The document compares quoted rates for balance work on a 2-lane road project against revised rates. It lists 28 items with their unit of measurement, revised rates, and quoted rates for two sections of the road project. For most items, the quoted rates are higher than the revised rates, with increases ranging from 10% to 100% or more for items like clearing and grubbing, embankment with borrow pits, and concrete work.
The document compares quoted rates for balance work on a 2-lane road project against revised rates. It lists 28 items with their unit of measurement, revised rates, and quoted rates for two sections of the road project. For most items, the quoted rates are higher than the revised rates, with increases ranging from 10% to 100% or more for items like clearing and grubbing, embankment with borrow pits, and concrete work.
The document compares quoted rates for balance work on a 2-lane road project against revised rates. It lists 28 items with their unit of measurement, revised rates, and quoted rates for two sections of the road project. For most items, the quoted rates are higher than the revised rates, with increases ranging from 10% to 100% or more for items like clearing and grubbing, embankment with borrow pits, and concrete work.
2-Lane road from Km. Balance work of 2 Balance work of 2 287.00 - 292.00, Km. lane Road in lane Road in Km 322.00 - 342.00 & Km. Km 44/6 to km 50.0 - S No Description of Item / Name of Work Unit 50.0 to km 70.0 - 352.00 - 400.00 of LWE LWE (81.61 Cr) NH-63 (13.21 Cr)
Revised Rate Quoted Rate Quoted Rate
1 Clearing & Grubbing (C & G) Ha a) Light Jungle Ha 21270.00 62000.00 62000.00 b) Thorny Jungle Ha 28658.00 2 Excavation in Ordinary Soil Cum 61.00 150.00 150.00 3 Excavation in Ordinary rock Cum 90.00 4 Excavation in Hard Rock Cum 582.00 470.00 470.00 5 Embankment with Roadway Cutting Cum 72.00 6 Embankment with Borrow Pits Cum 165.00 425.00 425.00 7 Sub Grade Cum 8 Granular Sub Base (GSB) Cum 1570.00 2650.00 2600.00 9 Water Bound Mecadam ( WBM) Cum 1800.00 10 Wet Mix Mecadam (WMM) Cum 1700.00 2800.00 2750.00 11 Construction of Shoulders Cum 170.00 425.00 425.00 12 Dense Bituminous Macadam ( DBM ) Cum 8300.00 13 Prime Coat Sqm 29.00 90.00 90.00 14 Surface Dressing Sqm 95.00 112.00 112.00 15 Tack Coat Sqm 11.00 21.00 21.00 16 Bituminous Course ( BC) Cum 9200.00 10500.00 9850.00 17 Semi-Dense Bituminous Concrete ( SDBC) Cum 12500.00 11500.00 18 Excavation for Structures in Ordinary Soil Cum 90.00 204.00 204.00 19 Excavation for Structures in Ordinary Rock Cum 300.00 344.00 344.00 20 Excavation for Structures in Hard Rock Cum 949.00 949.00 21 Concrete - PCC - M 15 Cum 4779.00 7500.00 7500.00 a) Heigth upto 5m to 10m 5555.00 22 Concrete - M - 20 Cum a) Upto 5m Height / Sub Structure Cum 9200.00 9200.00 b) Height upto 5 - 10 m / Super Structure Cum 9600.00 9600.00 23 Concrete - M - 25 Cum a) Upto 5m Height / Sub Structure Cum 5852.00 11000.00 11000.00 b) 5m to 10m Height/ Super Structure Cum 8152.00 13000.00 24 Concrete - M -30 Cum 8800.00 a) Upto 5m Height Cum 12500.00 12250.00 b) Height upto 5 - 10 m Cum 11105.00 25 Wearing Coat M-30 Cum 9800.00 13500.00 13500.00 26 Supplying & Fitting HYSD bars / Sub structure MT 65000.00 90000.00 88000.00 27 Providing & Laying Filter Media Cum 1700.00 2696.00 2696.00 28 Backfilling Cum 350.00 1267.00 1267.00