Professional Documents
Culture Documents
Store Name: Project Title: Quotation For Electrical General Requirements
Store Name: Project Title: Quotation For Electrical General Requirements
STORE NAME :
PROJECT TITLE : QUOTATION FOR ELECTRICAL
GENERAL REQUIREMENTS
Mobilization Cost Direct Cost:
* Transportation
SCOPE OF WORKS:
PHOTOS OF STORE CONCERNS LABORS & MATERIALS COST
Includes the following work;
INSTALLATION OF OUTLET 2 GANG AT BED ROOM / WIRE CHECKING
INSTALLATION OF NEW CONNECTIONS AT BACK HOUSE
INSTALLATION OF 3 GANG OUTLET / SWITCH BOX AT KITCHEN WALL
COMMISSIONING/CHECKING OF WIRING AT CR
Materials:
NO OF DAY/S:
NO OF PERSONNEL/S:
OTHER CHARGES
Indirect Cost:
* Board and Lodging
PREPARED BY:
DATE :
QUOTATION # : SY-0000
1
1
1
1
PHP 5,000.00
1
2
GENERAL REQUIREMENTS
Mobilization Cost Direct Cost:
* Transportation
SCOPE OF WORKS:
PHOTOS OF STORE CONCERNS LABORS & MATERIALS COST
Includes the following work;
INSTALLATION OF DOOR KNOB
REPAIR DOOR PORTION FOR DOOR KNOB
REPAIR PORTION OF BED
PAINTING OF DIVIDER
REPAINTING OF DOOR
INSTALLATION OF TABLE AT ROOM
Materials:
NO OF DAY/S:
NO OF PERSONNEL/S:
OTHER CHARGES
Indirect Cost:
* Board and Lodging
PREPARED BY:
DATE :
QUOTATION # : SY-0000
2
1
1
1
1
1
PHP 8,000.00
3
2