DCM3PJT/101/0/2009

TUTORIAL LETTER 101 FOR STUDENTS IN


DOCUMENTATION III (PROJECT)
DCM3PJT

DEPARTMENT OF CIVIL & CHEMICAL ENGINEERING


COLLEGE OF SCEINCE, ENGINEERING AND TECHNOLOGY
DCM3PJT/101/0/2009

“ANNEXURE B”

PROJECT 1

Project details

Write a specification for a cut -to- fill .earth work for a Stadium in preparation of
2010 world Cup. Use the SABS 1200 format. You will have to establish realistic
values for density requirement to fill, quality requirements and tolerances,
method of payment and sufficient items. Use SABS 1200 DA as a guide.

The stadium will be constructed in Gauteng; determine the suitable condition of


the soil.

TOTAL MARKS: 100