ELECTRICAL POINTS LEGEND.

S.NO: NAMES: SYMBOLS. DESCRIPTIONS


01. POWER PLUG (15 AMP.)
02. LIGHT PLUG (5 AMP.)
03. TELEPHONE.
04. TELEVISION.
05. CEILING FAN.
06. EXHAUST FAN.
07. TUBE LIGHT.
08. HANGING LIGHT
09. WALL BRACKET LIGHT.
10. CHANDELIER.
11. MIRROR LIGHT.
12. HANGING LIGHT-2
13. DISTRIBUTION BOARD. PLACEMENT MAY CHANGE AS PER SITE
14. SWITCH BOARD.
15. 2-WAY SWITCH.
16. BELL PUSH. ON MAIN GATE OR SUITABLE PLACE
17. BELL BUZZER. SUITABLE PLACE AS PER APPROVAL
18. LAWN LIGHT. AS PER LAWN LANDSCAPE
19. GATE LIGHT ON THE MAIN GATE COLUMNS
20. INTERCOM / PHONE
21. SECURITY LIGHT
22. BRACKET FAN
23. CEILING LIGHT
24. LAN POINT
25. WI-FI ROUTER
26. SPOT LIGHT
27. SPLIT UNIT A/C
28. TRACK LIGHT
2'x2' DOWN LIGHT
29. TBS -300
418 TLD LAMP
30. DATA PATCH PANEL
UPS
31 UPS
32 TELEPHONE.J/BOX
33 COMPUTER D.B(CDB) CDB

34 GENERATOR G
35 PROJECTOR
36 BIO METRIC ACCESS CONTROL

+10'-0" ( CEILING )

+8'-6"

+7'-0"

+4'-0"

+1'-0"

FLOOR FINISH LEVEL


PAKISTAN.
ENCLAVE, ISLAMABAD,
STRUCTURAL DRAWING
Sheet Number:
Original drawing is A3. Scale entities accordingly if reduced

COMPOUND IN DIPLOMATIC

STORIES PRE FABRICATED


CONSTRUCTION OF TWO
ITB/UNOPS/PKOC/2012/
PREMISES/002

OFFICE BUILDING AT UN
No.

HVAC CONSULTANT

PUBLIC HEALTH DRAWINGS

ELECTRICAL DRAWINGS
Issue Description
Date
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

S2 S3 2 2 S4 S5 S6
S2 3X1.5mm 3X1.5mm
S2 S3 2 2 2
S2 S2 S2 S2 3X1.5mm 4X1.5mm 5X1.5mm
S3 S1 S4 2S toilet S1 S2 S3 S6 S6 S5 S5 S4
S1 S1 S2
2 S1 S1 2
4X1.5mm S1 S4
4X1.5mm 2 2
4X1.5mm 4X1.5mm
S2 S2 S3 S2 S1
S6 S2 S2 S1 S1 STRUCTURAL DRAWING
S5 S1 2 R1
2S S1 2 4X1.5mm S5
2S 3S 3X1.5mm
DB 2 2
Bio Metric R2 3X2.5mm B1 3X2.5mm
2 3X2.5mm
Y2 3X2.5mm S2
2
DB S1 DB S1 S2 S3 S4 S3 S4 S5 S6 S7 DBS6 ELECTRICAL DRAWINGS
S6

Bio Metric
S2 S1 2 2 DB 2
6S 2 3X1.5mm 2
3X1.5mm 3X1.5mm 6X1.5mm S4 S5
2
5X1.5mm 2 2
3X1.5mm 4X1.5mm 3X1.5mm
S1 S5 S4 3X2.5mm
2
DB R4
DB S1 S6 S6 S5 S5
Y4 2
B2 S2 2
3X1.5mm 4X1.5mm 3X2.5mm
2
PUBLIC HEALTH DRAWINGS
R3
2
3X2.5mm
2
2 Y1
3X2.5mm 2 2 2 2 DB
3X1.5mm 4X1.5mm 3X1.5mm 4X1.5mm 6X1.5mm
Bio Metric
S1
DB
S4 2 S2
S6 S1 S1 B3 2
S4 3X1.5mm S3 S3 S2 S1 S1 HVAC CONSULTANT
S2 LPDB-F 3X2.5mm
DB S4
S2 Y3 2
S1 R5 S10
3X2.5mm S2 S3 S2
DB B4
2 S3 S2 S3 S1
2 S4 4X1.5mm S4 S10
S3 4X1.5mm S3
2

S2 S4 3X2.5mm
S7
S9 2 S8
4X1.5mm 2
S3 3X1.5mm
S1 S2 DB
S1 S4
S8 S3
R2
S4 S7 S5 S7 S6 3X2.5mm
2

No. Issue Description Date

S2 S2 S3
S1 S1 Bio Metric

Original drawing is A3. Scale entities accordingly if reduced


Sheet Number:
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

S3 S2 3X1.5mm
S3 2 2 2
S2 S2 4X1.5mm 5X1.5mm 6X1.5mm
S6 S5 S4 2S S1 S2 S3 S6 S6 S5 S5 S4
S1 S2
S1 S1 2
4X1.5mm S4
2 2
4X1.5mm 4X1.5mm
S2 S2 S3 S2 S1
S3 S2 S2 S1 S1 STRUCTURAL DRAWING
S3 S1 2 R1
2S 3S S1 2 3X1.5mm
3S 4X1.5mm
DB 2
Bio Metric B1 3X2.5mm 2
3X2.5mm
2 Y1
S2 R2
2
3X2.5mm DB DB S1 S2 S3 S3 S4 S5 S6 S7 DB ELECTRICAL DRAWINGS
S1 S2 2 DB
6S S1 3X1.5mmS23X1.5mm 2
3X1.5mm 3X1.5mm 6X1.5mm S4 2 S5
2
5X1.5mm 2
4X1.5mm 2
3X1.5mm
2 2 2 3X1.5mm 2
4X1.5mm 3X2.5mm 3X2.5mm
Y3 S2 5X1.5mm B5
DB S1 S4 S3 2 S1 3X2.5mm
2

Y2 S2 S2 S1 4X1.5mm
S8 B2 PUBLIC HEALTH DRAWINGS
S1 R3 3X2.5mm
2 2
6X1.5mm Y5 3X2.5mm
2

2 DB 2 2 2 2 2
4X1.5mm 3X1.5mm 4X1.5mm 5X1.5mm 6X1.5mm 7X1.5mm
Bio Metric
S1 S3 3X2.5mm
2
B3
DB S8 S7 S6 S5 S4 S3 S2 S1 HVAC CONSULTANT
S7 S2 S4 S2
S1 LPDB-F 2
S2
2
4X1.5mm 2 4X1.5mm 2
R3 2
S1 B4 5X1.5mm
3X2.5mm
S1 S2 S3 S2 5X1.5mm
2S S2
DB Y4 S3
2 2 S1 S2 S1
3X1.5mm 2 S3 4X1.5mm DB 2 S10 S10
2
3X1.5mm
S3 S2 4X1.5mm 3X2.5mm
S6 S3 B4 4S 2
2 4X1.5mm
2 S9 3X1.5mm
3X1.5mm
2 S4 S5 S6 2
4X1.5mm 2 S8
3X1.5mm 3X1.5mm
S3 S4 DB S1 S2 2 DB
S5 S6 2
6X1.5mm S5
4X1.5mm
S1
S5 S4 S7 S2
R4 2 R5
S3 S2 S1 3X2.5mm S7 2
S4 2 2
5X1.5mm 5X1.5mm S6 2S 3X2.5mm
No. Issue Description Date

Original drawing is A3. Scale entities accordingly if reduced


Sheet Number:
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

T0 DATA
3X4.0mmsq RACK PANEL
25mm dia Pipe 3xCAT -6 E
PVC CB1 CR1
CAT -5 E CR2 CB1 3X4.0mm
2 CY1 3X4.0mm
2

CY2 Y8 TJB 25mm dia Pipe 25mm dia Pipe


CR2 2
25mm dia Pipe 25mm dia Pipe
CAT -5 E 3X2.5mm CB1
CDB TJB CR2 Y10 CDB
CY1 3X2.5mm CDB R10
B11 Y10 Y10 DB R10 R10 CAT -5 E
2
3X2.5mm CAT -5 E CAT -5 E CAT -5 E
2
3X2.5mm
3X2.5mm
2
TJB TJB CAT -6 E STRUCTURAL DRAWING

TJB
B10
2
3X2.5mm DB Y11 2 R11 2
2xCAT -6 E 2xCAT -6 E 3xCAT -6 E
3X2.5mm 3X2.5mm T0 DATA T0 DATA T0 DATA
RACK PANEL RACK PANEL RACK PANEL ELECTRICAL DRAWINGS
CAT -5 E 3xCAT -6 E 3xCAT -6 E
TJB
3xCAT -6 E 3xCAT -6 E 3xCAT -6 E 3xCAT -6 E 3xCAT -6 E
CDB
2
3X4.0mm CAT -5 E
25mm dia Pipe
R12CDB
R7 PUBLIC HEALTH DRAWINGS
R7 TJB
3X4.0mmsq CAT -5 E CAT -5 E CAT -5 E CAT -5 E CAT -5 E CAT -5 E
CB2 T0 DATA TO CDB 3X4.0mm
2
TJB TJB CR5 CAT -6 E TJB
CB2 RACK PANEL Y12 CDB TJB TJB CB4 TJB
3X4.0mmsq 2
CB4 2
CR5 3X4.0mmCB5
2 2 CY5

UPS
R7 3xCAT -6 E
TO CDB
B9 CDB CDB 3X4.0mm 3X4.0mm 3X4.0mm
DRP 25mm dia Pipe 25mm dia Pipe 25mm dia Pipe 25mm dia Pipe
CDB
B7 TO DB 3X4.0mmsq 3X4.0mmsq CB4 CR5 CB5 CY5
R73X4.0mmsq 25mm dia Pipe 2 2 2 HVAC CONSULTANT
3xCAT -6 E
3X4.0mmsq CY4 Y9 CDB Y9 3X2.5mm CDB Y9 3X2.5mm CDB R9 3X2.5mm CDB R9
25mm dia Pipe LPDB
B7 CB3 UP F.F. DB Y9 R9 DB R9
CDB CDB TJB
B7 50MM dia 2
2 2 2 3X2.5mm 2
CY3 3X4.0mm 3xCAT -6 E CDB 3xCAT -6 E
3X2.5mm 3X2.5mm
3X4.0mm
25mm dia Pipe B7 3X4.0mm
2 3xCAT -6 E 3xCAT -6 E 25mm dia Pipe
3X4.0mmsq
T0 DATA 25mm dia Pipe 25mm dia Pipe
T0 DATA CDB
Y7 RACK PANEL
3xCAT -6 E RACK PANEL R7 3xCAT -6 E
R8 CAT -5 E
CR3 3xCAT -6 E TJB 2
R8
R8
T0 DATA CR3 T0 DATA 3xCAT -6 E
3X2.5mm
2
RACK PANEL 3X2.5mm
CDB CDB RACK PANEL 3X4.0mm
2

R8 3X4.0mmsq 25mm dia Pipe


3xCAT -6 E 25mm dia Pipe
CR4 3xCAT -6 E R7
CR4 No. Issue Description Date
CDB
B8 3X4.0mmsq
25mm dia Pipe 4Cx70mmsq PVC/PVC
1cx35mmsq PVC
62MM dia PVC PIPE
4 CORE 35 mmsq PVC/PVC
1CX 16 mmsq PVC

100 KVA
ATS GENERATOR
G
2x70mmsq PVC

EARTH PIT

KWH KWH
METER F.F. G.F. METER
4 CX 35 mmsq PVC/PVC 4 CX 35 mmsq PVC/PVC
1C 16mmsq PVC 1C 16mmsq PVC
100 AMP FP
100 AMP FP

G-FLR
F-FLR

MCCB
MCCB

TR PANEL
(WEATHER PROOF) 4 CORE 70 mmsq PVC/PVC
1C 35mmsq PVC
Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:
(PAD MOUNTED) TRANSFORMER
2x70mmsq PVC 100 KVA

H.T. 11 KVA CABLE


EARTH PIT

FROM
WAPDA SUPPLY
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

3X4.0mmsq
25mm dia Pipe
PVC CB1 CR1
CAT -5 E CR2 CB1 3X4.0mm
2 CY1 3X4.0mm
2

CY2 Y8 TJB
CR2 2
25mm dia Pipe 25mm dia Pipe
CAT -5 E 3X2.5mm CB1 2
CDB TJB CR2 Y10 CDB
CY1 3X2.5mm CDB R10
B11 Y10 Y10 DB R10 R10 CAT -5 E
2
3X2.5mm CAT -5 E
2 20mm dia Pipe
3X2.5mm
3X2.5mm
2 CAT -6 E STRUCTURAL DRAWING

CAT -5 E TJB TJB


B10 20mm dia Pipe
2 TJB
3X2.5mm DB Y11 2 R11 3xCAT -6 E
3X2.5mm
2 TJB
3X2.5mm
ELECTRICAL DRAWINGS
CAT -5 E 3xCAT -6 E 3xCAT -6 E
TJB
3xCAT -6 E 3xCAT -6 E 3xCAT -6 E 3xCAT -6 E 3xCAT -6 E
CDB
3X4.0mm CAT -5 E
25mm dia Pipe
R12CDB
R7 PUBLIC HEALTH DRAWINGS
TJB CAT -5 E CAT -5 E
3X4.0mmsq CAT -5 E CAT -5 E CAT -5 E CAT -5 E
CB2 R7 T0 DATA TO CDB 3X4.0mm
2
TJB TJB CR5 CAT -6 E TJB
CB2 Y12 CDB TJB TJB CB4 TJB
RACK PANEL 2
CB4 2
CR5 3X4.0mm CB5
2 2 CY5

UPS
R7 3xCAT -6 E 3X4.0mmsq B9 CDB CDB 3X4.0mm 3X4.0mm 3X4.0mm
DRP 25mm dia Pipe 25mm dia Pipe 25mm dia Pipe 25mm dia Pipe
B7
TO CDB
TO DB 3X4.0mmsq 3X4.0mmsq CB4 CR5 CB5 CY5
R7 25mm dia Pipe 2 2 HVAC CONSULTANT
3X4.0mmsq CY4 Y9 CDB Y9 3X2.5mm CDB Y9 CDB R9 3X2.5mm CDB R9
LPDB
B7 CB3 DB Y9 R9 DB R9
CDB FROM G.F. TJB 2
2 B7 50mm dia 2 2 3X2.5mm
CY3 3X4.0mm 3xCAT -6 E CDB 3xCAT -6 E
3X2.5mm 3X2.5mm
3X4.0mm
25mm dia Pipe B7 3X4.0mm
2 3xCAT -6 E 3xCAT -6 E 25mm dia Pipe
3X4.0mmsq
T0 DATA 25mm dia Pipe 25mm dia Pipe
T0 DATA CDB
Y7 RACK PANEL
3xCAT -6 E RACK PANEL R7 3xCAT -6 E
R8 CAT -5 E
CR3 3xCAT -6 E TJB 2
R8
T0 DATA R8CR3 T0 DATA 3xCAT -6 E 2
3X2.5mm
RACK PANEL 3X2.5mm
CDB CDB RACK PANEL 3X4.0mm
2

R8 3X4.0mmsq 25mm dia Pipe


3xCAT -6 E 25mm dia Pipe
CR4 3xCAT -6 E R7
CR4 No. Issue Description Date
CDB
B8 3X4.0mmsq
25mm dia Pipe

Original drawing is A3. Scale entities accordingly if reduced


Sheet Number:
CONSTRUCTION OF TWO
B6 R7 B11 R12 B15 RYB-16 B6 R7 B11 R12 B15 RYB-16
STORIES PRE FABRICATED
R1 R1
OFFICE BUILDING AT UN

4CX10MMsq PVC/PVC

4CX10MMsq PVC/PVC
5/15 A 5/15 A COMPOUND IN DIPLOMATIC
LIGHTS CKT S/SOCKET LIGHTS CKT S/SOCKET
ENCLAVE, ISLAMABAD,

1CX6MMsq PVC

1CX6MMsq PVC
18 NOS 15 NOS 20 A A/C UNIT 18 NOS 15 NOS 20 A A/C UNIT
10 A SP MCB SP- MCB 12 NOS 10 A SP MCB SP- MCB 12 NOS
20 A 20 A PAKISTAN.

FOR CDB

FOR CDB
10A 10A 16A 16A SP-MCB 10A 10A 16A 16A SP-MCB
SP
MCB
SP
MCB
SP
MCB
SP
MCB
SP
MCB
SP
MCB
SP
MCB
SP
MCB ITB/UNOPS/PKOC/2012/
PREMISES/002
32A 32A 32A 32A
ELCB ELCB ELCB ELCB
(DP) (DP) 20A 20A 30A (DP) (DP) 20A 20A 30A
SP SP TP SP SP TP
MCB MCB MCCB MCB MCB MCCB

COPPER BUS BAR V R Y B COPPER BUS BAR V R Y B

100 AMPS TP MCCB 100 AMPS TP MCCB


LPDB-FIRST.FLOOR LPDB-GROUND.FLOOR
KWH METER KWH METER

STRUCTURAL DRAWING

4 CORE 35 mmsq PVC/PVC


1CX 16 mmsq PVC

4 CORE 35 mmsq PVC/PVC ELECTRICAL DRAWINGS


1CX 16 mmsq PVC

100 KVA
ATS GENERATOR
G
PUBLIC HEALTH DRAWINGS

2x70mmsq PVC
HVAC CONSULTANT

CR1 CB6 CR1 CB6 EARTH PIT


COMPUTER COMPUTER
OUT LETS OUT LETS
18 NOS 18 NOS
16 A SP MCB 16 A SP MCB

16A 16A 16A 16A


KWH KWH
SP
MCB
SP
MCB
SP
MCB
SP
MCB METER F.F. G.F. METER
32A 32A
ELCB
(DP)
ELCB
(DP) 4 CX 35 mmsq PVC/PVC 4 CX 35 mmsq PVC/PVC
No. Issue Description Date
1C 16mmsq PVC 1C 16mmsq PVC

CDB-GROUND.FLOOR R Y B CDB-FIRST.FLOOR R Y B

100 AMP FP
100 AMP FP
30 AMPS TP MCCB 30 AMPS TP MCCB

G-FLR
F-FLR

MCCB
MCCB
30 AMPS FP 30 AMPS FP
(C/ OVER SWITCH) (C/ OVER SWITCH)

4 CORE 10 mmsq PVC/PVC 4 CORE 10 mmsq PVC/PVC


1CX 6 mmsq PVC 1CX 6 mmsq PVC TR PANEL
(WEATHER PROOF)
4 CORE 70 mmsq PVC/PVC
FROM L/PDB G FLOOR FROM L/PDB FIRST FLOOR
1C 35mmsq PVC

(PAD MOUNTED) TRANFORMER


2x70mmsq PVC 100 KVA Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:

H.T. 11 KVA CABLE


EARTH PIT

FROM
WAPDA SUPPLY
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

CCTV CCTV
CCTV
CCTV

STRUCTURAL DRAWING

SPEAKER SPEAKER
CCTV ELECTRICAL DRAWINGS

CCTV

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

CCTV EMPLIFIER
MONTER
CCTV
SPEAKER

CCTV

SPEAKER
CCTV
No. Issue Description Date

CCTV CCTV

LEGEND

1- ALL THE CONDUIT PIPES OF FIRE ALARM SYSTEM Sr. Description Legend
1. CCTV CAMARA
(FAS) , PUBLIC ADDRESS SYSTEM (PAS) CCTV

2. CCTV MONITOR
SECURITY SYSTEM( CCTV) AND TELPHONE/INTERCOM
SYSTEM ARE GOING TO RECEPTION/SECURITY OFFICE OR 3. AMPLIFIER

AS DIRECTED BY OWNER/ ENGINEER/ ARCHITECT. 4. SPEAKER

2- THE LOCATION OF FITTINGS/ FIXTURES/ DEVICES CAN BE RE-ADJUSTED


KEEPING IN VIEW THE SYMMETRY AND AESTHETIC Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:
OF SPACE/ AREA & AS PER SITE REQUIREMENT.
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

SPEAKER SPEAKER
CCTV ELECTRICAL DRAWINGS

CCTV

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

CCTV
SPEAKER

SPEAKER

No. Issue Description Date

LEGEND

Sr. Description Legend


1. CCTV CAMARA CCTV
1- ALL THE CONDUIT PIPES OF FIRE ALARM SYSTEM
2. CCTV MONITOR
(FAS) , PUBLIC ADDRESS SYSTEM (PAS)
3. EMPLIFIER
SECURITY SYSTEM( CCTV) AND TELPHONE/INTERCOM
4. SPEAKER
SYSTEM ARE GOING TO RECEPTION/SECURITY OFFICE
OR AS DIRECTED BY OWNER/ENGINEER/ARCHITECT.

2- THE LOCATION OF FITTINGS/FIXTURES/DEVICES CAN BE READJUSTED Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:

KEEPING IN VIEW THE SYMMETRY AND AESTHETIC


OF SPACE/ AREA & AS PER SITE REQUIREMENT.
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
Equivalency chart of sizes of cable/wire COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
British vs American PAKISTAN.
ELECTRICAL, FIRE ALARM & SOUND SYSTEM British/Imperial System American/metric System ITB/UNOPS/PKOC/2012/
BSS-2004 BSS-6004 PREMISES/002
01 E-00 ELECTRICAL LEGEND & NOTES STRANDING NO WIRE/ OVERALL STRANDING NO WIRE/ OVERALL
02 E-01 GROUND FLOOR LIGHTING LAYOUT S.NO: DIAMETER, INCH DIAMETER, INCH 2 DIAMETER, MM DIAMETER, MM 2

03 E-02 FIRST FLOOR LIGHTING LAYOUT 01. 1/0.044" 0.015"


04 E-03 GROUND FLOOR POWER LAYOUT 02. 3/0.029" 0.002" 3/0.74mm 1.0mm2
05 E-04 FIRST FLOOR POWER LAYOUT 03. 3/0.036" 0.003" 3/0.91mm 1.5mm2

06 E-05 SINGLE LINE DIAGRAM 04. 7/0.029" 0.045" 7/0.74mm 2.5mm2 STRUCTURAL DRAWING

07 E-06 GROUND FLOOR FIRE ALARM LAYOUT 05. 7/0.036" 0.007" 7/0.91mm 4 mm2

08 E-07 FIRST FLOOR FIRE ALARM LAYOUT 06. 7/0.044" 0.001" 7/1.12mm 6 mm2 ELECTRICAL DRAWINGS

09 E-08 GROUND FLOOR SOUND SYSTEM 07. 7/0.052" 0.0145" 7/1.32mm 10 mm2

10 E-09 FIRST FLOOR SOUND SYSTEM 08. 7/0.064" 0.0225" 7/1.63mm 16 mm2 PUBLIC HEALTH DRAWINGS

19/0.044" 0.03" -- -
11 E-10 EQUIVALENCY CHART 09.
10. 19/0.052" 0.04" 19/1.32mm 25 mm2
12 F-G1 LIGHTING PROTECTION EARTH DETAIL HVAC CONSULTANT

11. 19/0.064" 0.06" 19/1.63mm 35 mm2


12. 19/0.072" 0.075" 19/1.83mm 50 mm2
13. 19/0.083" 0.1" 19/2.11mm 70 mm2
14. 37/0.072" 0.15" 37/1.83mm 95 mm2
15. 37/0.083" 0.2" 37/2.11mm 120 mm2
16. 37/0.093" 0.25" 37/2.36mm 150 mm2 No. Issue Description Date

17. 37/0.103" 0.3" 37/2.62mm 185 mm2


18. 61/0.093" 0.4" 61/2.36mm 240 mm2
19. 61/0.103" 0.5" 61/2.62mm 300 mm2
20. 91/0.93" 0.6" 61/2.62mm 400 mm2
21. 91/0.103" 0.075" 61/2.62mm 500 mm2
22. 127/0.103" 1.0" 61/2.62mm 630 mm2
23. 1.25" 800 mm2
24. 1.5" 1000 mm2

Original drawing is A3. Scale entities accordingly if reduced


Sheet Number:
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

SD SD SD SD
SD
SD SD STRUCTURAL DRAWING

SD
2c 1.5 mm sq
3x 2.5 mm sq SD 2c 1.5 mm sq
2c 1.5 mm sq SD 25mm dia Pipe 3x 2.5 mm sq
ELECTRICAL DRAWINGS
SD 25mm dia Pipe
2c 1.5 mm sq
2c 1.5 mm sq 3x 2.5 mm sq
3x 2.5 mm sq 25mm dia Pipe SD PUBLIC HEALTH DRAWINGS

25mm dia Pipe


SD SD

FACP
SD HVAC CONSULTANT
SD
2c 1.5 mm sq
SD
SD SD
SD

SD SD SD

No. Issue Description Date

LEGEND

Sr. Description Legend


1. SMOKE DETECTOR

2. HEAT DETECTOR

3. Manual Call Point

4. Sound Point (Sounder)


5. Fire Resistant Cable
Fire Alarm Control Panel FACP Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
SD COMPOUND IN DIPLOMATIC
SD SD SD SD ENCLAVE, ISLAMABAD,
PAKISTAN.
SD
SD SD
SD
ITB/UNOPS/PKOC/2012/
PREMISES/002
2c 1.5 mm sq SD 2c 1.5 mm sq
3x 2.5 mm sq SD
25mm dia Pipe SD

2c 1.5 mm sq
3x 2.5 mm sq
25mm dia Pipe SD SD
SD SD
SD SD
SD STRUCTURAL DRAWING
2c 1.5 mm sq
2c 1.5 mm sq
SD SD
SD SD
ELECTRICAL DRAWINGS

2c 1.5 mm sq
SD SD SD SD PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

NOTES
LEGEND
1. The design of fire detection system shall strictly comply in all respects to the recommendations of BS 5839-1:2002.
2. All the devices including Control & Indicating Equipment (C.I.E), smoke/heat detectors, manual call points, flash points,
Sr. Description Legend sounder & power supply shall comply to the relevant EN-54 standard.
1. SMOKE DETECTOR 3. Cable shall be fire resistant type in strict compliance to BS 5839-1:2002 clause 26 (standard cable).
4. The cables shall be installed in rigid metal conduit of size not less than 1/2".
2. HEAT DETECTOR 5. The detectors shall be of optical smoke type with heat sensors and can be adjustable for different operating modes and No. Issue Description Date

sensitivity levels.
3. Manual Call Point
6. The entire building is categorized as P1/M and all areas of the building shall be protected by automatic fire detector except
4. Sound Point (Sounder) for toilets & bath rooms .
5. Fire Resistant Cable 7. The floor area of the building shall be divided in separate zones such that single zone shall not exceed 2000 m2.
8. The sound pressure level of alarm signals should be not less that 65 dB (A) throughout all accessible area of the building.
Fire Alarm Control Panel FACP
9. Where sound pressure level of background noise is greater than 60 dB, the level of fire alarm should be 5 dB above the sound
pressure level of background noise.
10. Atleast one sounder shall be provided in each fire compartment.
11. Visual alarm (Flash point) shall be provided at certain locations where considered necessary by the client.
12. Manual call points shall be located on escape routes at all story exits and exits to open area.
13. Manual call points shall be located such that no one need to travel more than 45 m to the nearest call point.
14. All Manual call points shall be fixed at height of 1.4 m above F.F.L.
15. Under flat ceiling, horizontal distance between any point in the protected area and detector nearest to that point should not
exceed 7.5 m (24.6 ft.).
16. Detector shall be installed at not less than 500 mm from any wall, partition or structural beam which is more than 250mm in
depth.
17. No detector shall be mounted within 1 meter from any inlet of a forced ventilation system.
18. Clear space of 500 mm shall be maintained below each detector.
19. Fire detector shall be sited on a ceiling such that their sensing elements are between 25 mm to 600 mm below ceiling. Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:
20. A dedicated isolating protective device (e.g circuit breaker) to be provided by the client form
the main supply to C.I.E which shall not be closed at any time.

ASSUMPTIONS

1. It is considered that no beam in the protected area ceiling is deeper than 10% of the overall ceiling height.
2. In the storage area, the gap between the racks & the ceiling shall be maintained at not less than 300 mm.
CONSTRUCTION OF TWO
600x600mm STORIES PRE FABRICATED
OFFICE BUILDING AT UN
50 50 400mm 50 50 COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
2
50X50X3MM ANGLE IRON FRAME 500X500MM HEAVY DUTY C.I OR RCC COVER PAKISTAN.

ITB/UNOPS/PKOC/2012/
GROUND LEVEL PREMISES/002

150
REMOVE ABLE PLUG FOR WATERNING

400 EARTH TEST POINT


2
600mm 2X70MM BEAR COPPER WIRE
STRUCTURAL DRAWING

100

100 ELECTRICAL DRAWINGS

TO EARTH CONNECTING POINT


2
2X70 MM WIRE IN 50MM PVC PIPE PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

1500mm
CONCRETE 1:2:4 OR
BRICK WORK

50 MM DIA G.I PIPE


No. Issue Description Date

W.L 2
2X70 MM BEAR
COPPER WIRE

5M

20mm DIA COPPER CLADDED STEEL ROD


3 METER LONG Original drawing is A3. Scale entities accordingly if reduced
Sheet Number:




CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

LAGEND AND NOTES

DWG NO:

UNOPS/AA/RCE/
P-00
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

SEWERAGE AND RAIN WATER


LAYOUT GROUND FLOOR PLAN

DWG NO:

UNOPS/AA/RCE/
P-01
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

SEWERAGE AND RAIN WATER


LAYOUT FIRST FLOOR PLAN

DWG NO:

UNOPS/AA/RCE/
P-02
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

SEWRAGE AND RAIN WATER


LAYOUT ROOF TOP PLAN

DWG NO:

UNOPS/AA/RCE/
P-03
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

MANHOLE SCHEDULE

DWG NO:

UNOPS/AA/RCE/
P-04
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

PLUMBING CONSTRUCTION
DETAILS

DWG NO:

UNOPS/AA/RCE/
P-05
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

WATER SUPPLY LAYOUT


GROUND FLOOR PLAN

DWG NO:

UNOPS/AA/RCE/
P-06
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

WATER SUPPLY LAYOUT


FIRST FLOOR PLAN

DWG NO:

UNOPS/AA/RCE/
P-07
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

LAGEND AND NOTES

DWG NO:

UNOPS/AA/RCE/
FF-00
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

FIRE FIGHTING LAYOUT


GROUND FLOOR PLAN

DWG NO:

UNOPS/AA/RCE/
FF-01
CONSTRUCTION OF TWO
STORIES PRE FABRICATED
OFFICE BUILDING AT UN
COMPOUND IN DIPLOMATIC
ENCLAVE, ISLAMABAD,
PAKISTAN.

ITB/UNOPS/PKOC/2012/
PREMISES/002

STRUCTURAL DRAWING

ELECTRICAL DRAWINGS

PUBLIC HEALTH DRAWINGS

HVAC CONSULTANT

No. Issue Description Date

SHEET TITILE:

FIRE FIGHTING LAYOUT


FIRST PLAN

DWG NO:

UNOPS/AA/RCE/
FF-02

You might also like