ASSIGNMENT TWO:
BUSINESS IDEA: Supply and Installation of Solar Power Accessories for Off-Grid Domestic
Users.
Contents
SECTION 2 ..................................................................................................................................... 2
Operation Plan ................................................................................................................................ 2
2.1. Production Process ......................................................................................................... 2
2.2. Fixed Capital ................................................................................................................... 2
2.3. Life of fixed capital......................................................................................................... 2
2.4. Maintenance and repair................................................................................................. 3
2.5. Sources of Equipment .................................................................................................... 3
2.6. Planned capacity ............................................................................................................. 3
2.7. Future Capacity .............................................................................................................. 3
2.8. Terms and Conditions of Purchase of Equipment ...................................................... 3
2.9. Office Location and Layout........................................................................................... 4
2.10. Materials and Equipment needed and their Cost .................................................... 4
2.11. Materials Availability ................................................................................................. 4
2.12. Labour ......................................................................................................................... 4
2.13. Cost of Labour ............................................................................................................ 4
2.14. Labour Availability .................................................................................................... 5
2.15. Labour Productivity ................................................................................................... 5
2.16. Overhead Expenses..................................................................................................... 5
SECTION 3 ..................................................................................................................................... 6
Organization and Management Plan ............................................................................................... 6
3.1 Form of Business ............................................................................................................ 6
3.2 Company logo ................................................................................................................. 6
3.3 Organization Structure .................................................................................................. 7
3.4 Organizational Chart ..................................................................................................... 7
3.5 Business Experience and Qualifications of the Entrepreneur ................................... 8
3.6 Pre-Operating Activities ................................................................................................ 9
3.7 Pre-Operating Expenses .............................................................................................. 10
3.8 Office Equipment ......................................................................................................... 10
3.9 Administrative Expenses ............................................................................................. 10
1
SECTION 2
Operation Plan
2.1. Production Process
Our company deals with designing and installation of solar power system to different consumers
especially in rural areas where national grid is not connected. Business operation of the company
will be done as follows;
Products, materials and components of solar system will be imported from China at
specific industry where we can do the business as partnership.
Partnership will be done in terms and condition as specified in section 2.8
After importing, all the materials will be tested in our workshop before putting them into
the warehouse.
As per received tender, the team will be on site within 48 hours for those customers in
Dar es Salaam and 3 to 4 days for those outside Dar es Salaam.
Charges of the service will be done depends on project size and location of the site.
For those customers who cannot afford to pay total cost of service instantly, will be given
a chance to pay a certain amount each month until the debt is cleared under a specific
contract.
The company will also sell solar products and materials for those customers who don’t
need installation service.
2
Item Cost (Tshs) Depreciation Depreciation Amount
(%) ( Tshs)
Building 75,000,000.00 1.4 1,050,000/=
Solar electrical installations 5,000,000.00 10 500,000/=
Truck 25,000,000.00 4 1,000,000/=
Total annual depreciation cost 2,550,000/=
Monthly depreciation cost, Tshs 212,500/=
3
2.9. Office Location and Layout
Headquarter will be located at Dar es Salaam in Kinondoni area plot No 65 near Kawawa road
at the building owned by the company where it includes three offices, warehouse and workshop
and constructed by owners as their contribution or equity to the project. The size of each office
will be of 20 sq. meters, warehouse will have a size of 28 sq. meters and workshop 16 sq. meters.
The land is owned by company founders and has market value of Tshs 50,000,000/= and also
forms part of equity and will serve as collateral.
2.12. Labour
Labour in our company will be categorized as follows;
1. Permanent Labour
2. Part time (daily paid) Labour
Permanent labors these are the ones who will be permanently employed by an enterprise on
contract base. These are the managing director, finance manager, human resource manager, project
manager and engineers.
Part time labors are the ones who will be taken during the need and payment done per day.
4
Finance manager, BSc. In electrical engineering 5 1,000,000/= 5,000,000/=
HR, project manager
Engineers BSc. In electrical engineering 6 1,000,000/= 6,000,000/=
Part time workers Certificate in electrical L.S 10,000/=
Total salary payment for permanent workers 11,000,000/=
Part time labors productivity will be assessed as they will be carrying on day to day activities and
since they will be paid daily their employment will be terminated if they fail to meet the deadline
with no specific reason.
5
SECTION 3
The Company Physical Address is Eleven Solar-tech P.O.Box 331 Dar es salaam Tanzania
Kinondoni Plot No 65.
6
3.3 Organization Structure
The Company will be managed by Eng. Mosses, Nickson who will be the Managing Director of
the Business. The Business will have also Human Resource Manager (Marshal, Teddy),
Marketing Manager (Lugano, Benedictor), Financial Manager (Manga, Fausta) and Project
Manager (Kalalu, Elinainyi).The project Engineer will oversee the Site Engineers, Materials
Engineers and Design Engineers. The company will also hire the daily paid workers who will
assist the Site Engineer in the site works.
7
Managing Director
Workers
These members joined together and formed the company which will be engaged in selling and
installation of solar power and solar energy products.
8
3.6 Pre-Operating Activities
Before operation start Eleven Solar Tech will have to carry out the following activities for
smooth operation when operation starts:
No Activity Time
1 Company registration 1 week
2 Preparing the business plan 4 weeks
3 Applying for a loan and approval 8 weeks
4 Contacting equipment supplier 1 week
5 Setting up the offices and warehouse 2 weeks
6 Hiring labour 2 days
7 Advertising company’s services 4 weeks
The company plans to start its operation around seven weeks after the release of loan. The
following Gantt chart summarizes the above activities and their duration.
9
3.7 Pre-Operating Expenses
The mentioned above activities will cost some amount of money to be accomplished. A
summary of estimated cost for each is given below:
Activity Cost (Tsh)
Registration by ERB 150,000
Registration by BRELA 40,000
Survey cost 2,000,000
Advertisements 5,000,000
Transportation costs 1,000,000
Total 8,190,000
These equipments will cost Tshs 7,860,000/=. Annual depreciation will be Tshs 786,000/=
monthly or Tshs 65,500/= annually
10
BUSINESS IDEA: Supply and Installation of Solar Power Accessories for Off-Grid Domestic
Users.
COMPANY MAMBER
S/NO NAME REG.# PROGRAMME PHONE NO
1 LUGANO, BENEDICTOR C 2012-04-01942 B.Sc. EE 0765 202470
2 ELIAS, ELINGTON M 2012-04-01930 B.Sc. EE 0715 582770
3 DANIEL, DIONIS 2012-04-01928 B.Sc. EE 0789 233924
4 MWANI, ANDREW 2012-04-01956 B.Sc. EE 0764 516156
5 KALALU, ELINAINYI 2012-04-01938 B.Sc. EE 0688 086425
6 BATHELOMEO,EMMANUEL 2012-04-01924 B.Sc. EE 0718 142616
7 CHRISTIAN, KELVIN 2012-04-01926 B.Sc. EE 0783 005276
8 MOSES, NICKSON 2012-04-01950 B.Sc. EE 0717 055806
9 MARSHAL, TEDDY 2012-04-01947 B.Sc. EE 0712 052530
10 KAJELA, TUNTUFYE 2012-04-02384 B.Sc. EE 0755 396235
11 MANGA. FAUSTA 2012-04-01945 B.Sc. EE 0767 247860