Sr. No.

Comments

In 3D model bellow is placed before sleepers but in


1
CAD drawing bellow location is after sleeper.

There are two number of sleepers after bellow at the


2 discharge of FW Tank 351-T-01 while there is only one
sleeper shown in CAD Drawing.

There is a sleeper at 32" pipe loop as attached


3 according to 3D model but not shown in CAD Drawing.

There is a sleeper at 32" pipe loop as attached


4
according to 3D model but not shown in CAD Drawing.

There is a sleeper at 32" pipe loop as attached


5
according to 3D model but not shown in CAD Drawing.
A 2D loop is shown in 3D model but there is no such
6
loop shown in CAD Drawing

There is a sleeper shown in CAD drawing but that is not


7
present in 3D Model

8 Correct the location of sleeper in CAD Drawing

There is sleeper after section 6-6 culvert shown in CAD


9
Drawing but it doesn't exist in 3D model.
There is a sleeper at 32" pipe loop as attached
10
according to 3D model but not shown in CAD Drawing.

One sleeper is missing in CAD Drawing according to 3D


11 model.

12 A 2D loop is shown in 3D model but there is no such


loop shown in CAD Drawing

A 2D loop is shown in 3D model but there is no such


13
loop shown in CAD Drawing
A 2D loop is shown in 3D model but there is no such
14
loop shown in CAD Drawing

A 2D loop is shown in 3D model but there is no such


15
loop shown in CAD Drawing

There is a culvert shown in 3D Model but it's not there


16 in CAD drawing.

As per the site communication, elevation of sleepers in


17 shown location is more but same is not shown in 3D
Model. Please confirm.
For 6", 10" & 16" pipe some structural supports are
provided. Please provide the dimension(elevation
18
from FGL etc.) and load required for footing design of
these supports.

For 3D loop in 32" pipe a structural support is


19 provided. Please provide the dimension(elevation from
FGL etc.) and load required for footing design of this
support. And show this support in CAD drawing also.

20 There is a 2D loop in 10" makeup water pipeline but


same is not shown in AutoCAD Drawing.

There is a 2D loop in 10" makeup water pipeline but


21
same is not shown in AutoCAD Drawing.

There is a structural support for 24" pipe at TP-001


Location. Kindly provide the sectional details and loads
22
on footing of the same and locate one more sleeper in
CAD Drawing as shown in 3D model.
3D Model
CAD Drawing PEC REPLY

Model is updated as per stress


analysis and cad drawing is before
the stress anaysis.
We will update the final network
layout and
submit again.

Model is updated as per stress


analysis and cad drawing is before
the stress anaysis.
We will update the final network
layout and
submit again.

we will update the cad dawing &


support location as per stress report
& submit again.

we will update the cad dawing &


support location as per stress report
& submit again.

we will update the cad dawing &


support location as per stress report
& submit again.
we will update the cad dawing &
support location as per stress report
& submit again.

we will update the cad dawing &


support location as per stress report
& submit again.

we will update the cad dawing &


support location as per stress report
& submit again.

we will update the cad dawing &


support location as per stress report
& submit again.
we will update the cad dawing &
support location as per stress report
& submit again.

we will update the cad dawing &


support location as per stress report
& submit again.

cad drawing is updated & submitted


before stress report. & 3d model
updated after the stree report. We
will update the cad drawing
accordingly & submit.

cad drawing is updated & submitted


before stress report. & 3d model
updated after the stree report. We
will update the cad drawing
accordingly & submit.
cad drawing is updated & submitted
before stress report. & 3d model
updated after the stree report. We
will update the cad drawing
accordingly & submit.

cad drawing is updated & submitted


before stress report. & 3d model
updated after the stree report. We
will update the cad drawing
accordingly & submit.

this culvert is not required. As per


site information existing road is is in
red colour. We will update the
model.

we have update the sleepper height


as per the sleeper drawing. Kindly
sshare the all final sleeper drawing,
we will upadte the model as well as
cad drawing.
this portion pipe elevation is more
like head room clearance, kindly
suggest, B&R which type of support
want to use, rcc sleeper or tee type
support, accordingly, we give the
information.

this portion pipe elevation is more


like head room clearance, kindly
suggest, B&R which type of support
want to use, rcc sleeper or tee type
support, accordingly, we give the
information.

cad drawing is updated & submitted


before stress report. & 3d model
updated after the stree report. We
will update the cad drawing
accordingly & submit.

cad drawing is updated & submitted


before stress report. & 3d model
updated after the stree report. We
will update the cad drawing
accordingly & submit.

as per the 60% model review


comments, this portion routing will
change.we will update the model &
drawing and submit accordingly.