Megha Irrigation Project, Bagbanna VDC, Parsa

Table 4: Irrigattion Water Requirement & Water Balance


Culturerable Command Area
(CCA) 200 ha Total Coverage 350 ha
Cropping Intensit 175%

Crop CoverageCoverage Water Requirements (l/s)


Crops Code % (Ha) Jan_1 Jan_2 Feb_1 Feb_2 Mar_1 Mar_2 Apr_1 Apr_2 May_1 May_2 Jun_1 Jun_2 Jul_1 Jul_2 Aug_1 Aug_2 Sep_1 Sep_2 Oct_1 Oct_2 Nov_1 Nov_2 Dec_1 Dec_2
M Paddy MP 75.0% 150.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
S Paddy SP 0.0% - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Wheat Wh 20.0% 40.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Maize MM 0.0% - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
S Maize SM 15.0% 30.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Maize WM 0.0% - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Potato MPo - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Potato WPo 10.0% 20.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Pulses MPu 0.0% - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Pulses WPu 0.0% - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Vegetables Mve 25.0% 50.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Vegetables Wve 15.0% 30.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
S Vegetables Sve - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Minor Vegetables WMVe - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Oilseed Woi 15.0% 30.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
S Oilseed Soi - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Ginger Mgi - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Spices and Minor Tubers MSM - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
S Spices and Minor Tubers WSM - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Garlic/Onion Wga - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
W Minor Cereals WMC - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
M Sweet Potato MSPo - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Sugarcane Sur - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tobacco Tbo - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Tea Tea - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Coffee Cof - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Barley Bar - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Millet Mil - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
BuckWheat BWh - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Soya Beans Sbe - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Ground Nut GRn - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
SunFlower Sfo - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Cardamon Crd - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Total Water Requirement #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Farm Application Efficiency 60% 60% 60% 60% 60% 60% 60% 60% 60% 60% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 60% 60%
Field Crop Water Requirement #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Distribution Canal Efficiency 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80% 80%
Terriary Head Water Requirement #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Main Canal Efficiency 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75% 75%
Total Diversion Requirement #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
80% Reliable Half Monthly Flow #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Water Balance #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Max. Diversion Requirement (Lps) = #REF!


10% contingent demand = #REF!
Total Demand (Lps) = #REF! Say 300 lps
Design Duty (Lps/ha) = 1.5

Appendix B - Crop water Reqirement and Water Balance - 1


Future cropping patterns and cropping calendar (for Fully irrigated area)
Name of Project: Megha Irrigation Project, Bagbanna VDC, Parsa

GCA 225 ha

CCA 200 ha
JUN. JUL. AUG. SEPT. OCT. NOV. DEC. JAN. FEB. MAR. APR. MAY
JES. ASA. ASA SHR. SHR. BHA. BHA. ASH. ASH. KAR. KAR. MAN. MAN. PAU PAU. MAG. MAG. FAL. FLA. CHA. CHA. BAI. BAI. JES.
0 0

Wheat (20%)
Wheat

P
E 20 20
R
C
E
N
T
A
G
E Potato
Monsoon Paddy - 75%) (10.00%)
A 40 40
R
E
A

C
O
V W.Vegetable
E (15.00%)
R
A 60 60
G
E
Wheat
B Wheat
Y
Maize (15%)
C
R
O
P 80 80
S

Sum. Vegetable
(25.00%)

Oilseed
(15.00%)
100
100
Cropping Intensity = 175.00%
Total Cropped Area = 350 ha Net Command Area : 200 Ha

Appendix B - Crop water Reqirement and Water Balance - 2


Present cropping patterns and cropping calendar (for Rainfed and Partially irrigated area)
Name of Project: Megha Irrigation Project, Bagbanna VDC, Parsa

GCA 225 ha

CCA 200 ha
JUN. JUL. AUG. SEPT. OCT. NOV. DEC. JAN. FEB. MAR. APR. MAY
JES. ASA. ASA SHR. SHR. BHA. BHA. ASH. ASH. KAR. KAR. MAN. MAN. PAU PAU. MAG. MAG. FAL. FLA. CHA. CHA. BAI. BAI. JES.
0 0

Wheat

Wheat (15%)

P
E 20 20
R
Monsoon Paddy - 50%)
C
E
N
T
A
G
E
Potato
A 40 (5.00%) 40
R
E
A

C
O
V
E
R W.Vegetable
A 60 (5.00%) 60
G
E
Wheat
B Wheat
Y
Maize (15%)
C
R
O
P 80 80
S

Sum. Vegetable
(20.00%)
Oilseed
(10.00%) 100
100
Cropping Intensity = 120.00%
Total Cropped Area = 240 ha Net Command Area : 200 Ha

Appendix B - Crop water Reqirement and Water Balance - 3


Total Command Area: 553
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
Comman
Comman
First crop d area
d area %
Ha
Wheat 445 80 43 42.3 64.9 111.7 45.3 0 0 0 0 0 8.7 35.6
Grape 13 2 10.2 0 0 10 102.7 164.8 198.6 181.5 144.6 94.1 14.2 24.3
Apple 5 1 0 0 14 118 192.5 235.3 215.2 171.6 111.3 21.4 25.5 0
Peach 7 1 10.2 0 0 14 118 192.5 235.3 215.2 171.6 111.3 21.4 25.5
Onion 40 7 0 0 10.3 52.4 181.9 264 277.8 156.2 0 0 0 0
Tomato 29 5 0 0 33.7 87.6 209.7 286.2 306.6 261.8 50.9 0 0 0
Okra 14 3 0 0 10.3 51.8 189.8 264.7 278.8 157.3 0 0 0 0
Comman
Comman
Second Cr d area
d area %
Ha
Rice 364 65.82 0 0 0 0 140 550.8 293.5 289.6 118.1 0 0 0
Mug bean 50 9.04 0 0 0 0 0 0 137.9 263.8 65.2 0 0 0
Corrot 18 3.25 0 0 0 0 0 64.3 209.1 251.5 167.1 0 0 0
Turnip 13 2.35 0 0 0 0 0 64.3 209.1 251.5 167.1 0 0 0
Net Scheme Irrigation required in mm/month for individual Crops
Wheat 445 80.47 34.60 34.04 52.23 89.89 36.45 0.00 0.00 0.00 0.00 0.00 7.00 28.65
Grape 13 2.35 0.24 0.00 0.00 0.24 2.41 3.87 4.67 4.27 3.40 2.21 0.33 0.57
Apple 5 0.90 0.00 0.00 0.13 1.07 1.74 2.13 1.95 1.55 1.01 0.19 0.23 0.00
Peach 7 1.27 0.13 0.00 0.00 0.18 1.49 2.44 2.98 2.72 2.17 1.41 0.27 0.32
Onion 40 7.23 0.00 0.00 0.75 3.79 13.16 19.10 20.09 11.30 0.00 0.00 0.00 0.00
Tomato 29 5.24 0.00 0.00 1.77 4.59 11.00 15.01 16.08 13.73 2.67 0.00 0.00 0.00
Okra 14 2.53 0.00 0.00 0.26 1.31 4.81 6.70 7.06 3.98 0.00 0.00 0.00 0.00
Rice 402 72.69 0.00 0.00 0.00 0.00 92.15 362.55 193.19 190.62 77.74 0.00 0.00 0.00
Mug bean 63 11.39 0.00 0.00 0.00 0.00 0.00 0.00 12.47 23.85 5.90 0.00 0.00 0.00
Corrot 21 3.80 0.00 0.00 0.00 0.00 0.00 2.09 6.81 8.19 5.44 0.00 0.00 0.00
Turnip 13 2.35 0.00 0.00 0.00 0.00 0.00 1.51 4.92 5.91 3.93 0.00 0.00 0.00
irrigation required
Total ### ### ### ### ### ### ### ### 102.25 3.81 7.84 29.54
for crops in
in l/s/h 0.13 0.13 0.2 0.4 0.6 1.60 1.0 1.0 0.4 0.01 0.03 0.114

Irrigated area (% of total area) 85.0 85.0 100.0 100.0 100.0 19.5 19.5 19.5 17.0 9.8 85.0 85.0
Total Command Area: 553
Jan Feb Mar Apr May Jun Jul
Precipitation deficit
Comma Comma
First cro nd area nd area
Ha %
Wheat 445 80 43 42.3 64.9 111.7 45.3 0 0
Grape 13 2 10.2 0 0 10 102.7 164.8 198.6
Apple 5 1 0 0 14 118 192.5 235.3 215.2
Peach 7 1 10.2 0 0 14 118 192.5 235.3
Onion 40 7 0 0 10.3 52.4 181.9 264 277.8
Tomato 29 5 0 0 33.7 87.6 209.7 286.2 306.6
Okra 14 3 0 0 10.3 51.8 189.8 264.7 278.8
Net Scheme Irrigation required in mm/month for idividual Crops
Wheat 445 80 34.60 34.04 52.23 89.89 36.45 0.00 0.00
Grape 13 2 0.24 0.00 0.00 0.24 2.41 3.87 4.67
Apple 5 1 0.00 0.00 0.13 1.07 1.74 2.13 1.95
Peach 7 1 0.13 0.00 0.00 0.18 1.49 2.44 2.98
Onion 40 7 0.00 0.00 0.75 3.79 13.16 19.10 20.09
Tomato 29 5 0.00 0.00 1.77 4.59 11.00 15.01 16.08
Okra 14 3 0.00 0.00 0.26 1.31 4.81 6.70 7.06
irrigation
Total 34.97 34.04 55.12 101.06 71.06 49.24 52.82
required for crops
in l/s/h 0.13 0.13 0.2 0.4 0.3 0.19 0.2

Irrigated area (% of total area) 85.0 85.0 85.0 92.4 100.0 19.5 19.5
Aug Sep Oct Nov Dec

0 0 0 8.7 35.6
181.5 144.6 94.1 14.2 24.3
171.6 111.3 21.4 25.5 0
215.2 171.6 111.3 21.4 25.5
156.2 0 0 0 0
261.8 50.9 0 0 0
157.3 0 0 0 0

0.00 0.00 0.00 7.00 28.65


4.27 3.40 2.21 0.33 0.57
1.55 1.01 0.19 0.23 0.00
2.72 2.17 1.41 0.27 0.32
11.30 0.00 0.00 0.00 0.00
13.73 2.67 0.00 0.00 0.00
3.98 0.00 0.00 0.00 0.00
37.55 9.25 3.81 7.84 29.54

0.1 0.0 0.01 0.03 0.114

19.5 17.0 9.8 85.0 85.0


Total Command Area: 553
Jan Feb Mar Apr May Jun Jul
Precipitation deficit
Comma Comma
Second c nd area nd area
Ha %
Rice 364 66 0 0 0 0 140 550.8 293.5
Mug
50 9 0 0 0 0 0 0 137.9
bean
Corrot 18 3 0 0 0 0 0 64.3 209.1
Turnip 13 2 0 0 0 0 0 64.3 209.1
Grape 13 2 10.2 0 0 10 102.7 164.8 198.6
Apple 5 1 0 0 14 118 192.5 235.3 215.2
Peach 7 1 10.2 0 0 14 118 192.5 235.3
Net Scheme Irrigation required in mm/month for idividual Crops
Rice 364.0 66 0.00 0.00 0.00 0.00 92.15 362.55 193.19
Mug bean 50.0 9 0.00 0.00 0.00 0.00 0.00 0.00 12.47
Corrot 18.0 3 0.00 0.00 0.00 0.00 0.00 2.09 6.81
Turnip 13.0 2 0.00 0.00 0.00 0.00 0.00 1.51 4.92
Grape 13 2 0.20 0.00 0.00 0.20 2.05 3.30 3.97
Apple 5 1 0.00 0.00 0.14 1.18 1.93 2.35 2.15
Peach 7 1 0.10 0.00 0.00 0.14 1.18 1.93 2.35
irrigation
Total - - - - 97.31 373.73 225.86
required for crops
in l/s/h 0.0 0.0 0.0 0.0 0.4 1.4 0.9

Irrigated area (% of total area) 4.00 4.00 4.00 4.00 4.0 75.4 84.5
Aug Sep Oct Nov Dec

289.6 118.1 0 0 0
263.8 65.2 0 0 0
251.5 167.1 0 0 0
251.5 167.1 0 0 0
181.5 144.6 94.1 14.2 24.3
171.6 111.3 21.4 25.5 0
215.2 171.6 111.3 21.4 25.5

190.62 77.74 0.00 0.00 0.00


23.85 5.90 0.00 0.00 0.00
8.19 5.44 0.00 0.00 0.00
5.91 3.93 0.00 0.00 0.00
3.63 2.89 1.88 0.28 0.49
1.72 1.11 0.21 0.26 0.00
2.15 1.72 1.11 0.21 0.26
236.07 98.72 - - -

0.9 0.4 0.0 0.0 0.0

84.5 84.5 4.00 4.00 4.00


Ganj Ali Bik irrigation canal Cropping Calender
Monthly Calender
Command Area : ### Ha
Culivation Stage
Comma Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Command
Crops nd Area
Area / %
Start Harvest
(ha) 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2

First Crops
Wheat 445 80.00 7 Nov 15 May

Grape 13 2.35 1 Jan 30 Dec

Apple 5 1.00 1 Jan 30 Dec

Peach 7 1.00 1 Jan 30 Dec

Onion 40 7.00 10- Mar 20 Aug

Tomato 29 5.00 10- Mar 15Sep

Okra 14 3.00 10- Mar 20 Aug

Second Crops 553

Rice 364 66.00 15 Jun 15 Sep

Mug bean 50 9.00 1 Jul 15 Sep

Corrot 18 3.00 20 Jun 25 Sep

Turnip 13 2.00 20 Jun 25 Sep

445.00

CWR - Page 9
Country AFGHANISTAN
Stantion Taloqan River
Altitude 847
Latitude 36.76
Longtitude 69.53
Month Min Temp Max Temp Humidity Wind Sun Rad ETo
°C °C % km/day hours MJ/m²/day mm/day
January -7.3 16.8 71 149 4 7.8 1.59
February -9.1 25.1 61 149 5 10.7 2.66
March 2.6 26.9 69 195 6 14.6 3.34
April 5.1 32.2 68 196 7 18.4 4.61
May 15.7 36 42 194 8 21.4 6.29
June 20 39.2 24 238 8 21.9 8.16
July 22.1 40.7 21 223 8 21.6 8.33
August 17.1 36 17 221 8 20.3 7.55
September 3.7 35.1 19 203 7 16.6 6.26
October 3.7 29.6 35 172 6 12.5 4.13
November -9.4 29.7 58 143 4 8.2 3
December -2.1 21.1 78 148 4 7.2 1.62

Average 5.2 30.7 47 186 6.3 15.1 4.8


Station: Taloqan River
Rain Eff rain
mm mm
January 5 5
February 39.5 37
March 72 63.7
April 63 56.6
May 7 6.9
June 0 0
July 0 0
August 0 0
September 0 0
October 4 4
November 50.5 46.4
December 5.5 5.5

Total 246.5 225.1


Crop Water Requirment
Eto station Taloqan
Crop Winter Wheat
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Nov 1 Init 0.7 2.36 9.5 5.4 2.8
Nov 2 Init 0.7 2.1 21 19.4 1.6
Nov 3 Deve 0.7 1.79 17.9 13.6 4.3
Dec 1 Deve 0.74 1.49 14.9 5 9.9
Dec 2 Deve 0.79 1.2 12 0 12
Dec 3 Deve 0.84 1.3 14.2 0.5 13.7
Jan 1 Deve 0.89 1.37 13.7 0.7 12.9
Jan 2 Deve 0.94 1.4 14 0.2 13.8
Jan 3 Deve 0.99 1.86 20.5 4.2 16.3
Feb 1 Deve 1.04 2.4 24 8.9 15.1
Feb 2 Deve 1.09 2.9 29 12.5 16.5
Feb 3 Deve 1.13 3.27 26.2 15.4 10.7
Mar 1 Deve 1.18 3.66 36.6 19.3 17.3
Mar 2 Mid 1.22 4.08 40.8 22.8 18.1
Mar 3 Mid 1.23 4.64 51 21.5 29.5
Apr 1 Mid 1.23 5.16 51.6 21 30.6
Apr 2 Mid 1.23 5.68 56.8 20.9 35.9
Apr 3 Late 1.16 5.99 59.9 14.7 45.2
May 1 Late 0.72 4.1 41 6.5 34.5
May 2 Late 0.35 2.19 10.9 0.2 10.8

565.5 212.7 351.5


Crop Irrigation Schedule
Eto station Taloqan
Crop Winter wheat
Soil Silty loam
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr Flow
mm fract. % % mm mm mm mm l/s/ha
11/11/2019 5 Init 0 1 100 56 38.9 0 0 55.6 1.29
1/1/2019 56 Dev 0 1 100 55 89.4 0 0 127.8 0.29
3/11/2019 125 Dev 0 1 100 55 160 0 0 228.6 0.38
5/15/2019 End End 0 1 0 65
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Winter Wheat f.f. 43 42.3 64.9 111.7 45.3 0 0 0 0 0 8.7 35.6
Net scheme irr.req.
in mm/day 1.1 1.2 1.7 3 1.2 0 0 0 0 0 0.2 0.9
in mm/month 34.4 33.8 52 89.4 36.3 0 0 0 0 0 6.9 28.5
in l/s/h 0.13 0.14 0.19 0.34 0.14 0 0 0 0 0 ### 0.11
Irrigated area 80 80 80 80 80 0 0 0 0 0 80 80
(% of total area)
Irr.req. for actual area 0.16 0.17 0.24 0.43 0.17 0 0 0 0 0 ### 0.13
(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Grape
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Jan 1 Init 0.3 0.46 4.6 0.7 3.9
Jan 2 Init 0.3 0.45 4.5 0.2 4.3
Jan 3 Init 0.3 0.56 6.2 4.2 2
Feb 1 Init 0.3 0.69 6.9 8.9 0
Feb 2 Init 0.3 0.8 8 12.5 0
Feb 3 Init 0.3 0.87 6.9 15.4 0
Mar 1 Init 0.3 0.93 9.3 19.3 0
Mar 2 Deve 0.32 1.06 10.6 22.8 0
Mar 3 Deve 0.36 1.35 14.8 21.5 0
Apr 1 Deve 0.4 1.67 16.7 21 0
Apr 2 Deve 0.44 2.02 20.2 20.9 0
Apr 3 Deve 0.48 2.47 24.7 14.7 10
May 1 Deve 0.52 2.95 29.5 6.5 23
May 2 Deve 0.55 3.49 34.9 0.3 34.6
May 3 Deve 0.6 4.12 45.3 0.2 45.1
Jun 1 Deve 0.64 4.88 48.8 0.1 48.7
Jun 2 Deve 0.68 5.65 56.5 0 56.5
Jun 3 Deve 0.71 5.96 59.6 0 59.6
Jul 1 Deve 0.75 6.28 62.8 0 62.8
Jul 2 Mid 0.78 6.58 65.8 0 65.8
Jul 3 Mid 0.78 6.36 70 0 70
Aug 1 Mid 0.78 6.11 61.1 0 61.1
Aug 2 Mid 0.78 5.91 59.1 0 59.1
Aug 3 Mid 0.78 5.57 61.3 0 61.3
Sep 1 Mid 0.78 5.24 52.4 0 52.4
Sep 2 Mid 0.78 4.9 49 0 49
Sep 3 Mid 0.78 4.34 43.4 0.1 43.3
Oct 1 Mid 0.78 3.73 37.3 0 37.3
Oct 2 Late 0.77 3.09 30.9 0 30.9
Oct 3 Late 0.74 2.72 29.9 4.1 25.8
Nov 1 Late 0.71 2.39 23.9 13.4 10.5
Nov 2 Late 0.68 2.03 20.3 19.4 0.9
Nov 3 Late 0.65 1.64 16.4 13.6 2.9
Dec 1 Late 0.62 1.24 12.4 5 7.4
Dec 2 Late 0.59 0.89 8.9 0 8.9
Dec 3 Late 0.56 0.86 8.6 0.5 8

1121.6 225.4 945


Crop Irrigation Schedule
Eto station Taloqan
Crop Grape
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr Flow
mm fract. % % mm mm mm mm l/s/ha
6/1/2020 152 Dev 0 1 100 46 124 0 0 177.1 0.13
6/24/2020 175 Dev 0 1 100 46 124.1 0 0 177.3 0.89
7/14/2020 195 Mid 0 1 100 46 124.9 0 0 178.5 1.03
8/2/2020 214 Mid 0 1 100 45 121.7 0 0 173.9 1.06
8/23/2020 235 Mid 0 1 100 46 124.7 0 0 178.1 0.98
9/16/2020 259 Mid 0 1 100 47 126.3 0 0 180.5 0.87
10/17/2020 290 End 0 1 100 45 121.8 0 0 174.1 0.65
12/30/2020 End End 0 1 0 25
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Grape 10.2 0 0 10 102.7 164.8 198.6 181.5 144.6 94.1 14.2 24.3
Net scheme irr.req.
in mm/day 0 0 0 0 0.1 0.2 0.2 0.2 0.1 0.1 0 0
in mm/month 0.3 0 0 0.3 3.1 4.9 6 5.4 4.3 2.8 0.4 0.7
in l/s/h 0 0 0 0 0.01 0.02 0.02 0.02 0.02 0.01 0 0
Irrigated area 3 0 0 3 3 3 3 3 3 3 3 3
(% of total area)
Irr.req. for actual area 0.04 0 0 0.04 0.38 0.64 0.74 0.68 0.56 0.35 0.05 0.09
(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Apple
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Jan 1 Init 0.3 0.46 4.6 0.7 3.9
Jan 2 Init 0.3 0.45 4.5 0.2 4.3
Jan 3 Init 0.3 0.56 6.2 4.2 2
Feb 1 Init 0.3 0.69 6.9 8.9 0
Feb 2 Init 0.3 0.8 8 12.5 0
Feb 3 Init 0.3 0.87 6.9 15.4 0
Mar 1 Init 0.3 0.93 9.3 19.3 0
Mar 2 Deve 0.32 1.08 10.8 22.8 0
Mar 3 Deve 0.38 1.42 15.6 21.5 0
Apr 1 Deve 0.43 1.8 18 21 0
Apr 2 Deve 0.48 2.21 22.1 20.9 1.2
Apr 3 Deve 0.53 2.74 27.4 14.7 12.7
May 1 Deve 0.58 3.33 33.3 6.5 26.8
May 2 Deve 0.63 3.97 39.7 0.3 39.4
May 3 Deve 0.68 4.73 52.1 0.2 51.9
Jun 1 Deve 0.74 5.66 56.6 0.1 56.5
Jun 2 Deve 0.79 6.59 65.9 0 65.9
Jun 3 Deve 0.84 7.01 70.1 0 70.1
Jul 1 Deve 0.89 7.42 74.2 0 74.2
Jul 2 Mid 0.93 7.81 78.1 0 78.1
Jul 3 Mid 0.93 7.55 83 0 83
Aug 1 Mid 0.93 7.25 72.5 0 72.5
Aug 2 Mid 0.93 7.01 70.1 0 70.1
Aug 3 Mid 0.93 6.61 72.7 0 72.7
Sep 1 Mid 0.93 6.21 62.1 0 62.1
Sep 2 Mid 0.93 5.81 58.1 0 58.1
Sep 3 Mid 0.93 5.15 51.5 0.1 51.4
Oct 1 Mid 0.93 4.43 44.3 0 44.3
Oct 2 Late 0.91 3.65 36.5 0 36.5
Oct 3 Late 0.85 3.15 34.7 4.1 30.6
Nov 1 Late 0.8 2.72 27.2 13.4 13.8
Nov 2 Late 0.76 2.27 22.7 19.4 3.3
Nov 3 Late 0.71 1.8 18 13.6 4.4
Dec 1 Late 0.66 1.32 13.2 5 8.2
Dec 2 Late 0.61 0.92 9.2 0 9.2
Dec 3 Late 0.56 0.86 8.6 0.5 8.1

1294.6 225.4 1115.1


Crop Irrigation Schedule
Eto station Taloqan
Crop Apple
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr Flow
mm fract. % % mm mm mm mm l/s/ha
1/1/2019 1 Init 0 0.77 77 50 150.4 0 0 214.8 24.86
5/25/2019 145 Dev 0 1 100 37 109.6 0 0 156.6 0.13
6/14/2019 165 Dev 0 1 100 37 111.2 0 0 158.9 0.92
6/30/2019 181 Dev 0 1 100 37 109.7 0 0 156.7 1.13
7/14/2019 195 Mid 0 1 100 35 105.4 0 0 150.6 1.25
7/28/2019 209 Mid 0 1 100 36 107.2 0 0 153.2 1.27
8/12/2019 224 Mid 0 1 100 36 109.1 0 0 155.9 1.2
8/28/2019 240 Mid 0 1 100 36 108.9 0 0 155.6 1.13
9/14/2019 257 Mid 0 1 100 35 105.2 0 0 150.3 1.02
10/5/2019 278 Mid 0 1 100 36 108.4 0 0 154.8 0.85
11/12/2019 316 End 0 1 100 35 106.3 0 0 151.9 0.46
12/30/2019 End End 0 1 0 12
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Precipitation deficit
1. Apple 10.2 0 0 14 118 192.5 235.3 215.2 171.6 111.3
Net scheme irr.req.
in mm/day 0 0 0 0 0 0.1 0.1 0.1 0.1 0
in mm/mon 0.1 0 0 0.1 1.2 1.9 2.4 2.2 1.7 1.1
in l/s/h 0 0 0 0 0 0.01 0.01 0.01 0.01 0
Irrigated a 1 0 0 1 1 1 1 1 1 1
(% of total area)
Irr.req. for 0.04 0 0 0.05 0.44 0.74 0.88 0.8 0.66 0.42
(l/s/h)
Nov Dec

21.4 25.5

0 0
0.2 0.3
0 0
1 1

0.08 0.1
Crop Water Requirment
Eto station Taloqan
Crop Peach
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Jan 1 Init 0.3 0.46 4.6 0.7 3.9
Jan 2 Init 0.3 0.45 4.5 0.2 4.3
Jan 3 Init 0.3 0.56 6.2 4.2 2
Feb 1 Init 0.3 0.69 6.9 8.9 0
Feb 2 Init 0.3 0.8 8 12.5 0
Feb 3 Init 0.3 0.87 6.9 15.4 0
Mar 1 Init 0.3 0.93 9.3 19.3 0
Mar 2 Deve 0.32 1.08 10.8 22.8 0
Mar 3 Deve 0.38 1.42 15.6 21.5 0
Apr 1 Deve 0.43 1.8 18 21 0
Apr 2 Deve 0.48 2.21 22.1 20.9 1.2
Apr 3 Deve 0.53 2.74 27.4 14.7 12.7
May 1 Deve 0.58 3.33 33.3 6.5 26.8
May 2 Deve 0.63 3.97 39.7 0.3 39.4
May 3 Deve 0.68 4.73 52.1 0.2 51.9
Jun 1 Deve 0.74 5.66 56.6 0.1 56.5
Jun 2 Deve 0.79 6.59 65.9 0 65.9
Jun 3 Deve 0.84 7.01 70.1 0 70.1
Jul 1 Deve 0.89 7.42 74.2 0 74.2
Jul 2 Mid 0.93 7.81 78.1 0 78.1
Jul 3 Mid 0.93 7.55 83 0 83
Aug 1 Mid 0.93 7.25 72.5 0 72.5
Aug 2 Mid 0.93 7.01 70.1 0 70.1
Aug 3 Mid 0.93 6.61 72.7 0 72.7
Sep 1 Mid 0.93 6.21 62.1 0 62.1
Sep 2 Mid 0.93 5.81 58.1 0 58.1
Sep 3 Mid 0.93 5.15 51.5 0.1 51.4
Oct 1 Mid 0.93 4.43 44.3 0 44.3
Oct 2 Late 0.91 3.65 36.5 0 36.5
Oct 3 Late 0.85 3.15 34.7 4.1 30.6
Nov 1 Late 0.8 2.72 27.2 13.4 13.8
Nov 2 Late 0.76 2.27 22.7 19.4 3.3
Nov 3 Late 0.71 1.8 18 13.6 4.4
Dec 1 Late 0.66 1.32 13.2 5 8.2
Dec 2 Late 0.61 0.92 9.2 0 9.2
Dec 3 Late 0.56 0.86 8.6 0.5 8.1

1294.6 225.4 1115.1


Crop Irrigation Schedule
Eto station Taloqan
Crop peach
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr
mm fract. % % mm mm mm mm
1/1/2019 1 Init 0 0.77 77 50 150.4 0 0 214.8
5/25/2019 145 Dev 0 1 100 37 109.6 0 0 156.6
6/14/2019 165 Dev 0 1 100 37 111.2 0 0 158.9
6/30/2019 181 Dev 0 1 100 37 109.7 0 0 156.7
7/14/2019 195 Mid 0 1 100 35 105.4 0 0 150.6
7/28/2019 209 Mid 0 1 100 36 107.2 0 0 153.2
8/12/2019 224 Mid 0 1 100 36 109.1 0 0 155.9
8/28/2019 240 Mid 0 1 100 36 108.9 0 0 155.6
9/14/2019 257 Mid 0 1 100 35 105.2 0 0 150.3
10/5/2019 278 Mid 0 1 100 36 108.4 0 0 154.8
11/12/2019 316 End 0 1 100 35 106.3 0 0 151.9
12/30/2019 End End 0 1 0 12
Flow
l/s/ha
24.86
0.13
0.92
1.13
1.25
1.27
1.2
1.13
1.02
0.85
0.46
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Peach 10.2 0 0 14 118 192.5 235.3 215.2 171.6 111.3 21.4 25.5
Net scheme irr.req.
in mm/day 0 0 0 0 0 0.1 0.1 0.1 0.1 0 0 0
in mm/mon 0.1 0 0 0.1 1.2 1.9 2.4 2.2 1.7 1.1 0.2 0.3
in l/s/h 0 0 0 0 0 0.01 0.01 0.01 0.01 0 0 0
Irrigated a 1 0 0 1 1 1 1 1 1 1 1 1
(% of total area)
Irr.req. for 0.04 0 0 0.05 0.44 0.74 0.88 0.8 0.66 0.42 0.08 0.1
(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Onion
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Mar 1 Init 0.7 2.18 2.2 1.9 2.2
Mar 2 Init 0.7 2.34 23.4 22.8 0.6
Mar 3 Init 0.7 2.64 29 21.5 7.5
Apr 1 Deve 0.72 3 30 21 9
Apr 2 Deve 0.78 3.58 35.8 20.9 14.9
Apr 3 Deve 0.84 4.32 43.2 14.7 28.5
May 1 Deve 0.9 5.13 51.3 6.5 44.8
May 2 Deve 0.96 6.01 60.1 0.3 59.8
May 3 Deve 1.02 7.05 77.5 0.2 77.3
Jun 1 Mid 1.08 8.26 82.6 0.1 82.5
Jun 2 Mid 1.09 9.08 90.8 0 90.8
Jun 3 Mid 1.09 9.07 90.7 0 90.7
Jul 1 Mid 1.09 9.06 90.6 0 90.6
Jul 2 Mid 1.09 9.15 91.5 0 91.5
Jul 3 Late 1.07 8.7 95.7 0 95.7
Aug 1 Late 1.03 8.07 80.7 0 80.7
Aug 2 Late 1 7.55 75.5 0 75.5

1050.5 109.9 942.6


Crop Irrigation Schedule
Eto station Taloqan
Crop Onion
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net IrDeficit Loss Gr. Ir Flow
mm fract. % % mm mm mm mm l/s/ha
43534 1 Init 0 0.71 71 53 27 0 0 38.5 4.46
43556 23 Init 0 1 100 32 21.5 0 0 30.8 0.16
43576 43 Dev 0 1 100 38 32 0 0 45.7 0.26
43587 54 Dev 0 1 100 40 37.3 0 0 53.4 0.56
43596 63 Dev 0 1 100 44 43.5 0 0 62.2 0.8
43604 71 Dev 0 1 100 45 48 0 0 68.6 0.99
43611 78 Dev 0 1 100 43 48.3 0 0 69 1.14
43618 85 Dev 0 1 100 44 51.7 0 0 73.9 1.22
43625 92 Mid 0 1 100 48 57.8 0 0 82.5 1.36
43632 99 Mid 0 1 100 52 62.7 0 0 89.6 1.48
43638 105 Mid 0 1 100 45 54.5 0 0 77.8 1.5
43644 111 Mid 0 1 100 45 54.4 0 0 77.7 1.5
43650 117 Mid 0 1 100 45 54.4 0 0 77.7 1.5
43656 123 Mid 0 1 100 45 54.3 0 0 77.6 1.5
43662 129 Mid 0 1 100 46 54.9 0 0 78.4 1.51
43669 136 End 0 1 100 52 62.7 0 0 89.6 1.48
43676 143 End 0 1 100 51 60.9 0 0 87 1.44
43684 151 End 0 1 100 54 65.2 0 0 93.2 1.35
43692 159 End 0 1 100 52 62 0 0 88.5 1.28
43697 End End 0 1 100 25
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Onion 0 0 10.3 52.4 181.9 264 277.8 156.2 0 0 0 0
Net scheme irr.req.
in mm/day 0 0 0 0.1 0.4 0.6 0.6 0.4 0 0 0 0
in mm/month 0 0 0.7 3.7 12.7 18.5 19.4 10.9 0 0 0 0
in l/s/h 0 0 0 0.01 0.05 0.07 0.07 0.04 0 0 0 0
Irrigated area 0 0 7 7 7 7 7 7 0 0 0 0
(% of total area)
Irr.req. for actual area 0 0 0.04 0.2 0.68 1.02 1.04 0.58 0 0 0 0
(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Tomato
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Mar 1 Init 1 3.12 3.1 1.9 3.1
Mar 2 Init 1 3.34 33.4 22.8 10.6
Mar 3 Init 1 3.77 41.4 21.5 19.9
Apr 1 Deve 1.01 4.22 42.2 21 21.2
Apr 2 Deve 1.03 4.75 47.5 20.9 26.6
Apr 3 Deve 1.05 5.45 54.5 14.7 39.8
May 1 Deve 1.08 6.17 61.7 6.5 55.2
May 2 Deve 1.1 6.93 69.3 0.3 69
May 3 Deve 1.13 7.79 85.7 0.2 85.5
Jun 1 Deve 1.15 8.84 88.4 0.1 88.3
Jun 2 Deve 1.18 9.84 98.4 0 98.4
Jun 3 Mid 1.19 9.96 99.6 0 99.6
Jul 1 Mid 1.19 9.94 99.4 0 99.4
Jul 2 Mid 1.19 10.05 100.5 0 100.5
Jul 3 Mid 1.19 9.7 106.7 0 106.7
Aug 1 Mid 1.19 9.31 93.1 0 93.1
Aug 2 Mid 1.19 9 90 0 90
Aug 3 Late 1 7.15 78.7 0 78.7
Sep 1 Late 0.61 4.07 40.7 0 40.7
Sep 2 Late 0.33 2.04 10.2 0 10.2

1344.5 109.9 1236.6


Crop Irrigation Schedule
Eto station Taloqan
Crop Tomato
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr Flow
mm fract. % % mm mm mm mm l/s/ha
3/10/2019 1 Init 0 0.71 71 54 27.9 0 0 39.9 4.62
3/21/2019 12 Init 0 1 100 35 23.6 0 0 33.7 0.35
3/31/2019 22 Init 0 1 100 33 27 0 0 38.6 0.45
4/11/2019 33 Dev 0 1 100 33 31.8 0 0 45.4 0.48
4/21/2019 43 Dev 0 1 100 32 36.1 0 0 51.6 0.6
5/1/2019 53 Dev 0 1 100 36 45.6 0 0 65.1 0.75
5/10/2019 62 Dev 0 1 100 38 52.5 0 0 75 0.96
5/18/2019 70 Dev 0 1 100 39 58.9 0 0 84.1 1.22
5/26/2019 78 Dev 0 1 100 40 64.1 0 0 91.5 1.32
6/3/2019 86 Dev 0.1 1 100 40 68.9 0 0 98.4 1.42
6/11/2019 94 Dev 0 1 100 41 75.1 0 0 107.3 1.55
6/19/2019 102 Dev 0 1 100 42 82.2 0 0 117.4 1.7
6/27/2019 110 Mid 0 1 100 40 80.4 0 0 114.9 1.66
7/6/2019 119 Mid 0 1 100 45 89.5 0 0 127.9 1.64
7/15/2019 128 Mid 0 1 100 45 90 0 0 128.6 1.65
7/24/2019 137 Mid 0 1 100 45 89 0 0 127.2 1.64
8/2/2019 146 Mid 0 1 100 43 86.5 0 0 123.6 1.59
8/11/2019 155 Mid 0 1 100 42 83.5 0 0 119.3 1.53
8/20/2019 164 Mid 0 1 100 41 81 0 0 115.8 1.49
9/3/2019 178 End 0 1 100 45 90.9 0 0 129.8 1.07
9/15/2019 End End 0 1 100 18
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Tomato 0 0 33.7 87.6 209.7 286.2 306.6 261.8 50.9 0 0 0
Net scheme irr.req.
in mm/day 0 0 0.1 0.1 0.3 0.5 0.5 0.4 0.1 0 0 0
in mm/month 0 0 1.7 4.4 10.5 14.3 15.3 13.1 2.5 0 0 0
in l/s/h 0 0 0.01 0.02 0.04 0.06 0.06 0.05 0.01 0 0 0
Irrigated area 0 0 5 5 5 5 5 5 5 0 0 0
(% of total area)
Irr.req. for actual area 0 0 0.13 0.34 0.78 1.1 1.14 0.98 0.2 0 0 0
(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Okra
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Mar 1 Init 0.7 2.18 2.2 1.9 2.2
Mar 2 Init 0.7 2.34 23.4 22.8 0.6
Mar 3 Init 0.7 2.64 29 21.5 7.5
Apr 1 Deve 0.7 2.95 29.5 21 8.5
Apr 2 Deve 0.77 3.53 35.3 20.9 14.4
Apr 3 Deve 0.84 4.36 43.6 14.7 28.9
May 1 Deve 0.92 5.27 52.7 6.5 46.2
May 2 Deve 1 6.27 62.7 0.3 62.4
May 3 Mid 1.07 7.4 81.4 0.2 81.2
Jun 1 Mid 1.09 8.33 83.3 0.1 83.2
Jun 2 Mid 1.09 9.08 90.8 0 90.8
Jun 3 Mid 1.09 9.07 90.7 0 90.7
Jul 1 Mid 1.09 9.06 90.6 0 90.6
Jul 2 Mid 1.09 9.15 91.5 0 91.5
Jul 3 Late 1.08 8.79 96.7 0 96.7
Aug 1 Late 1.04 8.15 81.5 0 81.5
Aug 2 Late 1 7.58 75.8 0 75.8

1060.5 109.9 952.6


Crop Irrigation Schedule
Eto station Taloqan
Crop Okra
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr
mm fract. % % mm mm mm mm
3/10/2019 1 Init 0 0.71 71 53 27 0 0 38.6
4/1/2019 23 Init 0 1 100 31 22.1 0 0 31.6
4/21/2019 43 Dev 0 1 100 36 31.4 0 0 44.9
5/2/2019 54 Dev 0 1 100 39 37.8 0 0 54
5/11/2019 63 Dev 0 1 100 42 44.9 0 0 64.1
5/19/2019 71 Dev 0 1 100 44 50.1 0 0 71.6
5/27/2019 79 Dev 0 1 100 48 58.1 0 0 82.9
6/3/2019 86 Mid 0.1 1 100 45 54.5 0 0 77.9
6/10/2019 93 Mid 0 1 100 49 58.2 0 0 83.2
6/16/2019 99 Mid 0 1 100 45 54.5 0 0 77.8
6/22/2019 105 Mid 0 1 100 45 54.5 0 0 77.8
6/28/2019 111 Mid 0 1 100 45 54.4 0 0 77.7
7/4/2019 117 Mid 0 1 100 45 54.4 0 0 77.7
7/10/2019 123 Mid 0 1 100 45 54.3 0 0 77.6
7/16/2019 129 Mid 0 1 100 46 54.9 0 0 78.4
7/22/2019 135 Mid 0 1 100 45 54.2 0 0 77.4
7/29/2019 142 End 0 1 100 51 61.5 0 0 87.9
8/5/2019 149 End 0 1 100 49 58.3 0 0 83.3
8/13/2019 157 End 0 1 100 53 63.5 0 0 90.7
8/20/2019 End End 0 1 100 38
Flow
l/s/ha
4.47
0.17
0.26
0.57
0.82
1.04
1.2
1.29
1.38
1.5
1.5
1.5
1.5
1.5
1.51
1.49
1.45
1.38
1.31
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Precipitation deficit
1. Okra 0 0 10.3 51.8 189.8 264.7 278.8 157.3 0 0
Net scheme irr.req.
in mm/day 0 0 0 0.1 0.2 0.3 0.3 0.2 0 0
in mm/mon 0 0 0.3 1.6 5.7 7.9 8.4 4.7 0 0
in l/s/h 0 0 0 0.01 0.02 0.03 0.03 0.02 0 0
Irrigated a 0 0 3 3 3 3 3 3 0 0
(% of total area)
Irr.req. for 0 0 0.04 0.2 0.71 1.02 1.04 0.59 0 0
(l/s/h)
Nov Dec

0 0

0 0
0 0
0 0
0 0

0 0
Crop Water Requirment
Eto station Taloqan
Crop Rice
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
May 3 Nurs/LPr 1.13 4.39 48.3 0.2 140
Jun 1 Nurs/LPr 1.06 8.17 81.7 0.1 309.1
Jun 2 Init 1.09 9.08 90.8 0 149.8
Jun 3 Init 1.1 9.19 91.9 0 91.9
Jul 1 Deve 1.1 9.18 91.8 0 91.8
Jul 2 Deve 1.13 9.55 95.5 0 95.5
Jul 3 Deve 1.19 9.66 106.2 0 106.2
Aug 1 Mid 1.24 9.68 96.8 0 96.8
Aug 2 Mid 1.25 9.46 94.6 0 94.6
Aug 3 Mid 1.25 8.93 98.2 0 98.2
Sep 1 Late 1.22 8.16 81.6 0 81.6
Sep 2 Late 1.16 7.29 36.5 0 36.5

1013.9 0.3 1392


Crop Irrigation Schedule
Eto station Taloqan
Crop Rice
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Puddl Percol. Depl.SM Net Gift Loss
mm fract. % state mm mm mm mm
5/26/2020 -19 PrePu 0 0.9 90 Prep 0 42 92.3 0
6/5/2020 -9 Puddl 0 1 100 Prep 0 17 90 0
6/7/2020 -7 Puddl 0.1 1 100 OK 19.1 0 76.4 0
6/10/2020 -4 Puddl 0 1 100 OK 9.7 0 61.1 0
6/14/2020 0 Puddl 0 1 100 OK 3.9 0 58.7 0
6/18/2020 4 Init 0 1 100 OK 3.1 0 98.6 0
6/26/2020 12 Init 0 1 100 OK 3.1 0 98 0
7/4/2020 20 Init 0 1 100 OK 3.1 0 98.3 0
7/12/2020 28 Dev 0 1 100 OK 3.1 0 99 0
7/20/2020 36 Dev 0 1 100 OK 3.1 0 101.3 0
7/28/2020 44 Dev 0 1 100 OK 3.1 0 102.1 0
8/5/2020 52 Dev 0 1 100 OK 3.1 0 102.2 0
8/13/2020 60 Mid 0 1 100 OK 3.1 0 101.6 0
8/21/2020 68 Mid 0 1 100 OK 3.1 0 100 0
8/29/2020 76 Mid 0 1 100 OK 3.1 0 96.3 0
9/7/2020 85 End 0 1 100 OK 3.1 0 103 0
9/15/2020 End End 8.1 1 100 OK 7.4 0
Depl.SAT
mm
40
40
26.4
11.1
8.7
-1.4
-2
-1.7
-1
1.3
2.1
2.2
1.6
0
-3.7
3
Scheme Supply
Jan Feb Mar Apr May Jun Jul
Precipitation deficit
1. Rice 0 0 0 0 140 550.8 293.5

Net scheme irr.req.


in mm/day 0 0 0 0 3 12.1 6.2
in mm/month 0 0 0 0 92.4 363.5 193.7
in l/s/h 0 0 0 0 0.34 1.4 0.72

Irrigated area 0 0 0 0 66 66 66
(% of total area)

Irr.req. for actual area 0 0 0 0 0.52 2.12 1.1


(l/s/h)
upply
Aug Sep Oct Nov Dec

289.6 118.1 0 0 0

6.2 2.6 0 0 0
191.1 77.9 0 0 0
0.71 0.3 0 0 0

66 66 0 0 0

1.08 0.46 0 0 0
Crop Water Requirment
Eto station Taloqan
Crop Mug Bean
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Jul 1 Init 0.4 3.34 33.4 0 33.4
Jul 2 Deve 0.45 3.77 37.7 0 37.7
Jul 3 Deve 0.75 6.08 66.9 0 66.9
Aug 1 Mid 1.08 8.4 84 0 84
Aug 2 Mid 1.19 8.98 89.8 0 89.8
Aug 3 Late 1.15 8.18 90 0 90
Sep 1 Late 0.77 5.15 51.5 0 51.5
Sep 2 Late 0.44 2.75 13.7 0 13.7

466.9 0 466.9
Crop Irrigation Schedule
Eto station Taloqan
Crop Mug Bean
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr Flow
mm fract. % % mm mm mm mm l/s/ha
7/12/2020 12 Init 0 1 100 47 40.9 0 0 58.4 0.56
7/24/2020 24 Dev 0 1 100 46 54.5 0 0 77.8 0.75
8/3/2020 34 Dev 0 1 100 46 67.7 0 0 96.8 1.12
8/12/2020 43 Mid 0 1 100 47 76.7 0 0 109.6 1.41
8/21/2020 52 Mid 0 1 100 49 80 0 0 114.3 1.47
8/31/2020 62 End 0 1 100 51 81.8 0 0 116.9 1.35
9/15/2020 End End 0 1 100 39
9/15/2019 End End 0 1 100 48
Scheme Suppley
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Mug Bean 0 0 0 0 0 0 137.9 263.8 65.2 0 0 0

Net scheme irr.req.


in mm/day 0 0 0 0 0 0 0.4 0.8 0.2 0 0 0
in mm/month 0 0 0 0 0 0 12.4 23.7 5.9 0 0 0
in l/s/h 0 0 0 0 0 0 0.05 0.09 0.02 0 0 0

Irrigated area 0 0 0 0 0 0 9 9 9 0 0 0
(% of total area)

Irr.req. for actual area 0 0 0 0 0 0 0.51 0.98 0.25 0 0 0


(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Carrot
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Jun 2 Init 0.7 5.85 5.9 0 5.9
Jun 3 Init 0.7 5.85 58.5 0 58.5
Jul 1 Deve 0.7 5.85 58.5 0 58.5
Jul 2 Deve 0.79 6.67 66.7 0 66.7
Jul 3 Deve 0.94 7.63 83.9 0 83.9
Aug 1 Mid 1.07 8.36 83.6 0 83.6
Aug 2 Mid 1.09 8.24 82.4 0 82.4
Aug 3 Mid 1.09 7.77 85.5 0 85.5
Sep 1 Late 1.09 7.27 72.7 0 72.7
Sep 2 Late 1.05 6.6 66 0 66
Sep 3 Late 1.03 5.7 28.5 0.1 28.4

692 0.1 692


Crop Irrigation Schedule
Eto station Taloqan
Crop Carrot
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr
mm fract. % % mm mm mm mm
6/22/2020 3 Init 0 1 100 36 17.5 0 0 25.1
6/25/2020 6 Init 0 1 100 33 17.5 0 0 25.1
6/28/2020 9 Init 0 1 100 31 17.5 0 0 25.1
7/2/2020 13 Init 0 1 100 38 23.4 0 0 33.4
7/6/2020 17 Init 0 1 100 35 23.4 0 0 33.4
7/10/2020 21 Dev 0 1 100 32 23.4 0 0 33.4
7/14/2020 25 Dev 0 1 100 34 26.7 0 0 38.1
7/19/2020 30 Dev 0 1 100 39 33.3 0 0 47.6
7/24/2020 35 Dev 0 1 100 41 37.2 0 0 53.1
7/30/2020 41 Dev 0 1 100 46 45.8 0 0 65.4
8/5/2020 47 Dev 0 1 100 46 49.4 0 0 70.6
8/11/2020 53 Mid 0 1 100 46 50 0 0 71.5
8/17/2020 59 Mid 0 1 100 46 49.4 0 0 70.6
8/24/2020 66 Mid 0 1 100 52 55.8 0 0 79.7
8/31/2020 73 Mid 0 1 100 50 54.4 0 0 77.7
9/7/2020 80 End 0 1 100 47 50.9 0 0 72.7
9/15/2020 88 End 0 1 100 51 54.8 0 0 78.3
9/24/2020 97 End 0 1 100 52 55.7 0 0 79.6
9/25/2020 End End 0 1 0 0
Flow
l/s/ha
0.97
0.97
0.97
0.97
0.97
0.97
1.1
1.1
1.23
1.26
1.36
1.38
1.36
1.32
1.29
1.2
1.13
1.02
Scheme Suppley
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Carrot 0 0 0 0 0 64.3 209.1 251.5 167.1 0 0 0

Net scheme irr.req.


in mm/day 0 0 0 0 0 0.1 0.2 0.2 0.2 0 0 0
in mm/month 0 0 0 0 0 1.9 6.3 7.5 5 0 0 0
in l/s/h 0 0 0 0 0 0.01 0.02 0.03 0.02 0 0 0

Irrigated area 0 0 0 0 0 3 3 3 3 0 0 0
(% of total area)

Irr.req. for actual area 0 0 0 0 0 0.25 0.78 0.94 0.64 0 0 0


(l/s/h)
Crop Water Requirment
Eto station Taloqan
Crop Turnip
Month Decade Stage Kc ETc ETc Eff rain Irr. Req.
coeff mm/day mm/dec mm/dec mm/dec
Jun 2 Init 0.7 5.85 5.9 0 5.9
Jun 3 Init 0.7 5.85 58.5 0 58.5
Jul 1 Deve 0.7 5.85 58.5 0 58.5
Jul 2 Deve 0.79 6.67 66.7 0 66.7
Jul 3 Deve 0.94 7.63 83.9 0 83.9
Aug 1 Mid 1.07 8.36 83.6 0 83.6
Aug 2 Mid 1.09 8.24 82.4 0 82.4
Aug 3 Mid 1.09 7.77 85.5 0 85.5
Sep 1 Late 1.09 7.27 72.7 0 72.7
Sep 2 Late 1.05 6.6 66 0 66
Sep 3 Late 1.03 5.7 28.5 0.1 28.4

692 0.1 692


Crop Irrigation Schedule
Eto station Taloqan
Crop Turnip
Soil SILTY LOAM
Date Day Stage Rain Ks Eta Depl Net Irr Deficit Loss Gr. Irr
mm fract. % % mm mm mm mm
6/20/2019 1 Init 0 0.71 71 58 29.9 0 0 42.7
6/23/2019 4 Init 0 1 100 35 19.8 0 0 28.2
6/26/2019 7 Init 0 1 100 33 19.8 0 0 28.2
6/29/2019 10 Init 0 1 100 31 19.8 0 0 28.2
7/3/2019 14 Init 0 1 100 37 26.4 0 0 37.7
7/7/2019 18 Init 0 1 100 35 26.4 0 0 37.7
7/11/2019 22 Dev 0 1 100 33 27.2 0 0 38.8
7/15/2019 26 Dev 0 1 100 34 29.6 0 0 42.3
7/20/2019 31 Dev 0 1 100 39 37.1 0 0 52.9
7/25/2019 36 Dev 0 1 100 41 41.9 0 0 59.8
7/31/2019 42 Dev 0 1 100 45 50.2 0 0 71.8
8/7/2019 49 Mid 0 1 100 52 62.2 0 0 88.9
8/14/2019 56 Mid 0 1 100 48 58 0 0 82.9
8/21/2019 63 Mid 0 1 100 48 57.2 0 0 81.7
8/28/2019 70 Mid 0 1 100 45 54.4 0 0 77.7
9/5/2019 78 Mid 0 1 100 50 59.7 0 0 85.2
9/14/2019 87 End 0 1 100 52 62.7 0 0 89.6
9/24/2019 97 End 0 1 100 52 62.3 0 0 89
9/25/2019 End End 0 1 0 0
Flow
l/s/ha
4.95
1.09
1.09
1.09
1.09
1.09
1.12
1.23
1.23
1.38
1.38
1.47
1.37
1.35
1.29
1.23
1.15
1.03
Scheme Supply
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Precipitation deficit
1. Turnip 0 0 0 0 0 64.3 209.1 251.5 167.1 0 0 0
Net scheme irr.req.
in mm/day 0 0 0 0 0 0 0.1 0.2 0.1 0 0 0
in mm/mon 0 0 0 0 0 1.3 4.2 5 3.3 0 0 0
in l/s/h 0 0 0 0 0 0 0.02 0.02 0.01 0 0 0
Irrigated a 0 0 0 0 0 2 2 2 2 0 0 0
(% of total area)
Irr.req. for 0 0 0 0 0 0.25 0.78 0.94 0.64 0 0 0
(l/s/h)