Professional Documents
Culture Documents
Safety and Health Care: General Project Management
Safety and Health Care: General Project Management
(Next pages)
TVC-DAIWA-S-
EXCAVATION PERMIT 01
2.1.1
2 EXCAVATION
TVC-DAIWA-S-
INSPECTION CHECKLIST 01
2.1.2
LIFTING SUPERVISOR
3 CRANE WORK 01 TVC-MHC-S-2.2.1
CHECKLIST
LIFTING GEAR INSPECTION
01 TVC-MHC-S-2.2.1
CHECKLIST
TVC-DAIWA-S-
ENTRY PERMIT 01
2.3.1
5 CONFINED SPACE
TVC-DAIWA-S-
CHECKLIST 01
2.3.2
PERMIT TO WORK AT HEIGHT TVC-DAIWA-S-
01
(> 2m) 2.5.1
LIST OF ELECTRICAL
POWERED TOOL, EQUIPMENT
OF EACH SUBCONTRACTOR. `TVC-DAIWA-S-
01
(EACH 3.2
MONTHLY ELECTRICAL MACHINE/TOOL/EQUIPMENT IS
8 POWERED TOOL ATTACHED PIECTURE)
INSPECTION
CHECKLIST AND
CERTIFICATED STAMP FOR
MONTHLY TESTING,
INSPECTION
REPORT ON INVESTIGATION
13 LABOUR ACCIDENT INTO OCCUPATION ACCIDENT