AANWIJZING

ROLLOUT DISTRIBUSI TURNKEY PROJECT 2020


26 Desember 2019
SYAHRUL AMALUDIN
TAK KENAL MAKA TAK SAYANG

Moch. Syahrul Amaludin (Iroel)


0811-149-6313
mochamad.amaludin@mncgroup.com
2
Agenda

 Scope of Work Secara Umum


 List Of Material
 SoW Electrical
 SoW Civil
 Bisnis Proses (Permit, Planning, Rollout dan
ATP)
 Dokument Approval
 Contoh Technical Specification Kabel Udara
VISI PERUSAHAAN

4
ROLLOUT 2020

MEDAN
4.4K

JKT
115K SMG
39K
DETABEK SBY
326K 175K

BDG
95K
MALANG
63K
5
WINNING THE COMPETITION

6
HP Feeder

HP Feeder :
1. Area distribusi yang sudah memiliki Feeder dan ODC/FAT Existing
2. Area distribusi yang sudah dilewati jalur Feeder utama, memerlukan tambahan Sub-
Feeder dan ODC baru.
Scope of Work

SoW secara Umum :


1. Ijin pada RT/RW, Preman, Ormas, Sub-Feeder (Lurah/Kecamatan jika ada),
diluar perijinan PTSP/ PU.
2. Planning & Design (Ijin P&D, Survey, Design Sub-Feeder max 500m, Detail
design distribusi, Hardcopy & Softcopy design, DRM, Approval Design)
3. Rollout (Implementasi Sub-Feeder dan Distribusi, Penanaman Tiang,
Penarikan Kabel, Pemasangan ODC/FAT, Splicing, Pre-ATP)
4. PPL (Melakukan proses ATP, meliputi Pengetesan Electrical & Civil)
5. Binder Dokumentasi dan Rekonsiliasi (BA Permit Verification, Hasil ATP,
BAUT, BAST, As-built Drawing, As built BOQ, BALAP, dll).
IMPLEMENTASI
By VENDOR
DETAIL MATERIAL LIST YANG SUDAH LOLOS SCORING
OLEH MNC KABEL MEDIACOM, AKAN DILAMPIRKAN
DALAM BENTUK FILE EXCEL.
HO to ABD & Matrix
SLA 5 days Update Map
Repair Sales
Online

ATP No
Schedulin Balap Final BAST,
ATP ATP Yes Hasil Test Civil BAUT and
g Process Elektris SLA 4 days
Requirement Binder
SLA : 2 BQ Final
Hari Document

- Pre-ATP Result Rollout SLA 2 days


Civil & Electris IKR PPL
No Reconcil Rollout
FOM
PPL
Revision e Planning
Process Project Control

Yes SLA 2 days


Check by
Planning Approval
Rollout
PPL
Document

Finish
HO to ABD & Matrix
SLA 5 days Update Map
Repair Sales
Online

ATP No
Balap Final
Schedulin BAST,
Hasil Test Civil
ATP ATP Yes BAUT and
g Process
Elektris SLA 4 days
Requirement ABD & BQ Final Binder
SLA : 2
Hari Matriks Document

- As Plan – Red
Line Rollout SLA 2 days
- ABD & BQ IKR PPL
No Reconcil Rollout
- Permit FOM
PPL
Revision e Planning
Document Process Project Control
- Pre-ATP
Result Civil & Yes SLA 2 days
Electris
Approval
Check by Document
Planning
Govrel
Rollout Finish
PPL
SAFETY FIRST

21
SAFETY FIRST

22
SAFETY FIRST

23
TIPS

24
WORKSHOP ROLLOUT

25