843 16,1772
          71,3000 20,7082 14,2534
          71,4000 22,6320 12,3295
          71,5000 24,5558 10,4057

ALBERTUS EKY YULIAN - 145060100111004 63


TUGAS BESAR PERPETAAN & SIG 2015

          71,6000 26,4796 8,4819


          71,7000 28,4035 6,5581
          71,8000 30,3273 4,6342
          71,9000 32,2511 2,7104
          72,0000 34,1749 0,7866
          72,0409 34,9615 0,0000
               
4 70,22359 70,62152 0,3979 16,0000 70,2236 0,0000 16,0000
          70,3000 3,0722 12,9278
          70,4000 7,0930 8,9069
          70,5000 11,1139 4,8861
          70,6000 15,1347 0,8652
          70,6215 16,0000 0,0000
               
5 70,22359 70,53635 0,3128 17,9999 70,2236 0,0000 17,9999
          70,3000 4,3973 13,6026
          70,4000 10,1525 7,8474
          70,5000 15,9077 2,0922
          70,5364 17,9999 0,0000

Elevasi Posisi Elevasi Titik


Δh D Elevasi Kontur Jarak Kontur Cek Jarak Kontur
Posisi Alat Titik Target Alat Target

(m) (m) (m) (m) (m) (m) (m)


                 
D 70,56185 70,22359 -0,3383 21,7398 70,5619 0,0000 21,7398
E           70,5000 3,9753 17,7646
          70,4000 10,4022 11,3376

ALBERTUS EKY YULIAN - 145060100111004 64


TUGAS BESAR PERPETAAN & SIG 2015

          70,3000 16,8292 4,9106


          70,2236 21,7398 0,0000
               
A 70,56185 69,98393 -0,5779 53,6885 70,5619 0,0000 53,6885
          70,5000 5,7460 47,9425
          70,4000 15,0359 38,6527
          70,3000 24,3257 29,3628
          70,2000 33,6155 20,0730
          70,1000 42,9054 10,7831
          70,0000 52,1952 1,4933
          69,9839 53,6885 0,0000
               
1 70,56185 70,77046 0,2086 19,9999 70,5619 0,0000 19,9999
          70,6000 3,6573 16,3426
          70,7000 13,2445 6,7554
          70,7705 19,9999 0,0000
               
2 70,56185 70,61561 0,0538 19,9998 70,5619 0,0000 19,9998
          70,6000 14,1911 5,8087
          70,6156 19,9998 0,0000
               
3 70,56185 70,55996 -0,0019 15,9999 70,5619 0,0000 15,9999
          70,5600 15,9999 0,0000
               
4 70,56185 70,59826 0,0364 12,9999 70,5619 0,0000 12,9999
          70,5983 12,9999 0,0000
               
5 70,56185 69,89745 -0,6644 9,9774 70,5619 0,0000 9,9774

ALBERTUS EKY YULIAN - 145060100111004 65


TUGAS BESAR PERPETAAN & SIG 2015

          70,5000 0,9289 9,0486


          70,4000 2,4306 7,5469
          70,3000 3,9323 6,0452
          70,2000 5,4340 4,5434
          70,1000 6,9357 3,0417
          70,0000 8,4374 1,5400
          69,9000 9,9391 0,0383
          69,8974 9,9774 0,0000

ALBERTUS EKY YULIAN - 145060100111004 66


TUGAS BESAR PERPETAAN & SIG 2015

PERHITUNGAN SIPAT DATAR (WATERPASS)

TABEL 4.12 PERHITUNGAN BENANG TENGAH RATA-RATA

Ba+ Bb
(( )+Bt )/ 2
2
BTR =
Pembacaan Baak Ukur Jarak
Posisi & BTR Jarak Optis Keterangan
Titik Memanjang Melintang Langsung
Tinggi Alat
Target Ba Bt Bb Ba Bt Bb
(m)
(m) (m) (m) (m) (m) (m) (m) (m) (m)
A0 A 2,27 2,12 1,96       2,1175 31 28,800  
1,44                      
A A0 0,88 0,74 0,58       0,735 30 28,800  
1,39 B 1,61 1,53 1,46       1,5325 15 15  
  T1       0,97 0,89 0,8 0,8875 17 17  
  T2       1,12 1,03 0,95 1,0325 17 17  
  T3       1,29 1,21 1,13 1,21 16 16  
  T4       1,45 1,38 1,31 1,38 14 14  
  T5       1,62 1,55 1,47 1,5475 15 15  
  T6       1,6 1,52 1,44 1,52 16 16  
  T7       1,49 1,41 1,33 1,41 16 16  
  T8       1,42 1,33 1,25 1,3325 17 17  
B A 1,34 1,27 1,2       1,27 14 15  
1,41 T1       0,88 0,79 0,7 0,79 18 18  
  T2       1 0,92 0,84 0,92 16 16  
  T3       1,23 1,15 1,07 1,15 16 16  
  T4       1,32 1,24 1,17 1,2425 15 15  
  T5       1,39 1,31 1,24 1,3125 15 15  

ALBERTUS EKY YULIAN - 145060100111004 67


TUGAS BESAR PERPETAAN & SIG 2015

  T6       1,31 1,25 1,15 1,24 16 16  


  T7       1,44 1,37 1,29 1,3675 15 15  
  T8       1,83 1,75 1,67 1,75 16 16  
  T9       1,38 1,3 1,22 1,3 16 16  
C 1,56 1,48 1,41       1,4825 15 15  
  T1       0,97 0,87 0,77 0,87 20 20  
  T2       1,2 1,12 1,04 1,12 16 16  
  T3       1,41 1,33 1,26 1,3325 15 15  
  T4       1,53 1,45 1,38 1,4525 15 15  
  T5       1,61 1,53 1,45 1,53 16 16  
  T6       1,56 1,48 1,39 1,4775 17 17  
C B 1,43 1,36 1,29       1,36 14 15  
1,43 D 1,55 1,48 1,41       1,48 14 15  
  T1       0,86 0,77 0,68 0,77 18 18  
  T2       1,23 1,15 1,07 1,15 16 16  
  T3       1,48 1,4 1,32 1,4 16 16  
  T4       1,55 1,47 1,39 1,47 16 16  
  T5       1,58 1,5 1,43 1,5025 15 15  
  T6       1,45 1,37 1,29 1,37 16 16  
  T7       1,7 1,62 1,54 1,62 16 16  
D C 1,41 1,34 1,26       1,3375 15 15  
1,38 E 1,46 1,38 1,31       1,3825 15 15  
  T1       0,88 0,78 0,7 0,785 18 18  
  T2       1,05 0,97 0,89 0,97 16 16  
  T3       1,27 1,19 1,11 1,19 16 16  
  T4       1,38 1,31 1,23 1,3075 15 15  
  T5       1,46 1,38 1,31 1,3825 15 15  
  T6       1,4 1,32 1,24 1,32 16 16  

ALBERTUS EKY YULIAN - 145060100111004 68


TUGAS BESAR PERPETAAN & SIG 2015

E D 1,48 1,41 1,33       1,4075 15 15  


1,41                      

ALBERTUS EKY YULIAN - 145060100111004 69