16052-TGC-MTH-ARC-00021 - Engineer's Comments - Rev.03

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Project.: DUBAI CREEK HARBOUR DEVELOPMENT- HARBOUR GATE PLOT -A030 ECS Date.

:
Contract/LOA No.: 5594 Plot No.: 4158716 ECS Revision.: 03
Engineer Comments Sheet (ECS) Discipline.: HSE

Engineer in Charge.: Adam Dillon, Operations Manager A= Approved B=Approved As_ Noted
Doc. / TRL Ref. No & Rev.: 16052-TGC-MTH-ARC-00021 C=Not Approved_ Resubmit D=Incomplete_ Resubmit
Doc/ Dwg. Title: Method Statement for GRP Lamination for RCC Tank E=Information_ Record
Document Date: Unifier Record No & Date.: CS-1757, 30 May 2019 Review Status.: B-Approved As_ Noted

Reviewer’ Engineers Observations/ Comments Contractor Response Open/


No Doc. Ref./ Section/
s Ref. Closed/
Page/ Clause)
Note
1 SSH/Rao 16052-TGC-MTH-ARC- The Contractor must ensure that all safety control measures in place as agreed in
00021 response to the Revision 02 comments. Note
2 SSH/Rao 16052-TGC-MTH-ARC- The Contractor must ensure that all hazard controls should be in place as mentioned in
00021 the MSRA. Note

Engineer’s Representative’s Contractor’s representatives


Name. T. P Rao / Devkusum Datta Name.
Sign & Sign & Date.:
Date.: 13 Jun 2019
Note: The Engineer’s approval shall not in any way relieve the Contractor of his obligation under the Contract. The Contractor shall be solely responsible for the soundness and the correctness of the submitted materials and document.

SSH-QSE01_FRM_XXX_V2.0_CD Page 1 of 1