CT DISCONNECT

BLAST JOINT
BHA
Coil Tubing to Surface
ULS SUB Coil Tubing Disconnect - Emergency release (shear)
Blast Joint - to position over perfs for perpendicular flow
Unloader (ULS) Tool - Tension/Closed; Compression/Open
375 Gator Tool - Hydro-Mechanical Perforator
Velocity Control Valve (VCV) - Pump above 200 L/min closes valve
Auto J Packer with Unloader - Compression set
375 GATOR Collar Locator - For depth correlation
Ported Bull Nose - to allow unloader to flow thru

Note: A Float Valve on top may be included if required.

Operations
• Run in hole to desired depth (Packer in "run in" position;
last motion up to close the ULS Sub)
VCV SUB
• Activate Gator by flowing at 200 L/min to close VCV &
Pressure up to 2000 psi; watch for cut signature or drop in
tubing pressure to indicate successful cut.
• Pull up 1 meter to retract blades
• Position the Blast Joint over the perforations and set Auto J
AUTO J PACKER Packer with a compression stroke. This will also open the
(COMPRESSION SET) ULS Sub
• Ready for frac ops
• Flow thru the CT at 50 L/min. This will exit out the VCV &
ULS and allow positive flow to keep fluid moving out the
coil. It will also allow for the pressure to equalize in the CT
to keep it from collapsing.
• Pump frac down the annulus of the coil.
• Once frac is pumped away, follow with an overflush.
COLLAR LOCATOR • Pull up to next zone and repeat until all stages are
complete.

PORTED BULL NOSE

DESCRIPTION:

BHA -- Annular Frac System

PROPRIETARY AND CONFIDENTIAL


THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE Jan 14, 2020
Dayln Beazer
PROPERTY OF LEE ENERGY SYSTEMS. ANY USE , REPRODUCTION OR
DISTRIBUTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN
PERMISSION OF LEE ENERGY SYSTEMS IS PROHIBITED.