Sr No Decription Distribution rule Page No Item Size Length Quantity Unit Wt Total Wt Arc Rate Amount

16.03.2020

1 Scrap shifting work 44 Man power 5RX 3 HRS J1/4 700/8HRS 1313.00

44 3RX 3 HRS J1/4 700/8HRS 788.00

2 Disment gear box motor R-202 44 500 KG J4/4 1800/NOS 1800.00

Disment of anchor shaft 44 200 KG J4/3 1200/NOS 1200.00

Shifting P-2 to boiler 44 200 X 80 H1/1 7/T/M 112.00

3 Disment of water line MEE 44 Ms pipe 1.5" 3.000 F1/7 42/MTR 126.00

44 "U" clamp 1.5" 1 F1/18 27/NOS 27.00

Modification above line 44 Ms pipe 1.5" 2.500 A2/1 129/MTR 323.00

44 Ms flange 1.5" 3 A1/3 90/NOS 270.00

44 Ms reducer 1.5"X1" 2 A1/4 120/NOS 240.00

44 Ms socket 1" 2 A1/8 40/NOS 80.00

44 "U" clamp 1.5" 1 F1/18 27/NOS 27.00

44 W.meter 1 F1/25 250/NOS 250.00

17.03.2020 - - -

1 Disment of DV Pump DVP-202 45 150 KG J4/3 1200/NOS 1200.00

Shifting P-2 to boiler to P-2 45 150X50X2 H1/1 7/T/M 105.00

Erection of DVP-202 45 150 KG J4/3 1200/NOS 1200.00

2 Shifting of structure ware hosue 45 4R X 4HRS J1/4 700/8HRS 1400.00

18.03.2020 - - -

1 Disment of gear box SSR-105 45 80 KG J4/2 750/NOS 750.00

Shifting P-1 to boiler 45 80 X 60 H1/1 7/T/M 34.00

Shifting of gear box boiler to P-2 45 145 X 60 H1/1 7/T/M 61.00

Erection of Gear box 45 145 KG J4/3 1200/NOS 1200.00

2 Fab of support Switch board P-4 45 2 F1/10 230/NOS 460.00

19.03.2020

1 Shifting of anchor shaft R-202 46 200KG X 60 H1/1 7/T/M 84.00

Erection of shaft 46 200 KG I4/3 1200/NOS 1200.00

Erection of gear box linter motor 46 500 KG I4/4 1800/NOS 1800.00

20.03.2020

1 Disment of WV PUMP WVP-203 46 95 KG I4/2 750/NOS 750.00

Shifting boiler to CT-301 to boiler 46 95 X 90 X 2 H1/1 7/T/M 120.00

Erection of WVP-203 46 95 KG I4/2 750/NOS 750.00

2 Loading & un-loading shifting 46

Scrap new ware house 46 Man power 5RX 6HRS J1/4 700/8HRS 2625.00

3 Fab of scale for cooling tower 46 Ms cutting 10.000 F1/5 40/MTR 400.00

46 Ms butt weld 1" 3 F1/8 55/NOS 165.00


TOTAL :- 1 20860.00
21.03.2020

1 Disment of anchor shaft SSR-105 47 160 KG I4/3 1200/NOS 1200.00

Shifting P-1 to store to P-1 47 160 X 80 X 2 H1/1 7/T/M 179.00

Erection of anchor shaft 47 160 KG J4/3 1200/NOS 1200.00

2 Shifting of panel board electrical Brine plant 47 Man power 2R X 1HRS J4/4 700/8HRS 175.00

23.03.2020

1 disment of steam line R-208 48 Ms pipe 1" 2.500 F1/7 28/MTR 70.00

48 Ms pipe 1" 2.500 A1/1 64/MTR 160.00

48 Ms elbow 1" 3 A1/2 60/NOS 180.00

48 Ms flange 1" 2 A1/3 60/NOS 120.00

48 Paints 2.7 SQ.ft F1/37 8/SQFT 22.00

2 Disment of air line R-204 48 SS pipe 1/2" 3.000 F1/7 14/MTR 42.00

Fab of above line 48 SS pipe 1/2" 3.000 B1/1 55/MTR 165.00

48 SS elbow 1/2" 2 B1/2 45/NOS 90.00

48 SS flange 1/2" 4 B1/3 40/NOS 160.00

48 A.wash 1/2" 8 F1/11 10/NOS 80.00

48 Ms cutting 1" 2 A1/11 15/NOS 30.00

48 Ms butt weld 1" 1 F1/8 55/NOS 55.00

24.03.2020

1 Disment of charging line SSR-202 49 SS pipe 2" 4.000 F1/7 56/MTR 224.00

Modification above line 49 SS pipe 2" 4.400 B2/1 296/MTR 1302.00

49 SS butt weld 2" 2 F1/9 220/NOS 440.00

49 SS valve 1" 1 B1/13 60/NOS 60.00

49 A.wash 2" 2 F1/11 40/NOS 80.00

TOTAL :- 2 6034.00

SUMMERY
TOTAL 1 20860.00

TOTAL 2 6034.00

GRAND TOTAL 26894.00

INWARDS TWENTY SIX THOUSAND EIGHT HUNDRED NINETY FOUR RUPEES ONLY
KGN MAINTAINNCE FOR
Sr. Proj Distribution
Description Page No
No. Code Rule

25 Welding of SS Trolly Canteen 26

26 Disment of Old Ledder Boiler 26

26

26

26

Modi of Above Ledder 26

26

26

26

26

26

Fixing of Ledder 26

26

26

26
KGN MAINTAINNCE FOR September
Arc Sr.
Item Size Length Quantity Unit Wt Total Wt
No.

SS Butt Weld 1" 6 nos I1/3

ISA 50x50 7.600 2 nos 4.5 68.4 D1/3

0.050x2.00
MS Patti 5 nos 1.1775 0.58875 D1/3
0
0.050x5.70
MS Patti 5 nos 1.1775 1.6779375 D1/3
0

MS Saliya 20 mm 0.35 25 nos 2.469136 21.604975 D1/3

ISA 50x50 1.000 2 nos 4.5 9 D1/1

ISA 50x50 0.300 6 nos 4.5 8.1 D1/1

MS Patta 6 mm .100x.800 4 nos 53.2 17.024 D1/1

MS Hole 8 mm 24 nos J1/19

MS Hole 16 mm 7 nos J1/20

Ancher Bolt 16 mm 4 nos J1/24

ISA 50x50 0.760 2 nos 4.5 6.84 D1/4

MS Patti .050x5.750 5 nos 1.1775 1.69265625 D1/4

MS Patti .050x2.0 5 nos 1.1775 0.58875 D1/4

MS Saliya 20 mm 0.350 25 nos 2.46914 21.604975 D1/4


Rate Amount

110 660

9 616

9 5

9 15

9 194

17 153

17 138

17 289

35 840

50 350

160 1120

9.6 66

9.6 16

9.6 6

9.6 209