Standard Installation of OptiX RTN 900

Series
Standard Installation of OptiX RTN 900
Series

HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential


Installation Guide to OptiX RTN 900 Series
Revision Declaration
This document is prepared and explained by the Site Business Dept of Global Technical Service D
Specifications or documents related to this document:
Related international specifications or document consistency:
Specifications or documents that are replaced or expire:
Correlation of specifications and documents:

Version Prepared by Reviewed by Approved by Revision Record


V2.0 Ahmed M. AbdelHameed 706507 Bao HuanHuan 126488 Vodafone Acceptance team Initial release
V2.1 Ahmed M. AbdelHameed 706507 Bao HuanHuan 126488 Vodafone Acceptance team Modified Version
V3.0 Ahmed M. AbdelHameed 706507 Bao HuanHuan 126488 Vodafone Acceptance team Modified Version

Issue Date: 2010-05-11 Effective Date: 2010-05-16

Huawei Technologies Co., Ltd.

All rights reserved

Page 3
Typical Installation Scenarios for OptiX RTN 900
The IDU of OptiX RTN 900 is installed Vodafone Existing rack which is in a shelter besides the tower.
The DDF/DCDB/Rack are installed on site
The height of tower is about 12m .
Typical diameters of the MW antenna are (0.3, 0.6,1.2 meters).
Protection:1+1 HSB for RTN 950,1+0 for RTN 910
The configuration of 2 sites between this link is same
The distance between 2 sites around 1.5km
Pole
Antenna

ODU and Coupler

Rack GND

IDU DC Power

ACDB DCDB
IF cable
Ground bar
DDF
IDU
DC power cabinet PGND
Battar
y

Page 4
Standard Installation Procedure for RTN 900 Series
1.1.1 1.2.1 1.3.1 1.4.1 1.5.1
Lift IF cable & Lift & install
Preparation Assemble Pole Pre-work on tower pole, install Antenna and
pole Ground ODU Ⅰ
0:00 0:15 0:15 0:30 0:30 0:50 0:50 1:30 1:30 2:30
Operato Operato
r
B Operator B Operator B r
BC Operator BC
Star
t

1.1.2 1.2.2 1.3.2 1.4.2 1.5.2 1.6


Assemble Install coupler for (1+1) Install 19" Rack Install IDU and
Check Goods Install DC Box
Antenna and ODU (if needed) DDF

0:00 0:30 0:30 0:50 0:50 1:15 1:15 1:55 1:55 2:25 2:25 2:45
Operato Operato
r
A Operator A Operator A r
A Operator A Operator AB

1.1.3 1.2.3 1.3.3


Check Access Lift Equipment Assimble IF connector
for Far End to Far End (Outdoor)
0:00 0:15 0:15 0:45 0:50 1:15
Operato
r
C Operator C Operator C

1.7.1 1.8.1 1.10.2 1.11


Waterproof When finish installation
Route IF Site configuration Align Antenna at
and Route IF at Near End, go to Far
cable(indoor) Near End Near end
cable end
Ⅰ 2:30 3:20 3:20 3:50 9:30 10:00 10:00 11:30
Operato Operato
r
BC Operator B r
D Operator B

1.8.2 1.9.1 Far end 1.10.1 1.12.1


Finish Install Software
Labeling Cables Clear Sites Perform test
Microwave at Far end Upgrade
3:20 3:50 3:50 4:00 4:00 8:00 8:00 9:30 11:30 12:00
End
Operato
Operator C Operator C Operator ABC r
D Operator AB

1.7.2 1.8.3 1.9.2 1.11 1.12.2


Install E1 cable Install power Align Antenna at Check installation
Power on equipment
and Patching cable Far end and take photos
Ⅱ 2:45 3:00 3:00 3:40 3:40 3:50 10:00 11:30 11:30 12:00
Operato
r
A Operator A Operator A Operator AC Operator D

■A, B,and C from the site implementation team will finish the new site within 12 hours.
■Don't consider the distance between two sites
■A,B are experienced on MW installation
■D,the engineer of commissioning
5

Page5
SN Task Desccription Operator Duration
Standard Installation of OptiX RTN 900
1.1.1 Preparation B 15 minutes

1 2- Procedure
A
1 Check the design documents ;

0.3m,0.6m parabolic antenna installation manual(In packed box) ;


2
OptiX RTN 900 radio transmisssion system-IDU&ODU quick installation guide ;

3 Make the labels according to the templates approved by Vodafone ;


2-
正面 B 4
Check installation condition(place of antenna\cable\IDU, power,cable rack,earth
bar,hole,indoor entironment ;
正面 划
5 Tools (see tools card in this guide) .
线
正面 划
辅 6 Check Health and Safety condition and fill report
线

Design document 辅
板 Note


板 1
Send SMS To Vodafone to access the site (Vodafone SMS Number:5011) use
the agreed Format
3 板4
Fill in Hazard Identification & Risk Assessment Form

2 All personnel working in site should wear PPE

Tools

1 2 3

4 5 6

Materials
Label
1 2

3 4

5 6

Page 6
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.1.2A Check Goods AD 15 minutes

Procedure
Check the ITEM number on the package with MR.Including the IDU, IDU
1
accessory package, IF board, tributary board, E1 cable, rack and DDF Unit.

2 Check materials of DC/DC Power converter and DC Box with accessories

5
MR
Note

Material for Indoor Installation 2

3
DDF
IF board 4
Tributary
board Tools

IDU 1 2 3

4 5 6

Materials

1 2

3 4
E1 Power Ground IDU accessory
cable cable cable packet 5 6

Page 7
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.1.2B Check Goods AD 15 minutes

Procedure

Check whether the goods, including the antenna, ODU, ODU accessory box,
Goods for Outdoor Installation 1
and IF cable, are consistent with the MR;

Check whether the diameter and frequency band of the antenna, the frequency
2
band of the ODU are consistent with the design document.

3
ODU accessory case
4

ODU 5

Note

IF cable 1
Check the frequency
band of the ODU 2

Antenna 3

Tools

1 2 3

4 5 6

Materials

1 2
Check the diameter
and frequency band of 3 4
the antenna
5 6

Page 8
SN
Standard Installation of OptiX RTN 900 1.1.3
Pr
1 Check access Capability of Far en
2
3
4
5

1
2
3
4

1
4
M
1
3
5
Task Description Operator Duration
Check Access for Far
F 15 minutes
End
Procedure
Check access Capability of Far end to avoid any owner Problem

Note

Tools
2 3
5 6
Materials
2
4
6
划 SN Task Description Operator Duration
Standard Installation
线 of the OptiX RTN 900
辅划 1.2.1 Assemble Pole BC 15 minutes
线

辅 1- Procedure
1- 板
A 助 B
板 1 Put the first U-bolts of T-bracket at the one end of pole and fasten it ;

板 2 Put the second U-bolts of T-bracket at the other end of pole and fasten it.

1- 2- Note
C A
1 Fasten the U bolt to the pole tightly .

Tools

2- 2- 1 Wrench 2 3
B C

4 5 6

Materials

1 Microwave pole 2

3 4

5 6

Page 11
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Assemble Antenna-
1.2.2A unpacking the AD 5 minutes
equipment

1-
Procedure
1-
A B
Insert the flathead screwdriver into the hole of the tongue on the cover of the
1
wooden case, and then straighten the tongue ;

2 Remove the cover after all tongues on the cover are straightened;

3 Take out the antenna and the accessories.

正面 5

1- 2- Note
C A
1

Tools

3- 3- 1 Flathead screwdriver 2 3
A B
3 4 6

Materials

1 Antenna 2

3 4

5 6

Page 12
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Assemble the Antenna
1.2.2B of 0.3,0.6 Meter in AD 10 minutes
Diameter
1 2 3 Procedure

Determine where to install the antenna according to the azimuth and the design
1
height of the antenna, then remove bolt A on the antenna, and loosen bolt B ;

2 Loosen the bolt on the stand of the antenna;

Bolt B Bolt A 3 Adjust the elevation adjustment bolt on the stand to the middle position;

Fasten the hanging bracket to bolt B. Pass bolt A through the stand and insert
4- 4- 5- 4
bolt A in the installation hole on the antenna. Then, tighten the two bolts ;
A B A
Remove the bolts on the level adjustment screw, and then install the level
5
adjustment screw on the stand;
Remove the nuts of the level adjustment screw, and then fix the stand base to
6
the level adjustment screw;

Bolt B Bolt A Apply anti-seize grease to the level adjustment screw and the retaining bolts of
7
the antenna;
5- 5- 6-
C 8 Install the retaining bolts and clamps of the antenna on the stand base.
B A

正面 Note
Engineers should select a proper installation manner for left
1 installation or right installation based on antenna receiving
direction, mounting pipe and relevant position of surrounding object.
6- 7- 7-
B A B 2

Tools

1 Allen wrench 2 Solid wrench 3


8- 8- 8-
A B C 3 4 6

Materials

1 Antenna 2 Hanging bracket

3 Anti-seize grease 4

Page 13
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Modify the Antenna
1.2.2C AD 5 minutes
Polarization Mode

Procedure
1-
A The default polarization mode of the antenna is the vertical polarization. If the
1 radio link is designed with the horizontal polarization, the polarization mode
needs to be modified as follow ;

2 Loosen the four bolts that fix the feed boom ;

Rotate the feed boom 90 degrees smoothly, and point the polarization indicator
3
to the letter H. In this manner, the antenna is in the horizontal polarization mode;

1- 2 4 Tighten the four bolts that fix the feed boom.


B
V— 5
Vertical
6

Note

3- 3- 2
A B
H— Horizontal 3
90°
4

Tools

1 Cross screwdriver 2 3

4- 4- 4 5 6
A B
Materials

1 Antenna 2

3 4

5 6

Page 14
SN
Standard Installation of OptiX RTN 900 1.2.3

1 Lift Materials to Shelter of the


2
3
4
5

Send SMS To Vodafone to ac


1
the agreed Format
2 Fill in Hazard Identification &
3 All personnel working in site s
4

1
4

1
3
5
Task Description Operator Duration
Lift Equipment to Far
F 30 minutes
End
Procedure
Lift Materials to Shelter of the Far End site.

Note
Send SMS To Vodafone to access the site (Vodafone SMS Number:5011) use
the agreed Format
Fill in Hazard Identification & Risk Assessment Form
All personnel working in site should wear PPE

Tools
2 3
5 6
Materials
2
4
6
Task
SN. Operator Duration
Description
Standard Installation of OptiX RTN 900
1.3.1 Pre-work on tower BC 20 minutes

Procedure
1
Before you lift and install the antenna, determine the height and azimuth
1
of the antenna according to the design document by compass;

The operators should carry the following materials and tools on the tower:
the pulley, lifting rope, anti-fall clamp, ground cable of the IF cable, PVC
2
tape, waterproof tape, bundling tape, wrench, socket-head wrench,
diagonal pliers, flathead screwdriver, and paper knife;

Fix the pulley on tower above the antenna which will be mounted,thread
3
hanging rope through the pulley to ground.

Note

2- 2- 2 3
B 2
A

Tools

1 Compass 2 Hanging rope 3 Pulley

4 Safety belt 5 Tools bag 6

Materials

1 Design document 2

3 4

正面 划
线




Page 17
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.3.2 Install the ODU D 10 minutes

Procedure

2- 1 Remove the two lifting rings of the antenna ;


1 2-
A B
Remove the protective cap of the feed boom, and then apply an appropriate
2
amount of vaseline to the gasket of the feed boom;
Confirm that the ODU is consistent with the IDU in the polarization mode. Then,
3
install the ODU on the feed boom ;

4 Close the four latches cornerwise;

5 Install the removed lifting rings on the antenna.


2- 3- 3-
C A B 6

Note

1 Do not apply vaseline to the front of the feed boom.

3
4 5- 5-
A B
4

Tools

1 Cross screwdriver 2 3

3 4 6

Materials

1 ODU 2 Antenna of 0.6 meter in diameter

3 Vaseline grease 4

5 6

Page 18
划 SN Task Desccription Operator Duration
Standard Installation
线 of OptiX RTN 900
辅 1.3.2A Install coupler D 2 minutes
助 Procedure
1- 板 1-
A B
板 1
Remove the dust protection cover, by default the polarization of the coupler is
vertical, the arrow is pointing to "V";
Check the polarization from document, the default polarization mode of the
antenna is the vertical polarization then go to SN 1.3.2C . If the radio link is
2
designed with the horizontal polarization, the polarization mode needs to be
modified SN1.3.2B .

正面 4

5
线
辅 6

板 Note

1 Coupler polarization should be same as the design document.

2
2
3

Tools

1 2 3

4 5 6

Material

1 2

3 4

Page 19
划 SN Task Desccription Operator Duration
Standard Installation
线 of the OptiX RTN 900 Modify the polarization
辅 1.3.2B D 5 minutes
of coupler
助 Procedure
1- 1- 2-
A B 板 A
板 1 Loosen the screws by hex key wrench and remove the polarization part;

2 Remove the vertical polarization converter from the polarization part;

Replace the vertical polarization converter with the horizontal polarizer and
3
connect to the polarization part;
Confirm the interface of the polarization part is the same as coupler, then insert
4
the polarization part into the antenna interface of the coupler;
2- 3- 3-
A B Confirm the arrow on the polarization part points to "H",and fix the two screws
B 5
on the polarization part by hex key wrench.

Note
The waveguide direction of horizontal polarizer must be the same as the
1
polarization part.

3- 3-D 4- 2
C A
3

Tools

1 Allen wrench 2 3

4 5 6
4- 5- 5-
B A B
Material

1 Coupler 2
H - Horizontal
H - Horizontal 3 4

5 6

线




Page 20

线
SN 辅Desccription
Task Operator Duration
Standard Installation of the OptiX RTN 900 1.3.2C 助 coupler
Install D 3 minutes

1 2- 2- 板 Procedure
A B
1 Remove the two lifting rings of the antenna;

Remove the protective cap of the feed boom, and then apply an appropriate
2
ainstallof vaseline to the gasket of the feed boom;

3 Remove the protective cap of the feed boom of coupler;

正面 4 Apply anti-seize grease to the retaining bolts of the coupler;

2-C 3
划 4 5 Confirm that the coupler is consistent with the antenna in the polarization mode;
线
辅 6
Close the four latches cornerwise and tighten the four screws on the coupler,
助 fasten 4 bolts with inner hexagonal tool
板 7 Install the removed lifting rings on the antenna .

Note

1 Coupler's polarization should be as the feeder's polarization.


5 6- 6-
A B 2 Vaseline can't be lay on the surface or inner part of the feeder.

3 Storage polarization component well.

Tools

1 2 3
7- 7-
A B
4 5 6

Material

1 Coupler 2 Antenna

3 Vaseline 4


线


板 Page 21
划 SN Task Desccription Operator Duration
Standard Installation
线 of the OptiX RTN 900
辅 1.3.2D Install ODU D 5 minutes
助 Procedure
1- 1- 板 1-
A B C Remove the protective cap of the feed boom, and then apply an appropriate
1
ainstallof vaseline to the gasket of the feed boom;

2 Main ODU should be mounted on THIS SIDE UP← MAINside;

3 installODU on coupler as polarization decided.Close the 4 latches cornerwise ;

4 Install stand-by ODU on the other side of coupler with same method above .

2 3- 3- 5
A B

线 Note
辅 1 Main ODU should be mounted on“THIS SIDE UP ← MAIN”side.

板 2 The IF interface on ODU must face to the opposite from hoisting ring.

3

Tools
3-C 4- 4-
A B
1 2 3

4 5 6

Material

1 ODU 2

3 4

Page 22
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Assimble IF
1.3.3A A 20 minutes
connector(Outdoor)
Procedure

1 Place the nut to the IF cable, and then strip the sheath off the IF cable ;

2 Place the clamp to the end of the IF cable;

Fold back the shielding layer to the clamp. Then, place the sleeve between the
3
shielding layer and the insulating layer;
Sheath Shieldin InsulatingInner
g layer conducto Nut Clam Sleeve Body 4 Reserve the shielding layer of 4 mm and cut off the redundant part ;
layer r p
Strip the insulating layer off, and obtain the inner conductor of 4.5 mm. Then, file
1- 2 5
1- 1- the head of inner conductor to the arc shape;
A B C
Fit the IF cable in the body of connector, and tighten the body and nut with the
6
wrenches(S=16mm);

7 Protect the IF terminal to avoid the damage during hanging .

15.5mm
Note

3 4- 4- 4- 1
A B A
2

3
4mm
4
5- 5- 5-C 5-
A B D Tools

1 Paper knife 2 Diagonal pliers 3 Solid Wrench


4.5mm
4 File 5 Brush 6

6- Materials
6- 6- 7
A B C
1 IF cable 2 IF cable connector (N-JRG8-1 Connector)

3 4

5 6

Page 23
SN Task Description Operator Duration
Standard Installation of the OptiX RTN 900
1.3.3B Make IF cable Identify A 5 minutes

Procedure
1- 1-
A B Use Vodafone outdoor label template on both ends (before Roxtec window and
1
before connection to ODU for both Main and Protection IF cables

2 Protect the IF terminal to avoid the damage during hanging .

2- 6
2-
A B
Note

Tools

2-C 1 Cutter 2 3

4 5 6

Materials

1 PVC tape 2 Cable tie wrap (black)

3 Outdoor label 4

5 6

Page 24
划 SN Task Desccription Operator Duration
Standard Installation of线the OptiX RTN 900 Lift IF cable & Bracket,
辅 1.4.1A BC(D) 25 minutes
install Bracket
助 Procedure
1 板
2
板 1
Bind hanging rope on the upper T-bracket and bind towing rope on another T-
bracket ;
BCD hang the Bracket up and A control the Bracket not touch tower with towing
rope simultaneous;
正面 划 2
BC hold the Bracket at the position antenna will be mounted with
线 calling:"up/down" to the people on ground ;
辅 3 Clamp the upper and lower T-bracket to the tower,fasten the bolts on T-bracket;

板 4 Confirm the Bracket verticality with adjustment of the lower T-bracket.

5

Note

3 4 install the Bracket at right position on the tower as the azimuth, highet of the
1
design document.

2 Confirm the Bracket verticality.

Tools

1 Hanging rope 2 Towing rope 3 Spanner

4 Level 5 Safety belt 6

Material

1 pole 2

3 4

Page 25
划 第第 SN Task Description Operator Duration
Standard Installation of划
线the OptiX 3RTN
7 900
辅划
线 步步 1.4.1B Lift IF Cable BC 15 minutes
线


辅 Procedure


1 2-A 助

板 2-
1 Put the hanging rope along the cable ladder down to the ground;

板 B
板 2
Bind the IF cable to the lifting rope on the ground, then pull up the lifting rope
with the IF cable ;

3 Make sure that IF cable is well connected to ODU and make S-shape curve

4 connect earthing kit to the end of S-shape near pole.

3 4
6

Note
When binding the IF cable to the lifting rope, you can't bind the connector with
1
the rope. Otherwise, the connect might be damaged in the lifting process.

Tools

1 Lifting rope 2 Solid wrench 3 Diagonal pliers

4 5 6

Materials

1 IF cable 2 Bundling tape

3 4

Page 26
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.4.2A Install 19"Rack AD 10 minutes

Procedure
1 2
Mark the location of the 19" Rack according to the equipment layout, identify the
1
installation reference point and mark it for the 19" Rack installation;
Use a percussion drill with bit 16 to drill holes at the anchor points,clear the dust
2
inside and around the holes;

3 Hammer the expansion bolt until it tube completely enters the hole .

划 4

正面 线
5

助 Note

板 1
Clear the dust inside and around the holes. If the inter-hole spacing is too wide
or too narrow, locate and drill holes again;

3 2

Tools

1 Percussion drill 2 Claw hammer 3 Wrench

3 Marking pen 4 6

Materials

1 Expansion nut 2

3 4

Page 27
SN Task Description Operator Duration
Standard Installation of OptiX RTN900
1.4.2B Install 19"Rack AD 10 minutes

1- Procedure
1-
A B
1 Install the base to the frame of rack, then tighten the four bolts;

Place the rack on the hole that had been drilled , tighten the bolts to ensure that
2
Rack and base is installed together;
Wire bindings can be assembled to the front or the back of Rack frame
3
according to wire outlet.

划 4

2-
线 2- 5
A 辅 B
助 Note
板 When the wire is up-route, let the two wire bindings empty position on the top of
板 1 Rack , when the wire is dowen-route, let the two wire bindings empty at the
bottom of Rack.
2
Insulated
plate
Tools
3- 3-
A B 1 Screwdriver 2 3

4 5 6

Materials

1 19"Rack 2 Insulated plate

3 4

Page 28
划 SN Task Description Operator Duration
Standard Installation
线 of the OptiX RTN 900
1.4.2C Install 19'Rack AD 10 minutes

助 Procedure

板 1
Assemble OT terminals to one end of the PGND cable , for details, see SN
1.4.2D.

2 Link the OT terminal to the grounding screw on the 19"rack ;

3 Lay PGND cable from 19" rack to grounding bar along cable ladder ;

Assemble OT terminal to the other end of PGND cable, then link it to the
4
grounding bar .

Note
Keep the cross-section of the conductor level with the end face of the OT
1
terminal

Tools

1 Cross screwdriver 2 Crimping plier 3

4 5 6

Materials

1 OT terminal 2 Power cable with yellow green 16mm2

3 4

5 6


线
辅 Page 29



划 SN Task Description Operator Duration
Standard Installation
线 of the OptiX RTN900
辅 1.4.2D Install 19'Rack A 10 minutes
助 Procedure

1- 1- 板 1-C
1 Strip a certain length of the insulation layer off the ground cable ;
A B
Insert the exposed conductor into the core end terminal. Ensure that the
2
conductor is level with the endface of the core end terminal;

3 Press the endface to the conductor by using the crimping pliers.

5
1- 2- 2-
D A B Note
When making the core end or ring terminal, you should level the exposed
1 conductor with the endface of the terminal and press the endface to the
conductor with the crimping pliers.

2
6 MM
3

3- 3- 4
A B
Tools

1 Crimping plier 2 OT Terminal 3

正面 4 5 6

Materials

1 OT terminal 2 Power cable with yellow green

3 4

5 6

Page 30
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Lift and Install the
1.5.1A Antenna of 0.3,0.6 BC(D) 30 minutes
Meter in Diameter

Procedure
1 2 3
Before you lift and install the antenna, determine the pole and azimuth of the
1
antenna according to the design document ;

2 Install the anti-fall clamp on the pole. For details , see working procedure 1.5.1B.

3 Bind the lifting rope and pulling rope to the lifting ring and stand of the antenna ;

4 Two installation operators on the ground lift the antenna to the tower;
4 5 6
Install the two clamps of the stand around the pole and fix the clamps on the
5 stand. Then, fix the antenna according to the azimuth specified in the design
document .For details, see working procedure 1.5.1C.

6 Remove the rubber plugs of the two air holes on the bottom of the antenna;

7 Perform the grounding for the ODU. For details, see working procedure 1.5.1D.

Note
When lifting the antenna, you must use the pulling rope to prevent the antenna
7- 7- 1 from hitting the tower. In this manner, the equipment can be protected from
A B damage.
When fixing the antenna, you cannot remove the lifting rope from the antenna.
Instead, you should keep the lifting rope bound on the tower tightly till the
2
antenna is fixed to the pole. In this manner, the antenna can be protected from
falling down.
Tools

1 Lifting hook 2 Lifting rope 3 Allen wrench

4 Solid wrench 5 6

Materials

1 Antenna 2 ODU

3 Anti-fall clamp 4

Page 31
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Install the Anti-fall
1.5.1B C 5 minutes
Clamp

Procedure

1 Loosen one bolt on the anti-fall clamp;


1- 1-
A B
2 Place the anti-fall clamp around the pole;

3 Tighten the bolt to fix the anti-fall clamp to the pole.

Note
1- 2- 2-
C A B 1

Tools

3- 3- 3-C 1 Allen wrench 2 3


A B
4 5 6

Materials

1 Anti-fall clamp 2

3 4

5 6

Page 32
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Fix the Hanging
1.5.1C BC 15 minutes
Bracket

Procedure

Install the down clamps of the hanging bracket around the pole, then tighten the
1
nuts to fix the antenna to the pole;
Install the up clamps of the hanging bracket around the pole, then tighten the
2
nuts to fix the antenna to the pole.

Hanging Bracket Right Installation Hanging Bracket Left Installation 5

Note
1- 1- 2-
A b A 1 Fasten the antenna tightly.

When installing the antenna, ensure that the hanging bracket is close to the anti-
2
fall clamp .

Tools
2- 2- 2-
b C D 1 Solid wrench 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 33
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 1.5.1D
Perform the Grounding
BC 10 minutes
for the ODU

1- Procedure
1-
A B
Make a grounding cable according the distance between the ODU and the
1
Tower grounding bar,then fix the cable to the ODU grounding point ;

2 Bind the ground cable to the tower.

3 Fix the ground cable to the grounding point ;

Note
2- 2-
A B 1 The position of grounding point should be lower than the antenna.

Tools

1 Solid wrench 2 Diagonal pliers 3


3-
3- 4 5 6
B
A

Materials

1 Ground cable of the ODU 2 Bundling tape

3 4

5 6

Page 34
正面 划 SN Task Description Operator Duration
Standard Installation
线 of the OptiX RTN 900
辅 1.5.2A Install DC Box A(D) 30 minutes
助 Procedure
1 板 2

板 1 According the design document, fix the DC Box on the Shelter wall using Bolts

install Primary (Main and Protection) Power cables which connected to rectifier
2
cabinet.

3 connect Secondary cables to proper switch according to capacity Limit

Connect Primary cables to rectifier unit, ensure proper connection according to


4
Design.

5 label each cable according to agreed standard format from both Directions

6 cover the DC Box After finishing installation


3 4

Note

For RTN 950, The power cable must be 6mm 2.While the pwer cable for RTN
1
910 must be 2.5mm 2

RTN 950 connected to 20A fuse(C/B) ,while RTN 910 connected to 10A
2
fuse(C/B)

3 DC Box should be splitted into two lines (one for Main other for Protection)
5- 5-
A B Make sure that rectifier Module (DOU) is OFF to avoid any hazard during
3
installation

Tools

1 Cross screwdriver 2 Crimping plier 3 OT terminal

4 5 6

Materials
5- 6
C
1 DC Box 2 Power cable

3 Screws and Bolts 4 Plastic Duct

5 6

Page 35
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.6A Install the IDU AD 10 minutes

Procedure

1 Obtain the IDU and ground cable;


1- 1- 2
A B 2 Remove the two screws at the grounding point on the left of the IDU;

Use the removed screws to fix the ground cable to the grounding point of the
3
IDU;
Fix the four captive nuts to the installbar on the rack column, according to the
4
designed location of the IDU;
Hold the IDU with both hands and push the IDU into the rack. Then, tighten the
5 four panel screws in a diagonal sequence. In this manner, the IDU is fixed to the
rack;
Assemble OT terminals to one end of the PGND cable,Link the OT terminal to
6
the grounding screw on the 19"rack.

3- 3- 4 Note
A B
When installing the IDU 950 on a Huawei open rack, you should fix two captive
1
nuts with a space of four holes on the installbar.
2U
When installing the IDU 910 on a Huawei open rack, you should fix two captive
2
nuts with a space of one hole on the installbar.

3 Tighten the four front panel screws in a diagonal sequence.

There must be a space of two holes above and below the IDU chasssis for heat
4
disspation.
5- 5- 6
Tools
A B

1 Cross screwdriver 2 Flathead screwdriver 3

3 4 6

Materials

1 IDU 950-IDU 910 2 Ground cable

3 Four M6 captive nuts 4 Four M6 panel screws

5 6

Page 36
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.6B Install IDU Boards AD 5 minutes

Procedure

1 Take out the tributary board from the package;

Press the ejector levers with both hands. Then, insert the board smoothly along
1- 1- 2
2 the board track till the board cannot move forward;
A B
3 Push the board to ensure that the board is caught tightly;

4 Press the ejector levers inward forcibly;

5 Tighten the two screws on the front panel ;

6 Install the IF board in the same manner .

3 4 Note
5
When installing the tributary board and IF board, you should wear antistatic
1
gloves.

6- 6-
A B
1 Cross screwdriver 2 Antistatic gloves 3

3 4 6

Materials
Boards on the RTN 950-
1 2
RTN 910

3 4

5 6

Page 37
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.6C Install the DDF AD 5 minutes

1 2 Procedure
4-
A
1 Take out the DDF from the package ;

Fix the four captive nuts to the installbar on the rack column, according to the
2
deigned location of the DDF;
1U
3 Tighten the four panel screws. In this manner, the DDF is fixed to the rack .

4 systemize E1 cables inside cabinet not to reserve too much space inside it

5 Attach Labels to DDF (BNC Panels) so that the Direction is clear


3
6 connect earthing of DDF to ground bar inside Transmission cabinet

Note

When installing the DDF on a Huawei open rack, you should fix two captive nuts
4- 1
with a space of one hole on the installbar.
B
2 Tighten the four front panel screws in a diagonal sequence.

3 Newly installed DDF should be adjacent to each other as much as possible


5
4

Tools

1 Flathead screwdriver 2 Cross screwdriver 3 Label Machine


6

4 5 6

Materials

1 75-ohm DDF 2 Four M6 captive nuts

3 Four M6 panel screws 4 E1 cables

5 6

Page 38
划 SN Task Description Operator Duration
Standard Installation of the
线OptiX RTN 900 Connecting and Waterproof IF
辅 1.7.1A BCD 50minutes(Total)
connector
1-
助 2- Procedure
1-
A B
板 A
板 1
Connect the connector of IF cable to the IF interface on the ODU. Then, tighten the connector
3 gently with a wrench;
2 Wrap the connector with one layer of PVC tape 3–5 cm below the connector and toward the
1 2
direction of the ODU ;
Wrap the connector with three layers of waterproof tape 3–5 cm below the connector. The
3 wrapping directions of the three layers are from down to up, from up to down, and from down to up
respectively;
Wrap the connector with three layers of PVC tape 3–5 cm below the connector. The wrapping
4 directions of the three layers are from down to up, from up to down, and from down to up
respectively ;
5 Wrap the PVC tape on both ends tightly with cable tie. Then, cut off the redundant bundling tape.
2- 3- 3-
B A B
3 6
2
1 7

Note
When wrapping the connector with the waterproof tape and PVC tape, you should stretch the tape
1
to 3/4 of its original width. In addition, the upper layer should cover about 1/2 of the lower layer.

2 The redundant of cable tie must be 5-10mm.


4- 4- 5-
A B A 3
3
2
1 Tools

1 Paper knife 2 Diagonal pliers 3

4 5 6
5- 5-C
B Materials

1 Waterproof tape 2 PVC tape

3 Cable tie 4

5 6


线



Page 39
划 SN Task Description Operator Duration
Standard Installation of the
线OptiX RTN 900
辅划 1.7.1B Grounding Point of the IF Cable BCD 50minutes(Total)
线


板 Procedure
助1
Point
板 1 The place about 1 m away from the IF interface of the ODU

板 2 The place about 1 m away from the point where the cable is routed onto the wiring frame

The place about 0.5 m to 1 m away from the cable entry (when the outdoor wiring frame is longer
3
than 20 meters)

4 The middle point of the cable (when the cable on tower is longer than 60 meters)

Point 4

Note

Point 4
2 Point
3
Tools

1 2 3

4 5 6

Materials

1 2
3 4
5 6


线



Page 40
划 SN Task Description Operator Duration
Standard Installation of the
线OptiX RTN 900 Perform the Grounding of the IF
辅 1.7.1C BCD 50minutes(Total)
Cable
助 Procedure
1- 1-
A B
板 1-C
板 1
Determine where the grounding clip is installed on the IF cable. Strip the sheath off the IF cable
according to the length of the grounding clip;

38mm 2 Fit the grounding clip where the sheath is stripped off on the IF cable, and then tighten the screws.

Wrap the connector with three layers of PVC tape 3–5 cm below the connector and toward the
3
direction of the ODU;
Wrap the connector with three layers of waterproof tape 3–5 cm below the connector. The
4 wrapping directions of the three layers are from down to up, from up to down, and from down to up
respectively;
Wrap the connector with three layers of PVC tape 3–5 cm below the connector. The wrapping
5 directions of the three layers are from down to up, from up to down, and from down to up
2- 2- 2- respectively ;
A B C
6 Wrap the PVC tape on both ends tightly with cable tie. Then, cut off the redundant bundling tape;

7 Fix another end of grounding clamp to grounding bar and bind the grounding cable to the tower.

Note
The angle between the ground cable connected to the grounding clip and the IF cable canSNt
1
exceed 15 degrees. Route the ground cable along the route of the IF cable.
1 2 3
2 Strip the sheath off the IF cable according to the length of the grounding clip.

3 Do n't strip any shielding layer of the IF cable.

1 4
23 1
2 1
3 2 5
3
Tools

4 5- 5- 1 Paper knife 2 Cross screwdriver 3


A B
4 5 6

Materials

1 Ground cable of the IF cable 2 PVC tape


Down
3 Waterproof tape 4 Cable tie (black)

5 6


线



板 Page 41
划 SN Task Description Operator Duration
Standard Installation of the
线OptiX RTN 900
辅 1.7.1D Route and bind IF cable BCD 50minutes(Total)

1
助 Procedure
2

板 1 Bind IF cable to the cable ladder every 1m with cable ties.

2 Use Plastic Coated Metal tie wrap to fix IF cable on Pole and feeder clamp when installing on Tower

Fix the IF cable to the cable ladder along the route of the IF cable. Pass the IF cable through the
3
feeder window into the room;
Make the coiled cable a waterproof curve in front of the feeder window, and fix the cable to the
4
cable ladder .

3- 3- 7
A B
Note

Tools

3-C 4 1 File 2 3

4 5 6

Materials

1 PVC tape 2 Waterproof tape

3 Plastic coated Metal Tie wrap 4 Feeder clamp

5 6

Page 42
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Route and Install 75-Ohm E1
1.7.2A A 15 minutes
Cables

Procedure
Connect the E1 cables to the E1 interface on the tributary board. Then, tighten the screws to fix the
1
cables ;
1- 1- 1-C 2 Route the E1 cables from the equipment side to the DDF, and tighten it to the Rack by cable tie;
A B
Cut the E1 cables to a proper length and mark the cables for the transmit and receive directions (such as
3
Tx/Rx) ;

4 Systemize E1 cable in the cabinet

Note
1-D 2 3
1

Tools
4
1 Cross screwdriver 2 Marking pen 3 Punchdown tool

4 Paper knife 5 Diagonal pliers 6

Materials

1 75-ohm E1 cable 2 PVC insulation tape

3 Cable tie(white) 4

5 6

Page 43
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.7.2C 75-ohm E1 cable Connections

Procedure

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 44
SN Task Description Operator Duration
Standard Installation of the OptiX RTN 900 Route the IF
划 1.8.1A
Cable(indoor)
BD 10 minutes
线 1-
1- 辅B Procedure
A
助 1
Lay the IF cable from the feeder window to the position connected to IF jumper
板 along the cable labber;
Cut off the IF cable of an appropriate length to make the IF cable connector
板 2 according to (Assemble IF terminal (outdoor)), after make the IF terminal test it
as follow 1.8.4B;
3 Systemize IF cables inside cabinet

2 6
3

Note

1 1m of IF cable should be looped to be redundancy.

2 Loop Diameter shouldn't be less than 40cm diameter

Tools

1 Paper knife 2 Diagonal pliers 3 Solid Wrench

4 File 4 6

Materials

1 IF cable 2 IF cable connector (RG8-U Connector)

3 Cable tie(White) 4

Page 45
划 SN Task Description Operator Duration
Standard Installation
线 of the OptiX RTN 900 Route the IF
辅划 1.8.1B
Cable(indoor)
BD 10 minutes
线

辅 Procedure
1 板

板 Set the multimeter to R/Ω. Connect one needle of the multimeter to the external
ODU Side
板 IDU Side 1 conductor of the IF cable connector. Connect the other needle to the core of the
IF cable connector
板 The test value of
resistance should be 2 In the short circuit, the test value of resistance should be infinitude.
infinitude.
3 In the open circuit , the test value of resistance should be very small.

Open circuit. 6

2 Note

ODU Side IDU Side 1

The test value of 2


resistance should be
very small.
3
R/Ω
R/ Ω

Tools

1 Multimeter 2 3

Short circuit 3 4 6

Materials

1 2

3 4

5 6


线
辅 Page 46



划 SN Task Description Operator Duration
Standard Installation
线 of the OptiX RTN 900 Route the IF
辅划 1.8.1C
Cable(indoor)
BD 10 minutes
线

板划
辅 Procedure
1- 1- 1-
A B 线

板 C Connect the IF jumper to the IF interface on the IF board, and then fix the IF
1

板 jumper;

板 2
Route the IF jumper from the equipment side to a proper location on the cable
板 ladder, Interconnect the IF jumper with the IF cable properly .

4
1-D 1- 2-
E A 5

Note

2- 2- 2-D 3
B C
4

Tools

1 Wrench 2 3

4 5 6
2-
F
Materials

1 IF jumper cable 2

3 4

5 6

Page 47
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 1.8.2A
fix Labels according to
(B)C 30minutes(Total)
the customer request.

1 Procedure
2

1 Antenna Labels

2 ODU and IF Cable Labels

3 follow the label template sent and approved by Vodafone team

Note
3-A 3-B Generally, affix the label 2 cm away from the connector. To avoid bending the
1 cable or making the installation of other cables inconvenient, you can affix the
label to other places.

Tools

1 Marking pen 2 3

4 5 6

Materials

1 Label paper 2

3 4

5 6

Page 48
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.8.2B fix the indoor Label (B)C 30 minutes(Total)

1 2- Procedure
A
1 IF Cable Labels

2 Power Cable Labels

3 E1 and DDF Labels

Note
2-
2- C Generally, affix the label 2 cm away from the connector. To avoid bending the
B 1 cable or making the installation of other cables inconvenient, you can affix the
label to other places.

Tools
3-
B 1 Marking pen 2 3
3-
A
4 5 6

Materials

1 Label paper 2

3 4

5 6

Page 49
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Route and Install
1.8.3 Power Cables of the A 40 minutes
IDU
Procedure
1- 1- 1- 1 Connect the power cables to the power interface on the RTN.
A B C

2 Route the power cables from the equipment side to the DC Box;

Cut the power cables to a proper length. Then, make the core end terminal (of
3
the blue cable) and the ring terminal (of the black cable);

Remove the bolt of the working ground busbar. Put the ring terminal of the black
4
cable around the bolt, and then tighten the bolt ;
Confirm that the capacity of the air breaker is equal to 20A for RTN 950 and it is
10A for RTN 910. Loosen the bolt that fixes the power cable on the air breaker,
5
1-D 1- 2 insert the core end terminal vertically into the jack of the terminal block, and then
E tighten the bolt.
Note
When connecting the power cable and ground cable to the DCDB, you should
1
insulate the tools with insulation tape to avoid short circuit.
After the power cables are installed, pull the power cables to ensure that they
2
are fixed.

4
3 GND Power Cable 4 5

Tools

1 Cross screwdriver 2 Solid wrench 3 Crimping pliers

4 Paper knife 5 Wire cutters 6 Diagonal pliers

Materials
-48V Power Cable
1 Power cable 2 One ring terminal and one core end terminal

3 Bundling tape 4 PVC insulation tape

5 6

Page 50
SN Task Description Operator Duration
Standard Installation of the OptiX RTN 900
1.9.1 Clear sites D 10 minutes

Procedure

1 Collect the tools and excessive cables on site

2 Clear up the equipment room and the outdoors.


3步
第 Note
6
步 1 No packing boxes or boards are placed at random on the installation field.


2 No cable ties or other sundries are left on the floor or in the cabinets.
3步

6
步 3 Close all cable trays before leaving the site, to protect cables

Tools

1 2 3

4 5 6

Materials

1 2

3 4

Page51
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.9.2A Power On the Equipment A 10 minutes(Total)

Procedure

2 Before powering on the equipment, check the input voltage.Connect negative needle of the multimeter to
1 1 air breaker, connect positive needle of the multimeter to grounding point. Make sure that the input voltage
is within the range allowed by the equipment ;

2 Turn on the air breaker of the power supply ;

3 Turn on the IF Board power switch.

正面 5

Note

If the standard voltage of the input power is –48 V, the tested value of the voltage should range from –
1
38.4 V to -57.6 V.
If the standard voltage of the input power is –60 V, the tested value of the voltage should range from –48
3 2
V to –72 V.

3 The startup time of the equipment is about 3 to 5 minutes.

Tools

1 Multimeter 2 3

4 5 6

Materials

1 2

3 4

5 6

Page52
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Upgrade RTN 900 from
1.10.1A TR5 Version To TR6 (GA) E 90 minutes(Total)
Version
Procedure

1 Ensure that FTP Service is running

2 Copy the software package of RTN910/950 in the root : D:\FTP\Load

3 Click (Device Management -->Search Device)

4 Fill in IP address of GNE that will be upgraded

5 Confirm successful Login

Note
User name:szhw & Password: nesoft
1

Tools

1 Laptop 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 53
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Upgrade RTN 900 from
1.10.1B TR5 Version To TR6 (GA) E 90 minutes(Total)
Version
Procedure

1 From Drop Menu Choose (New task->Package Upgrade Task)

2 Choose Device type, Device Version from Drop Menu

3 uncheck pause operation for (Activate, Commit, Upgrade Post check)

4 Load Software by clicking Configure Package tab

5 Browse Path were package software Exist

Note

Tools

1 2 3

4 5 6

Materials

1 Laptop 2

3 4

5 6

Page 54
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Upgrade RTN 900 from
1.10.1C TR5 Version To TR6 (GA) E 90 minutes(Total)
Version
Procedure

1 Go through Package upgrade confirmation Process Steps

Note

1 username:ftpuser , Home:source of ftp folder (D:\FTP in our example)

Tools

1 laptop 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 55
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Upgrade RTN 900 from
1.10.1D TR5 Version To TR6 (GA) E 90 minutes(Total)
Version
Procedure

1 Start upgrade task

2 the upgrade operation takes around one hour time

3 after task finish, report shows successful upgrade process

Note

Tools

1 Laptop 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 56
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Log
1.10.2A E 15 minutes(Total)
in to the Web LCT

Procedure

Log in to the Web LCT as shown in the figure. In this case, the U2000 V1R1
1
version is considered as an example.
Use a network cable to connect the network port of the computer to the NMS port
2
on the SCC board of the OptiX RTN 900.

Modify the IP address and the subnet mask of the computer. Ensure that the IP
3 address is in the network section of 129.9.0.0, and the subnet mask is 255.255.0.0.
The IP address of 129.9.0.12 can be considered as an example.

Double-click the icon of Web LCT to display the home page of the Web LCT. On
4 the home page, enter the default user admin and password T2000. Then, click
Login to display the NE list.

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 57
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-
1.10.2B Search For the E 15 minutes(Total)
Equipment
Procedure

1 Click NE Search to display the Search NE window.

2 Click End Search to search for NEs.

3 Click Add NE to add the NEs that are searched out to the NE list.

4 Close the Seach NE window.

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 58
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Log
1.10.2C E 15 minutes(Total)
In To the NE

Procedure

Select the NE that you need to log in to, and then click NE Login to display the NE
1
Login window.

2 Enter the default user lct and password password. Then, click OK.

Double-click the NE in the NE list or click NE Explorer to display the NE Explorer


3
window.

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 59
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-
1.10.2D Modify the Name and ID E 15 minutes(Total)
of the NE
Procedure

Choose Configuration > NE Attribute in the Function Tree. Then, the NE


1
Attribute page is displayed.
Choose Configuration > Communication > Communication Parameters in the
2 Function Tree. Then, the Communication parameters settings page is
displayed.
3 Modify the NE name according to the design document, and then click Apply.

Click Modify NE IP. Modify the NE IP according to the design document, and then
4
click Apply.
Click Modify NE ID. Modify the NE ID according to the design document, and then
5
click Apply.

Note

After the NE IP is modified, the PC IP address should be changed to comply with


1
NE new IP Address

2 The extended ID for RTN will be 7

3 After the NE ID is modified, you should log in to the NE again.

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 60
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Add
1.10.2E E 15 minutes(Total)
Logical Boards

Procedure

1 On the Slot Layout page, click Add Logical Boards to add all the logical boards.

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 61
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-
1.10.2F Configure IF and RF E 15 minutes(Total)
Parameters

Procedure

Choose Configuration > Link Configuration in the Function Tree. Then, the Link
1
Configuration page is displayed.

2 Choose IF/ODU Configuration. Click the IF board or ODU to be configured.

① ② 3
Set Work Mode , Channel space , Manually specified configuration ,and
Specified Max E1 capacity according to the design document, and click Apply.
Set the Tx Frequency, T/R Spacing, Tx Power , Power to be received and
4
Actual TX status according to the design document, and click Apply.
③ ④
5

Note
① If two IF boards form a 1+1 protection group, you only need to configure the
1 working IF board and the ODU. That is, there is no need to configure the protection
① IF board.
2

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 62
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the IF 1+1
1.10.2G E 15 minutes(Total)
configuration

Procedure

Choose Configuration > Link Configuration in the Function Tree. Then, choose
1
the IF 1+1 protection tab
Click New, and set the IF 1+1 protection group according to the design document.
2
Then, click OK.

Note

For RTN 950 specific slots can be configured with 1+1 protection group (slot 1 &
1
Slot 2) (slot3 & slot 5) (slot 4 & slot 6)

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 63
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-
1.10.2F Configure Cross- E 15 minutes(Total)
Connections

Procedure

Choose Configuration > Cross-Connection Configuration in the Function Tree.


1
① Then, the Cross-Connection Configuration page is displayed.
Click New, and configure cross-connections according to the design document.
2
Then, click OK.

Note
① If two IF boards form a 1+1 protection group, you only need to configure the
1 working IF board and the ODU. That is, there is no need to configure the protection
IF board.
2

① 3

② Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 64
SN Task Description Operator Duration
Configure the Data-
Enable the 15-
Standard Installation of OptiX RTN 900 Minute/24-Hour
1.10.2H E 15 minutes(Total)
Performance Monitoring
Function of the
Equipment
Procedure

Choose Configuration > NE Time Synchronization in the Function Tree. Then,


1
the NE Time Synchronization page is displayed.
Right-click the NE that needs to be synchronized with the NM time. Then, click
2
Synchronize with NM Time.
Click Performance > NE Performance Monitor Time in the Function Tree, and
3
then choose the NE to be monitored.

4 Check 15-Minute or 24-House, and click Apply.

Note

When you are synchronizing the NE time, make sure that the system time of the
1
computer connected to the equipment is the local time.

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 65
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.10.2I E 15 minutes(Total)

Procedure

To clear the alarms of the unused ports we should disable these ports as shown in
1 the snapshot.
Take care :- Only Unused ports have to be disabled

2 We have to reset the performance after the link alignment , It can be done as
shown in the snapshot
on the IFU2 Click Performance > Reset board performance register in the
3 Function Tree, and then press reset.

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 66
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Set
1.10.2I the Extended ECC to the E 15 minutes(Total)
Automatic Mode

Procedure

Use network cables to connect the EHT port and the EHT-HUB port of the SCC
1
board on multiple sets of equipment, as shown in the figure.
Choose Configuration > Communication > ECC Management. Then the ECC
2
Management page is displayed.

3 Double-click ECC Extended Mode. Then, select Automatic and click Apply.

Note

When there are two to four sets of the OptiX RTN equipment at one station, you
1
need to connect all the equipment through the cabinet-connecting ports.
When multiple sets of equipment are connected through the EHT and EHT-HUB
2
ports on the SCC board, you should avoid any loop of the equipment.

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 67
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Set
1.10J DCC manangement to E 10 minutes(Total)
HWECC

Procedure

Choose Configuration > Communication > DCC Management. Then the DCC
1
Management page is displayed.

2 Double-click protocol Typeof the IFU2 board. Then, select HWECC.

Choose Configuration > Communication > DCN Management > Port setting
3
Tab. Then the DCN Management page is displayed.

4 Choose IF and then select Disbale

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 68
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Set
1.10K E 10 minutes(Total)
default gateway

Procedure

Choose Configuration > Communication > Communication parameters. Then


1
the communication parameter settings page is displayed.

2 Set the IP & Extended ID & Gateway IP and subnet mask as the design file.

For
3 the Gateway RTN , set the Gateway IP = IP of NE directed to the hub site (ex. TN or SIAE)

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 69
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Set
1.10L E 10 minutes(Total)
ospf parameter

Procedure

Choose Configuration > Communication > IP Protocol Management. Then the


1
OSPF parameter settings page is displayed.

2 Set the parameter as the design file.

3 OSPF area = 0.0.0.X (will be mentioned in the Design sheet)


DCC Hello =10 ,DCC Dead time =40 ,DCC retransmission =5 ,DCC delay =1
LAN Hello =10 ,LAN Dead time =40 ,LAN retransmission =5 ,LAN delay =1
4 (Default Values)

Note

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 70
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Configure the Data-Set
1.10M E 10 minutes(Total)
lan ospf interface

Procedure

Run command: :cm-set-ospf-interface:lan,enable


1
Check command: :cm-get-ospf-interface
(If tottally stubby) Run command:- :cm-set-ospf-stub:enable
(If no stub) Run command:- :cm-set-ospf-stub:disable
2
Check command:- :cm-get-ospf-stub

3 Run command:- :dbms-copy-all:drdb,fdb


This command is important to instant save configuration into RTN memory ,Note that the configuration is
automatically saved to memory after 30 min of applying the new configuration (if power down during this 30
4 min ,the new conf will be lost)

To verify on the connectivity:-


5 Run command: :Ping:10.253.116.27 (IP of Huawei NMS server)
the result should be 0% packet loss

Note

Tools

1 Navigator Program 2 3

4 5 6

Materials

1 2

5 6

Page 71
SN Task Description Operator Duration
Standard Installation of OptiX RTN900 Align the Antennas—
1.11A AC(BD) 90 minutes(Total)
Preparations

Procedure
1
1 Follow the microwave antenna alignment principle;

Determine the voltage values of the design receive level of the ODU, according
2 to the ODU RSI-Vbnc Curve and the microwave design document. (The ODU
RSI-Vbnc Curve is delivered with the ODU).
For 1+1 HSB Protection, turn off the standby ODU's power before alignment
3
antenna. After finish alignment, turn on the standby ODU and check the RSL.

Note
For 1+1 HSB Protection, turn off the standby ODU's power before alignment
1
antenna. After finish alignment, turn on the standby ODU and check the RSL.
When alignment, you can force the 1+1HSB working at main ODU also,and after
2
2- 2- finished the alignment, you should clear the force switch.
5A B
3
4.5

4
Choose area 4
3.5

3
Tools
RSSI Voltage(V)

2.5
1 2 3
2

1.5 4 5 6
1
Materials
0.5

0
-100 -90 -80 -70 -60 -50 -40 -30 -20 -10
1 Design document 2 PC
RSL(dBm)

3 4

5 6

Page 72
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Align the Antennas—
1.11B AC(BD) 90 minutes(Total)
Connect multimeter

Procedure
1 2-
A Set the maximum voltage that the multimeter can detect to DC 20 V, fix the
20V
1 multimeter to the tower for easy observation. Then, observe the voltage value of
the receive level when you align the antennas;
Remove the waterproof cap of the ODU RSSI port, connect the BNC connector
2
to the ODU RSSI port;

Connect the multimeter to the wire which connect the BNC connector,then
3
protect the wire by PVC tape.

2- 3- Note
B A
1

Tools

3- 3-C 1 Multimeter 2 PVC tape 3


B
4 5 6

Materials

1 2

3 4

5 6

Page 73
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 1.11C
Align the Antennas—
AC(BD) 90 minutes(Total)
Horizontal Adjustment

1 Horizontal Fasten the antenna Procedure


Adjustme at remote site
nt
1 Fasten the antenna at the remote site, align the antenna at local site ;

2 On the local antenna, loosen the nuts that fix the clamps on the stand ;

Adjust the antenna in a wide range horizontally. In this manner, the antenna is
aligned roughly.During the rough adjustment, about three peak signals can be
3
scanned. Then, perform the fine tune around each peak signal and compare the
maximum receive level at each time of fine tune;

4 Immediately lock all involved loosened parts tightly after adjustment completed.
Site A Site B
5
2 3
Note

Notice the view from multimeter when align the antenna, looking for the
1
maximum view.

180°
Nuts that fix 2 Tighten the four nuts on the clamps in a diagonal sequence.
the clamps
3

Tools

4 1 Multimeter 2 Solid wrench 3

4 5 6

Materials

1 2

3 4

5 6

Page 74
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Align the Antennas—
1.11D AC(BD) 90 minutes(Total)
Horizontal Adjustment
Procedure
Loosen the bolts on the stand base, the bolt and the two adjustment nuts on the
1 2- 1
level adjustment screw;
A
Perform the fine tune around each peak signal and compare the maximum
2
receive level at each time of fine tune;
When the maximum receive level is achieved,tighten the bolts on the stand base
3
and the nuts on the level adjustment screw to fix the antenna.
Bolt on
Level the 4
adjustme stand
nt screw base 5

Note
When aligning the antennas, you should fix one antenna and adjust the other
1
antenna.
Tighten all the bolts on the antenna. When tightening the bolts, you should
2
observe the receive level and ensure the maximum receive level.

2- 1- 3
B A3
4

Tools

1 Multimeter 2 Solid wrench 3


30°

4 5 6

Materials

1 2

3 4

Page 75
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Align the Antennas—
1.11E AC(BD) 90 minutes(Total)
Vertical Adjustment

1 Vertical Fasten the antenna Procedure


Adjustme at remote site
nt 1 Fasten the antenna at the remote site, vertically align the antenna at local site ;

2 Loosen the bolts that connect the antenna and the stand;

Rotate the elevation adjustment bolt with a wrench. Then, perform the fine tune
3 around the receive level peak in every vertical direction, and compare the
maximum receive level at each time of fine tune;

When the maximum receive level is achieved, tighten the elevation adjustment
4
bolt to fix the antenna .

Site A 5
Site B
2 Bolts that 3- Note
connect the A
antenna When aligning the antennas, you should fix one antenna and adjust the other
1
and the antenna.
stand Tighten all the bolts on the antenna. When tightening the bolts, you should
2
observe the receive level and ensure the maximum receive level.

4
Elevation
adjustmen
t bolt Tools

4 1 Multimeter 2 Solid wrench 3


3-
B
4 5 6

Materials
30°

1 2

3 4

5 6

Page 76
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Align the Antennas—
1.11F remote site and AC(BD) 90 minutes(Total)
alignment repeated

1 2 Procedure

Follow the step 1.11A, 1.11B, 1.11C,1.11D,1.11E to align the antenna at the site
1
B to find the maximum value of voltage by multimeter;

2 Adjust the local and romte antenna repeatedly;


Alignment When the receive levels of the local ODU and remote ODU reach the design
Repeated 3
values, the alignment is over.

4
Site A Site B Site A Site B
5

Note
3- 3-
B When aligning the antennas, you should fix one antenna and adjust the other
A 1
antenna.

2 Tighten all the bolts on the antenna.

Tools

1 Multimeter 2 Solid wrench 3

4 5 6

Materials

1 2

3 4

Page 77
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Align the Antennas—
1.11G remote site and AC(BD) 90 minutes(Total)
alignment repeated
Procedure

Choose Configuration > Link Configuration in the Function Tree. Then, the
1
Link Configuration page is displayed.

Choose IF/ODU Configuration. Check the RSL that should within the plan
2
designed receive value range according to the customer’s requirement.

Note

Tools

1 Laptop 2 Weblct 3

4 5 6

Materials

1 2

3 4

Page 78
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.12.1A E1 Software Loopback E 30 minutes

Procedure
In the Function Tree, click the tributary board where the loopback is to be
1
performed.
Choose Configuration > PDH Interface in the Function Tree. Then, the PDH
2
Interface page is displayed.
Select the E1 signal to be looped back. Then, double-click Tributary Loopback
3
and select Inloop or Outloop.

4 Click Apply.

Front 5 Check Also using hardware loop.


view
Note

1 E1 inloop indicates that the E1 signal is looped back toward the backplane.

2 E1 outloop indicates that the E1 signal is looped back against the backplane.

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 79
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900
1.12.1B Test the E1 Services E 30 minutes

Procedure

1 Perform the hardware loopback of the E1 signal on the DDF.

Click the tributary board to be tested, and choose Configuration > PRBS Test in
2
the Function Tree. Then, the PRBS Test page is displayed.
Select the E1 signal to be looped back. Double-click Direction and select
3
Tributary. Then, set the test duration to 15 minutes.

4 Click Start to Test to start the PRBS test.

Note

The test directions of the PRBS test function as follows. In the tributary direction,
the bit errors from the local DDF to the equipment can be tested. When the
1
remote E1 signal is looped back and the cross direction is selected at the local
end, the bit errors from the radio link to the local tributary board can be tested.

Tools

1 2 3

4 5 6

Materials

1 2

3 4

5 6

Page 80
SN Task Description Operator Duration
Standard Installation of OptiX RTN 900 Check the hardware
1.12.2 AB 30 minutes
installation.

Procedure
1 According to the Checklist to check the hardware installation .

Take photos on key installation points of the base station according to


2
related requirements in the engineering documents.

3 Review the site quality report.

Note
Be sure to collect all the required data on site. This facilitates you to
1 compose the equipment installation completion report.
Send SMS To Vodafone to access the site (Vodafone SMS
2 Number:5011) use the agreed Format

Tools

1 2 3

4 5 6

Materials

1 Camera 2

3 4

5 6

Page81