Professional Documents
Culture Documents
SR No Decription Distribution Rule Page No Item Size Length Quantity Unit WT Total WT Arc Rate Amount
SR No Decription Distribution Rule Page No Item Size Length Quantity Unit WT Total WT Arc Rate Amount
16.03.2020
1 Scrap shifting work 44 Man power 5RX 3 HRS J1/4 700/8HRS 1313.00
3 Disment of water line MEE 44 Ms pipe 1.5" 3.000 F1/7 42/MTR 126.00
17.03.2020 - - -
18.03.2020 - - -
19.03.2020
20.03.2020
Scrap new ware house 46 Man power 5RX 6HRS J1/4 700/8HRS 2625.00
3 Fab of scale for cooling tower 46 Ms cutting 10.000 F1/5 40/MTR 400.00
2 Shifting of panel board electrical Brine plant 47 Man power 2R X 1HRS J4/4 700/8HRS 175.00
23.03.2020
1 disment of steam line R-208 48 Ms pipe 1" 2.500 F1/7 28/MTR 70.00
2 Disment of air line R-204 48 SS pipe 1/2" 3.000 F1/7 14/MTR 42.00
24.03.2020
1 Disment of charging line SSR-202 49 SS pipe 2" 4.000 F1/7 56/MTR 224.00
TOTAL :- 2 6034.00
SUMMERY
TOTAL 1 20860.00
TOTAL 2 6034.00
INWARDS TWENTY SIX THOUSAND EIGHT HUNDRED NINETY FOUR RUPEES ONLY
KGN MAINTAINNCE FOR
Sr. Proj Distribution
Description Page No
No. Code Rule
26
26
26
26
26
26
26
26
Fixing of Ledder 26
26
26
26
KGN MAINTAINNCE FOR September
Arc Sr.
Item Size Length Quantity Unit Wt Total Wt
No.
0.050x2.00
MS Patti 5 nos 1.1775 0.58875 D1/3
0
0.050x5.70
MS Patti 5 nos 1.1775 1.6779375 D1/3
0
110 660
9 616
9 5
9 15
9 194
17 153
17 138
17 289
35 840
50 350
160 1120
9.6 66
9.6 16
9.6 6
9.6 209