A PRE-CONSULTATION
Perancang Consultation 7
OSC Consultation
Deliberation/KM Direction
B SUBMISSION PREPARATION 336
(1) Architectural Drawing 28
- To finalize and circulate the architectural drawing for the reference use of KM
Layout,Engineering Plan, Report's reference (LCP,TIA,RSA, Engineering Report)
- Site plan, typical plan, elevation, cross-section, phasing plan (if any), development
data (GFA), etc.
(2) C&S - Drawings & Reports 30
- MASMA Report (2nd Edition) & Plan
- Preliminary Drainage Plan
- Sewerage Engineering Report & Plan
- WSIA/PDC/1 and Checklist PDC1a
- Estimate Water Daily Demand
- Water Supply Conceptual Plan (If any)
All
o
K
* M
According to OSC Timeline/Processing Standard of 90 days
** Subject to Completion of Document Compilation
Subject to LLM & JKR Submission Acknowledgement By TIA/RSA Consultant
*** Subject to Internal/External Clearances