Project.: DUBAI CREEK HARBOUR DEVELOPMENT- Harbour Gate PLOT -A030 ECS Date.

:
Contract/LOA No.: 5594 Project No.: 16052 ECS Revision.: 00
Engineer Comments Sheet (ECS) Discipline.: HSE

Engineer in Charge.: Ghazi Jabr, Senior Resident Engineer A= Approved B=Approved As_ Noted
Doc. / TRL Ref.No& Rev.: 16052-TGC-MTH-ARC-00021 C=Not Approved_ Resubmit D=Incomplete_ Resubmit
Doc/ Drwg Title: Method statement for GRP Lamination for RCC Tank E=Information_ Record
Document Date: 22/01/2019 Unifier Record No & Date.: CS-1757, 22/01/2019 Review Status.: D- Incomplete_ Resubmit

No Reviewer’s Doc. Ref./ Section/ Contractor Open/


Engineers Observations/ Comments
Ref. Page/ Clause) Response Closed
16052-TGC-MTH-ARC
1 SSH/Rao Refer to Section 6.3 – Safety Control measures – The Contractor has failed to identify the task specific PPE. Open
-00021
SSH/Rao 16052-TGC-MTH-ARC Refer to Section 8.1 – The material shall be stored at the designated chemical storage area where associated control measures
2 Open
-00021 related to the chemical storage area shall be in place.
SSH/Rao 16052-TGC-MTH-ARC
3 Refer to Section 11 – Permit to work in Confined space shall be obtained before entering into the tank. Open
-00021
SSH/Rao 16052-TGC-MTH-ARC Open
4 Refer to Section 11 – What does it mean “’ Al Sahel’” Safety regulations?
-00021
16052-TGC-MTH-ARC
5 SSH/Rao Refer to Section 12 – All operatives working in the Confined space should possess third party training. Open
-00021
16052-TGC-MTH-ARC
6 SSH/Rao Risk Assessment – The Contractor has failed to identify all risks in regards to working with chemicals in a confined space. Open
-00021
7 SSH/Rao 16052-TGC-MTH-ARC Following requirements considering the associated risks during lamination for GRP RCC tank to be enforced such Open
-00021 as but not to be limited to;

 TBT shall be conducted for personnel about hazards presence in GRP water tank lamination associated
works. Close supervision shall be required at all time.
 All works throughout the period of work being carried out and therefore, must be followed in accordance
with applicable local and Federal Legislations.
 Main contractor HSE plans & procedures must be adhered at all times.
 Ensure proper cable management in line with DCHD HSSE standards
 Suitable fire extinguisher shall be ensured in accordance with the fire load.
 Power tools to be operated by authorised/trained operatives only
 All PMV & Electrical equipment’s (Including supplier/vendor’s) shall be inspected & certified safe for use
prior to deploying at site.
 Ensure hazardous waste materials are disposed correctly according to the Municipality regulation and a
disposal records are documented
 MSDS & COSHH to be part of MSRA
 All personnel including operators / drivers shall be inducted on project specific HSE requirements prior to
entering to site.
 Ensure people shall be aware of established emergency response procedures

SSH-QSE01_FRM_XXX_V2.0_CD Page 1 of 2
No Reviewer’s Doc. Ref./ Section/ Contractor Open/
Engineers Observations/ Comments
Ref. Page/ Clause) Response Closed
 Provision of suitable rescue and resuscitation equipment are in place (Especially First-aid kit and eye wash
station)
 Where such equipment’s are provided for use, training of rescuers in their correct operation is essential
 Provide sufficient Lighting / illumination in the work area
 Ensure all electrical equipment's and panel (include SMDB, DB, MDB & control panel) must have a proper
earth connection.
 Before a confined space entry or work begins, potential hazard evaluation shall be conducted and a work
permit shall be issued and signed by a competent person designated by the contractor to authorize entry.
 Ensure all employees who are required to enter confined spaces or act as entry supervisors or attendants,
and rescue members shall be trained to acquire the skills and procedures necessary for safe performance of
their responsibilities while working in the confined space

Engineer’s Representative’s Contractor’s representatives


Name.: Telaprolu Rao Name.:
Sign & Sign & Date.:
Date.: 02/02/2019
Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor shall be solely responsible for the soundness and the correctness of the submitted materials and document.

SSH-QSE01_FRM_XXX_V2.0_CD Page 2 of 2