www.elsewedy.com
OPGW System Overview OPGW System Configuration
Optical
Terminal
Equipment Transmission Solar Power
Joint
J i t Line Cell Array Joint
J i t plant
box box
Optical
Battery & Repeater
Controller
Underground Non-Metallic Joint Enclose
Shelter Optical Fiber Cable for Underground
g
< Terminal Station > < Repeater Station > < Terminal Station >
www.elsewedy.com
OPGW System Overview Application of OPGW
Ground
G d Wire
Wi
www.elsewedy.com
ELSEWEDY Live-
Live-Line Installation
www.elsewedy.com
Live--Line installation Process
Live
Replacing the existing ground wire by OPGW without power outage on double
circuit transmission line
PROCEDURE
Preparation
OPGW stringing
www.elsewedy.com
Live--Line installation Method
Live Major Equipment
Guide Rope
-. Nominal diameter : 10mm
-. Max. Breaking strength : 2ton
Pulling Rope
-. Nominal diameter : 14mm
-. Max. Breaking strength : 4ton
Supporting Roller
-. Length : 350mm
-. Roller diameter : 36mm
-. Roller material : Aluminum
Mobile Unit
Recovery Machine
-. Runningg speed.
p 30 m/min
-. Load limit : 12㎏f or more -. Climb angle. maximum 31 degrees
60㎏f or more -. Weight. 34g
www.elsewedy.com
Live--Line installation Method
Live Accessories
Swivel
Pulley Block
Dead-end Stocking
Earthing Roller
Drum Stand
Engine Winch
www.elsewedy.com
Live--Line installation Method
Live Accessories
Fixing
Joint Box Clamp
www.elsewedy.com
Live--Line installation Method
Live Preparation
Install OPGW drum with stand at the drum field and puller at the engine
field.
Preparative equipment, fittings along the situation of working field.
Th stringing
The t i i block
bl k be
b attached
tt h d att the
th top
t andd bottom
b tt partt off tower.
t
Check
Ch k theh clearance
l between
b existing
i i ground d wire
i and d live-line
li li before
b f
stringing.
The exercise been already done and recorded during the survey ground wire
condition must be check again prior to start of installation.
Remove the existing aerial spheres and vibration damper etc.
Intervals of 10~20m to be maintained between supporting rollers.
www.elsewedy.com
Live--Line installation Method
Live Installation of supporting roller
Install supporting rollers using a mobile unit between spans. The mobile unit be shifted from
higher tower to lower tower.
Mobile Unit
Existing
Ground wire
Supporting Roller
Guide Rope Pulling Rope
www.elsewedy.com
Live--Line installation Method
Live OPGW Stringing
OPGW Stringing by using engine puller and reel winder (Pulling Tension Max.500kg)
Guide Rope
OPGW
Pulling Rope
Swivel
www.elsewedy.com
Live--Line installation Method
Live Turn-Over & Sagging
Upset the OPGW at the position of exist ground wire using chain block tension equipment.
OPGW
Come-along
OPGW
www.elsewedy.com
Live--Line installation Method
Live Remove exist ground wire
Connect pulling rope to end of ground wire, and then withdraw ground wire.
OPGW
G id Rope
Guide R
Pulling Rope
www.elsewedy.com
Live--Line installation Method
Live Retrieving supporting roller
Regain the pulling rope and supporting rollers to opposite direction between each span.
Retreat the pulling rope on ground by pulling the Pulling rope with uniform speed by manpower.
www.elsewedy.com
Safety Evaluation
www.elsewedy.com
Safety Evaluation Minimum Clearance Distance(ex.malaysia)
132kV 2440
2440mm 1067
1067mm 1524
1524mm
www.elsewedy.com
Safety Evaluation Span Length of Supporting Roller(ex.malaysia)
S [m] 2 4 5 7 9 10 11 13 14 15 17 18 20
D 0.36 0.48 0.54 0.66 0.79 0.846 0.908 1.03 1.091 1.153 1.275 1.336 1.459
D’(S'=0) 1.23 2.23 2.73 3.73 4.73 5.234 5.734 6.734 7.234 7.734 8.734 9.234 10.23
D”(S'=S*80%) 1.03 1.83 2.23 3.03 3.83 4.234 4.634 5.434 5.834 6.234 7.034 7.434 8.234
S
S’ 10m 0m
0.846 0.710
7.55m
D D’ OPGW or Rope
4.964
D”
D Minimum Clearance (1.74m)
[ Ground Roller]
OPGW Drum
www.elsewedy.com
Safety Evaluation Dry Band Arcing In Rope
Burning of
Dry Band
rope occurs in
this region by
Tracking
Potential
Leakage Current