SHS-CAL-MOF-ST-SS-00-012-02 SS Double Angle For Trench Cover - CUC PDF
SHS-CAL-MOF-ST-SS-00-012-02 SS Double Angle For Trench Cover - CUC PDF
We certifiy that the above submitted items have been reviewed in details and are correct and in strict conformity with the Contract except as
otherwise stated hereon.
Prepared By (Doc. Originator): Reviewed By (QA Manager): Approved By (Project Manager):
Compliance with CM Comments
Submittal Title: Design Calculations for Double SS Angle for Trench Cover Rev. 02 Facility Code:
Review Comments:
Submit the structural desigh for grating system in terms of members and
1 Noted, altered in the design analysis model
connections.
Done
2 Clarify the supporting condition for the system (3mm pl.) and the channel. the Stainless steel angle fixed to concrete by SPIT anchor bolts
the C-Channels are welded to thebottom of the SS Double angle
The Loads on the Stainless steel Double angle are:
■Self weight
3 Submit the reason for not adopt the load due to marble weight. ■Stainless steel Grating
■Live load of 5 KN/m2
(there is no marble above this system)
Clarify the reference of the applide live load . Which the concentrated live
load (100kg) applied on the channel is not reasonable and why live load
4 ■Live load of 5 KN/m2, applied to the model as per the project specifications
1(500kg/m2) is not adopted in channel design, comply with project
specifications.
MASCO scope of work is:
It is noticed that marble and stainless steel trench cover are (by
5 Fixation of Stainless steel double angle and channels, ie, the Top SS grating
other),clarify.
(Cover) will be supplied and installed (by others)
6 Clarify the grade for the steel channel section . Stainless Steel 316L
OK
8 Submit soft copy of the used analysis model .
9 Clarify the area of application on the drawing and identify by grid lines. The Drawing that clairifies the area of application is attached
Done
10 Submit the warranty as per project specification . Refere to PDF Last page
DESIGN CALCULATIONS
Subject
1- Design Calculations Contents
2- Material Specifications
3- Design Criteria
4- Design of SS Double angle with C-Channels:
a) Model Description
b) SAP Input Data
c) SAP Output Data
d) Members Design
e) Design Connection
f) SPIT anchor bolts for fixation of double angles
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
2- Material Specifications
The following is the list of the material standards and specifications for which the building components
have been designed:-
Material Specifications
No. Components Specifications Strength
1
All Tubes & Plates Stainless Steel Grade 316 Fy = 20.5 KN/cm2
2 Stainless Steel Members Weld AWS D1.6, Electrode grade 316 Fu = 52.5 KN/cm2
3- Design Criteria:
Applicable Codes:
■ Members Design According to AISC ASD-89
A. General:
B. Stainless Steel Ladders: Comply with the following unless otherwise indicated on Shop
Drawings submitted by Contractor and approved by Engineer:
C. Stainless Steel Catwalk: Form catwalk to configurations shown from abrasive-surface floor
plate of thickness needed to comply with performance requirements, but not less than 6.4
mm.
A. General:
1. Fabricate ladder safety cages to comply with ANSI A14.3. Assemble by welding or
with stainless-steel fasteners.
2. Provide primary hoops at tops and bottoms of cages and spaced not more than 6 m
o.c. Provide secondary intermediate hoops spaced not more than 1200 mm o.c.
between primary hoops.
3. Fasten assembled safety cage to ladder rails and adjacent construction by welding or
with stainless-steel fasteners unless otherwise indicated.
SS 316 Channel 20x15x3mm
SPIT ACNHOR BOLT 10X100X50
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
Area Of Application
FHC-2
REF
ER T
O PI
AZZ
A PR
OJE
CT
RE
FER
TO
TRENCH COVER AT ABLUTION AREAS ALL FLOORS PIA
ZZA
PR
O
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
0.25
0.96
0.96
0.96
0.25
0.96
0.96
1.93
0.96
0.96
LL = 5 KN/m2 on the Grating
0.25
Transfer to the support system
0.25
0.96
0.96
1.93
0.96
0.96
0.25
0.25
0.96
0.96
1.93
0.96
0.96
0.25
0.96
0.96
0.96
0.25
-10.5 -9.8 -9.0 -8.3 -7.5 -6.8 -6.0 -5.3 -4.5 -3.8 -3.0 -2.3 -1.5 -0.7 E-3
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
m
x3m
20x15
C
SS
mm
x15x3
0
C2
SS
SS
m Do
x3m ub
le A
x15 ng
2 0 le
C 40
SS x45
SS x25
Do x13
u ble
m m x3mm
An x3
g le 15
4 0x 0 x
45
x2 C2
S
5 x1 S
3x
3m
m
m
m
x3
15
0x
C2
SS
-10.5 -9.8 0.00 -9.0 -8.3 0.50
-7.5 -6.8 -6.0 0.70 -5.3 -4.5 0.90
-3.8 -3.0 -2.3 1.00 -1.5 -0.7 E-3
SAP2000 20.2.0 Steel Design Sections (AISC-ASD89) KN, m, C
SS Double angle for fixation of SS Trench Cover-Service Building.sdb
1 7
0.2
25
0.4
5
0.4 0. 0
67
5
0. 0 42
66 0.
8
21
0.
-10.5 -9.8 0.00 -9.0 -8.3 0.50
-7.5 -6.8 -6.0 0.70 -5.3 -4.5 0.90
-3.8 -3.0 -2.3 1.00 -1.5 -0.7 E-3
SAP2000 20.2.0 Steel P-M Interaction Ratios (AISC-ASD89) KN, m, C
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
Ratio
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
From Sap Model Max Deflection on Channel due to Grating +L.L = 0.004 cm < L/240 = 30/240 = 0.125cm
OK
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
Connections Design
Double angle with the C-Channel
Straining actions:
- Use size of weld = 3 mm
- Use Electrode E308/308H-16
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
ELEMENTS FORCES:
MAX P
MAX V2 &V3
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
Limcon Output:
Page 1 of 2
06/11/2019
11:30:23 AM
wghaba
Job: LimconJob -- Connection: DoubleAngleConn
Welding Length
15+20+15 mm
20
15 15
50
Check on Bolts:
Designed By Date: Revision
WG Nov 26, 2019 02
Project : Service Building – Shamiyah
SS Double Angle for Trench Cover Design
Reactions:
B-LONG
zinc coated & stainless steel version
Technical data
h0
Tinst Anchor size Concrete Structural clay Hollow clay brick/ Setting data and Anchor size Code
d0 block Aerated concrete
Embed. Max. Embed. Max. Embed. Max. Base Drilling Drilling Total Tighten Head Head Head Head
tfix hnom depth thickness depth thickness depth thickness material depth diameter anchor torque version version version version
to fix to fix to fix thickness length F HS F - A4 HS - A4
L (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
hnom tfix hnom tfix hnom tfix hmin hO dO L Tinst
hmin
8X60/10 10 10 10 60 567950 - - -
8X80/30 30 30 30 80 567951 - 567942 -
APPLICATION 8X100/50 50 50 50 50 50 50 100 60 8 100 12 567952 - 567943 -
8X120/70 70 70 70 120 567953 - - -
Roofing clamps
8X150/100 100 100 100 150 567954 - - -
Sanitary equipement
10X60/10 20 10 - 60 - 567969 - 567986
Fixing wall plates
Timbers 10X80/30 40 30 10 80 567957 567970 567981 567987
Insulation 10X100/50 60 50 30 100 567958 567971 567982 567988
Facade bracketing 10X120/70 80 70 50 120 567959 567972 - -
10X140/90 100 90 70 140 567960 567973 - -
10X160/110 120 110 90 hnom hnom 160 567961 567974 - -
40 50 70 10 16*
10X180/130 140 130 110 X2 +10 mm 180 567962 567975 - -
MATERIAL
10X200/150 160 150 130 200 567963 567976 - -
Body: polyamid 6 10X230/180 190 180 160 230 567964 567977 - -
Screw: 10X260/210 220 210 190 260 567965 567978 - -
Zinc coated steel: grade 6.8 (5 µm) 10X280/230 240 230 210 280 567966 567979 - -
Stainless steel: A4-80 10X300/250 260 250 230 300 567967 567980 - -
Head type: * In aereted concrete apply torque at 50% of nominal value
F: countersunk head
TORX 30 (Ø8) Products on special orders
TORX 40 (Ø10)
HS : hexagonal head
+ integrated washer
INSTALLATION
174
B-LONG
zinc coated & stainless steel version
Spacing data
Minimum distance between anchors and from edges (mm) The anchor must be installed at the minimum distance of:
hnom Scr,N Ccr,N Smin Cmin - 100 mm from one edge.
Ø8 50 60 50 50 50 - 200 mm from another anchor with spacing parallel to the edge.
Ø10 40 65 80 60 50 - 400 mm from another anchor with spacing perpendicular to the edge.
Ø10 50 90 100 70 60
175
THE CONSULTANT: THE CONTRACTOR:
MATERIAL WARRANTY
Metal Artwork Saudi co. Metal Artwork Saudi co. SAUDI BINLADIN GROUP
1 Stainless Steel Double Angle and Channels for Trench Cover
(MASCO) (MASCO) (SBG)
Warranty Details:
Provide complete warranty in which Manufacturer, Contractor and Installer are jointly and severally responsible and agree to repair or replace without limitations, all or any part of defective Stainless
Steel Double Angle and Channels for Trench Cover that do not fulfill quality and performance requirements or do not comply with tolerances in referenced quality standard such as, but not limited to
Deterioration of metals, metal finishes, and other impurities Two years from date of Substantial
3 Confirm Confirm
beyond normal weathering Handover of the Product
Customers Responsibilities:
1) Do Periodic maintenance
2) Maintain the proper humidity for indoor Items.
3) Product which requires minor repairs, self-repair is mandatory.
4) Inform the company on time for major problem, if product is under warranty.