L&T Construction

Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION PKR KSR/MK

CONTENTS

S No Description Page No

1 Introduction & Design Basis 3

2 Load Calculations 4

3 Design of Purlin 8

4 Design of Base Plate 14

5 Sizing, Grouping & Design of Column Footings 17


L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

SCOPE OF DESIGN REPORT
This document contains design of Sludge Storage Area. The structure consist of a
shed with GRP roof sheeting supported on purlins. The truss is supported on RCC
columns with isolated footings.

Design Method : STAAD model has been prepared for the Structure & Truss.
Footing have been designed using standard excel sheets.

DESIGN CONSTANTS
Grade of Concrete = 25 N/mm2
Grade of Steel = 500 N/mm2
Clear Cover to Reinforcement
Roof Beams : 30 mm
Other Beams : 40 mm
Foundations : 50 mm
Column : 40 mm
Seismic Zone III
Zone Factor 0.16
Importance Factor (As Per Table 6 of IS:1893 (Part 1)-2002 1.0

Page 3
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

LOAD CALCULATIONS

Page 4
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
SLUDGE STORAGE YARD - DESIGN
TITLE: CALCULATION PKR KSR/MK

LOADS ON FRAME STRUCTURE


Height of Brickwork above Plinth Beam = 2.0 m
Density of Brickwork = 22 KN/m3
Thickness of Brickwork including Plaster Both Sode = 0.262 m
LINE LOADING
Load of the Brickwork on Plinth Beam = 2x22x0.262 11.53 kN/m
WIND LOAD ON FRAME STRUCTURE
Design Wind Pressure = 1.33 kN/m2
Width of Column = 0.30 m
Wind Load on the Columns = 0.40 kN/m
LOADS ON TRUSS
Truss Spacing 3.17 m
Roof Angle (θ) = 18.0
spacing of Purlin = 1.245 m
Cantilever Projection = 0.30 m
Initial Spacing of Purlin = 0.115 m

DEAD LOAD
Self Weight of Sheeting with Fixtures = 0.15 kN/m2
Self Weight of Sheeting with Fixtures per m run = 0.15x1.245 0.187 kN/m
Self Weight of Purlin (ISMC 100) = 0.096 kN/m

Total Load of Sheeting and Fixtures = 0.283 kN/m

Load Distribution at Node 10 = (0.283x3.167)x2 1.79 kN (↓)


Load Distribution at Other Nodes = 0.283x3.167 0.90 m
LIVE LOAD
Live load on roof truss (For non accessible) = 0.75 kN/m2
Reduced LL on Purlin = MAX((0.75-(0.02x(18-10))),0.4) 0.59 kN/m2

Total Live load for design of truss as per


2/3x0.59 0.39 kN/m2
clause 4.5.1 IS 875-II

Load Distribution at Nodes


At Node 1 and 43 0.39x3.167x(1.245/2+0.3) 1.14 kN (↓)
At Node 37, 38, 39, 44, 45 & 46 0.39x3.167x1.245 1.54 kN (↓)
At Node 10 (0.39x3.167x(1.245/2+0.115))x2 1.82 kN (↓)

Page 5
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
SLUDGE STORAGE YARD - DESIGN
TITLE: CALCULATION PKR KSR/MK

CALCULATION OF WIND LOAD


Basic Wind Speed (Vb) = 47 m/sec
k1 = 1.00
For Structure Class A & Assumed Terain Category 2, k2 = 1.00
k3 = 1.00
Design Wind Speed (Vz) = 47x1x1x1 47.00 m/sec
Design Wind Pressure (Pz) = (0.6x47x47)/1000 1.33 kN/m2
From Table 8 of IS: 875 (Part 3) - 1987
For Roof Angle (θ) = 18.00 degree
Max Cp = (Table 8 IS:875 (Part 3)-1987 0.52
Min Cp = (Table 8 IS:875 (Part 3)-1987 -1.26
Considering solidity ratio (Φ) = 1, (Considering worst case)

-1.670 -1.670

0.689 0.689

For maximum Cp value (Positive):


Wind Pressure (Pw) = 0.689 0.689 kN/m2

Force Components: P x Cosα ↑


At Node 1 and 43 0.689*3.167*(1.245/2+0.3)*COS0.314 1.92 kN
At Node 37, 38, 39, 44, 45 & 46 0.689*3.167*1.245*COS0.314 2.58 kN
At Node 10 (0.689*3.167*(1.245/2+0.115)*COS0.314)*2 3.06 kN

Force Components: P x Sinα ←


At Node 1 and 43 0.689*3.167*(1.245/2+0.3)*SIN0.314 0.62 kN
At Node 37, 38, 39, 44, 45 & 46 0.689*3.167*1.245*SIN0.314 0.84 kN

For minimum Cp value (negative):


Wind Pressure (Pw) = 1.670 kN/m2
Page 6
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
SLUDGE STORAGE YARD - DESIGN
TITLE: CALCULATION PKR KSR/MK

Force Components: P x Cosα ↑


At Node 1 and 43 1.67*3.167*(1.245/2+0.3)*COS0.314 4.64 kN
At Node 37, 38, 39, 44, 45 & 46 1.67*3.167*1.245*COS0.314 6.26 kN
At Node 10 (1.67*3.167*(1.245/2+0.115)*COS0.314)*2 7.42 kN

Force Components: P x Sinα ←


At Node 1 and 43 1.67*3.167*(1.245/2+0.3)*SIN0.314 1.51 kN
At Node 37, 38, 39, 44, 45 & 46 1.67*3.167*1.245*SIN0.314 2.03 kN

Wind Load on Columns


Total Area of Shed = 4.8x9.5 45.60 m2
Total Area of Columns Exposed to Wind (0.4x4.8)x4 7.68 m2
Solidity Ratio = 7.68/45.6 0.17
Cf for column = (Refer table 28 of IS 875 part 3) 1.3
Exposed area of column per meter length = Ae = diameter x 1 0.400 m
Wind Load =Cf x pd x Ae 0.508 kN/m

Page 7
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

DESIGN OF PURLIN

Page 8
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

Design of Purlin
Spacing Between truss = 3.17 m
Spacing of Purlin = 1.25 m
Roof Angle (Degree) (θ) = 18.00
Roof Angle (Radian) (θ) = 0.314

DEAD LOAD
Self Weight = ISMC 75 68.00 N/m
Sheeting self weight with fixtures = ((68+(0.1x68))/1000) 0.075 kN/m
Load on Purlin = 15.00 Kg/m2
0.15 kN/m2
0.15x3.167 0.48 kN/m
Total dead load on Purlin = 0.475+0.075 0.55 kN/m

Load Normal to Raft = 0.55*COS0.314 0.52 kN/m


Load along Raft = 0.55*SIN0.314 0.170 kN/m

LIVE LOAD
Live load on roof truss = 0.75 kN/m2
Reduced Load on Purlin as per IS 875 0.75-0.02x(18-10) 0.59 kN/m2
Live load on Purlin = 0.59x1.245 0.73 kN/m

Load normal to rafter = 0.59*COS0.314 0.56 kN/m


Load along rafter = 0.59*SIN0.314 0.18 kN/m

WIND LOAD
Basic Wind Speed (Vb) = 47 m/sec
k1 = 1.00
k2 = 0.98
k3 = 1.00
Design Wind Speed (Vz) = 47x1x0.98x1 46.06 m/sec
Design Wind Pressure(Pz) = (0.6x46.06x46.06/1000) 1.27 kN/m2

Page 9
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

Length of Building (L)= 9.50 m


Width of Building (W)= 9.50 m
Height of Building (H)= 5.50 m

H/W = 5.5/9.5 0.58


L/W = 9.5/9.5 1.00

From Table: 8, IS 875 (Part 3) - 1987


For Free Standing Double Sloped Roofs
For Roof Angle (θ) = 18.00 degree
Max Cp = 0.5
Min Cp = -1.25

- 1.26 - 1.26

0.5 0.5

Hence Min Cp governs the design :


Pw = Cp x Pz = -1.25x1.273 -1.59 kN/m2
Wind Load on Purlin = PwXSpacing -1.591x1.245 -1.98 kN/m

LOAD COMBINATION

DL + LL (Vertical) = 0.523+0.561 1.08 kN/m


DL + LL (Horizontal) = 0.17+0.182 0.35 kN/m

DL + WL (Vertical) = 0.523-1.981 -1.46 kN/m


DL + WL (Horizontal) = 0.17 0.170 kN/m

DL + LL + WL (Vertical) = 0.523+0.561-1.981 -0.897 kN/m


DL + LL + WL (Horizontal) = 0.17+0.182 0.352 kN/m

CALCULATION FOR DESIGN MOMENTS

Considering it as three span continuou


Mmax =
10

Due to Dead Load :


Page 10
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

(a) Normal Direction


Mx = 0.523x3.167x3.167/10 0.525 KN-m
(b) Lateral Direction :
Sag rods of 12mm dia is introduced at mid span
My = 0.17x(3.167/2)x(3.167/2)/10 0.043 KN-m
Due to Live Load :
(a) Normal Direction
Mx = 0.561x3.167x3.167/10 0.563 KN-m
(b) Lateral Direction :
Sag rods of 12mm dia is introduced at mid span
My = 0.182x(3.167/2)x(3.167/2)/10 0.046 KN-m
Due to Wind Load :
(a) Normal Direction
Mx = -1.981x3.167x3.167/10 -2.0 KN-m

MOMENT CALCULATION FOR LOAD COMBINATION (NORMAL)


DL + LL = 0.525+0.563 1.087 KN-m
DL + WL = 0.525-1.987 -1.462 KN-m
DL + LL + WL = 0.525+0.563-1.987 -0.899 KN-m
MOMENT CALCULATION FOR LOAD COMBINATION (NORMAL)
DL + LL = 0.043+0.046 0.088 KN-m

Choose Channel Section ISMC 75


Area = 867 mm2 D= 75
lx = 760000 mm4 T = 7.3
ly = 126000 mm4 t = 4.4
Zx = 20300 mm3 Rxx = 29.6
Zy = 4700 mm3 Ryy = 12.1
Allowable bending stress (σcbc)(For DL+LL)= 165 N/mm2
Allowable bending stress
Unsupported Length (Lxx) = 3167 mm
Unsupported Length (Lyy) = 1584 mm
Effective Length (Lexx) = 1x3167 3167 mm
Effective Length (Lexx) = 1x1583.5 1584 mm

λx = 3167/29.6 106.993

λy = 1583.5/12.1 130.868

From Table 6.1 B of IS 800 σcbc all = 126.43


Page 11
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

CALCULATION OF BENDING STRESS


DL + LL
σ(bcx cal)= (((0.525x10^6)/20300)+((0.563x10^6)/20300)) 53.569

σ(bcy cal)= (((0.043x10^6)/4700)+((0.046x10^6)/4700)) 18.794

Check for Interaction


    ((53.569/165)+(18.794/165)) 0.439
   
SAFE
DL + WL
σ(bcx cal)= (((0.525x10^6)/20300)+(-1.987x10^6)/20300) -72.03

σ(bcy cal)= (0.043x10^6)/4700 9.07

Check for Interaction


    ((25.845/165)+(-97.877/126.43)) -0.62
   
   
9.067/165 0.055
 
Interaction = -0.56

SAFE
DL + LL + WL
σ(bcx cal)=
((0.525x10^6)/20300)+((0.563x10^6)/20300)+((-1.987x10^6)/20300) -44.31

σ(bcy cal)=

((0.043x10^6)/4700)+((0.046x10^6)/4700) 18.79

Check for Interaction


     
     

(25.845/165)+(27.724/165)+(-97.877/126.43) -0.45

   
   
(9.067/165)+(9.727/165) 0.11

Interaction = -0.34

SAFE
CHECK FOR DEFLECTION
Max allowable deflection = (3.167x1000)/250 13 mm

Maximum deflection in the Purlin

Page 12
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

DL + LL = ((1.087x10^6)x(3.167x1000)x(3.167x1000))/(10x2x10^5x760000) 7.18 mm

OK
DL + WL = ((-1.462x10^6)x(3.167x1000)x(3.167x1000))/(10x2x10^5x760000)-9.65 mm

OK
DL + LL + WL = ((-0.899x10^6)x(3.167x1000)x(3.167x1000))/(10x2x10^5x760000)-5.94 mm

OK

Page 13
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

DESIGN OF BASE PLATE

Page 14
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

DESIGN FOR BASE PLATE FOR ROOF TRUSS:


Design Data:
Maximum Vertical Load = 35.851 kN
Minimum Vertical Load = 31.634 kN
Resultant Horizontal Shear = 1.0 kN

Length of Plate = L= 350 mm


Width of Plate = B= 250 mm
Design Strength of the Plate = 250 N/mm2
Grade of Concrete = 25 KN/m3
Diameter of Bolts = 16 mm
Grade of Bolts = 4.6
Number of Bolts = N= 4
Tensile Area of Bolts = 156.50 mm2
Shear strength of Bolt = 115.40 N/mm2
Tensile Strength of Bolt = 272.50 N/mm2

350 mm

250 mm

12 -mm thick plate 4 -16 mm dia bolts

Bearing Pressure
Case (I) Loading
Base Pressure W = (35.851x1000/(350x250)) 0.41 N/mm2
Permissible Bearing Pressure = 0.45x25 11.3 N/mm2

Permissible Bearing Pressure > Actual Base Pressure OK


Bolt Capacity under tension
Force in bolt due to direct tension, Ft = 31.634/4 7.91 kN
Tensile Capacity of Single Bolt, Pnom = 0.8x272.5x156.5/1000 34.12 kN
> Actual Force on Bolt OK

Page 15
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

DESIGNED   CHECKED
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

Check for Horizontal Shear


Shear capacity of one bolt, Ps = 115.4x156.5/1000 18.1 kN
Actual Horizontal Shear per Bolt, Fs = 1/4 0.25 kN

Check for Combined shear and tension 0.2


OK
1.4

Check for thickness of Base Plate


Maximum Base Pressure, W = 0.41 N/mm2
Largest Perpendicular distance from the edge of eff portion of face of column,

c= 88 mm
Minimum thickness of the plate, (4.13.2.2), t = 88xSQRT(3x0.41/250) 6.17 mm
Thickness Provided = 12 mm
Check for Edge Distance
Minimum edge distance = (Table 29) 1.25x18 22.5 mm
Edge Distance Provided = 88 mm
Provided > Minimum edge distance OK

Page 16
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 24-Jan-18

DESIGNED CHECKED SHEET


TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
PKR KSR/MK

SIZING, GROUPING & DESIGN OF 
COLUMN FOOTINGS

Page 17
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION PKR KSR/MK

REACTION FORCES FROM STAAD FOR BASIC LOAD CASES

449 1 EQXP 1.19 -7.95 0.01 0.01 1.80 19.49

2 EQZP -0.04 17.52 -8.41 -16.43 -0.37 -0.08

3 EQXN -1.19 7.95 -0.01 -0.01 -1.80 -19.49

4 EQZN 0.04 -17.52 8.41 16.43 0.37 0.08

5 DEAD LOADS 15.74 79.27 -5.90 -2.52 -0.11 -6.09

6 LIVE LOADS -0.02 6.66 0.00 0.00 0.00 0.01

452 1 EQXP 1.19 7.95 -0.01 -0.01 1.80 19.49

2 EQZP 0.05 17.44 -8.42 -16.44 0.51 -0.13

3 EQXN -1.19 -7.95 0.01 0.01 -1.80 -19.49

4 EQZN -0.05 -17.44 8.42 16.44 -0.51 0.13

5 DEAD LOADS -15.74 79.27 -5.90 -2.52 0.11 6.09

6 LIVE LOADS 0.02 6.66 0.00 0.00 0.00 -0.01

455 1 EQXP -9.64 -0.02 -0.01 -0.01 1.54 47.27

2 EQZP 0.13 -3.01 -14.55 -19.27 0.10 -0.20

3 EQXN 9.64 0.02 0.01 0.01 -1.54 -47.27

4 EQZN -0.13 3.01 14.55 19.27 -0.10 0.20

5 DEAD LOADS -0.13 73.35 0.72 0.42 -0.04 1.58

6 LIVE LOADS 0.00 6.67 0.00 0.00 0.00 0.00

457 1 EQXP -9.64 0.02 0.01 0.01 1.54 47.27

2 EQZP -0.14 -3.01 -14.56 -19.28 -0.01 0.13

3 EQXN 9.64 -0.02 -0.01 -0.01 -1.54 -47.27

4 EQZN 0.14 3.01 14.56 19.28 0.01 -0.13

5 DEAD LOADS 0.13 73.35 0.72 0.42 0.04 -1.58

6 LIVE LOADS 0.00 6.67 0.00 0.00 0.00 0.00

461 1 EQXP -9.60 -0.03 -0.01 -0.02 -1.83 46.65

2 EQZP -0.11 3.03 -14.56 -19.28 0.10 0.16

3 EQXN 9.60 0.03 0.01 0.02 1.83 -46.65

4 EQZN 0.11 -3.03 14.56 19.28 -0.10 -0.16

5 DEAD LOADS -0.13 73.35 -0.72 -0.42 0.04 1.58

Page 18
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION PKR KSR/MK

REACTION FORCES FROM STAAD FOR BASIC LOAD CASES

6 LIVE LOADS 0.00 6.67 0.00 0.00 0.00 0.00

463 1 EQXP -9.60 0.03 0.01 0.02 -1.83 46.65

2 EQZP 0.12 3.03 -14.58 -19.29 -0.01 -0.11

3 EQXN 9.60 -0.03 -0.01 -0.02 1.83 -46.65

4 EQZN -0.12 -3.03 14.58 19.29 0.01 0.11

5 DEAD LOADS 0.13 73.35 -0.72 -0.42 -0.04 -1.58

6 LIVE LOADS 0.00 6.67 0.00 0.00 0.00 0.00

467 1 EQXP -1.37 -8.44 -0.03 -0.03 -2.08 19.86

2 EQZP 0.03 -17.53 -8.31 -16.40 -0.31 0.08

3 EQXN 1.37 8.44 0.03 0.03 2.08 -19.86

4 EQZN -0.03 17.53 8.31 16.40 0.31 -0.08

5 DEAD LOADS 15.76 79.28 5.90 2.52 0.11 -6.09

6 LIVE LOADS -0.02 6.66 0.00 0.00 0.00 0.01

469 1 EQXP -1.37 8.44 0.03 0.03 -2.08 19.86

2 EQZP -0.07 -17.45 -8.33 -16.41 0.44 0.13

3 EQXN 1.37 -8.44 -0.03 -0.03 2.08 -19.86

4 EQZN 0.07 17.45 8.33 16.41 -0.44 -0.13

5 DEAD LOADS -15.76 79.28 5.90 2.52 -0.11 6.09

6 LIVE LOADS 0.02 6.66 0.00 0.00 0.00 -0.01

473 1 EQXP -30.75 0.00 0.00 0.00 -0.37 22.56

2 EQZP 0.15 0.07 -1.74 -4.68 -0.01 -0.11

3 EQXN 30.75 0.00 0.00 0.00 0.37 -22.56

4 EQZN -0.15 -0.07 1.74 4.68 0.01 0.11

5 DEAD LOADS 0.00 75.80 0.00 0.47 0.00 0.00

6 LIVE LOADS 0.00 0.02 0.00 0.00 0.00 0.00

475 1 EQXP -25.88 0.00 0.00 0.00 0.41 20.05

2 EQZP -0.13 -0.07 -2.01 -5.63 0.00 0.10

3 EQXN 25.88 0.00 0.00 0.00 -0.41 -20.05

4 EQZN 0.13 0.07 2.01 5.63 0.00 -0.10

5 DEAD LOADS 0.00 81.74 0.00 -0.47 0.00 0.00

6 LIVE LOADS 0.00 0.02 0.00 0.00 0.00 0.00


Page 19
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE


PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION PKR KSR/MK

REACTION FORCES FROM STAAD FOR BASIC LOAD CASES

Page 20
L&T Construction
Water & Effluent Treatment
JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE
PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
DESIGNED CHECKED
PKR KSR/MK

SIZING OF FOOTINGS & CHECK FOR BEARING PRESSURE
Increase for EQ / Wind = 25%
Pump House
STAAD OUTPUT GROUP MAX PR MIN PR Permissible SIZE
NODE LOAD CASE FY MX MZ kN / sqm kN / sqm m
449 DL+LL 85.931 ‐2.519 ‐6.079 F2 49.43 24.70 79.40 1.7 x 1.5
DL+LL+EQXP 77.983 ‐2.51 13.408 F2 56.13 11.15 99.25 1.7 x 1.5
DL+LL+EQZP 103.446 ‐18.951 ‐6.158 F2 82.87 6.37 99.25 1.7 x 1.5
DL+LL+EQXN 93.879 ‐2.529 ‐25.566 F2 79.85 1.14 99.25 1.7 x 1.5
DL+LL+EQZN 68.416 13.913 ‐6.000 F2 59.64 ‐0.62 99.25 1.7 x 1.5

452 DL+LL 85.931 ‐2.519 6.079 F2 49.43 24.70 79.40 1.7 x 1.5


DL+LL+EQXP 93.879 ‐2.53 25.566 F2 79.85 1.14 99.25 1.7 x 1.5
DL+LL+EQZP 103.370 ‐18.963 5.948 F2 82.57 6.61 99.25 1.7 x 1.5
DL+LL+EQXN 77.983 ‐2.509 ‐13.408 F2 56.13 11.15 99.25 1.7 x 1.5
DL+LL+EQZN 68.492 13.925 6.210 F2 59.98 ‐0.89 99.25 1.7 x 1.5

455 DL+LL 80.017 0.423 1.574 F3 27.72 24.06 79.40 2.0 x 1.7


DL+LL+EQXP 79.994 0.42 48.846 F3 69.41 ‐17.65 99.25 2.0 x 1.7
DL+LL+EQZP 77.004 ‐18.848 1.374 F3 45.69 4.14 99.25 2.0 x 1.7
DL+LL+EQXN 80.040 0.430 ‐45.698 F3 66.66 ‐14.87 99.25 2.0 x 1.7
DL+LL+EQZN 83.030 19.694 1.774 F3 48.87 4.85 99.25 2.0 x 1.7

457 DL+LL 80.017 0.423 ‐1.574 F3 27.72 24.06 79.40 2.0 x 1.7


DL+LL+EQXP 80.040 0.43 45.698 F3 66.66 ‐14.87 99.25 2.0 x 1.7
DL+LL+EQZP 77.003 ‐18.859 ‐1.445 F3 45.76 4.06 99.25 2.0 x 1.7
DL+LL+EQXN 79.994 0.416 ‐48.846 F3 69.41 ‐17.65 99.25 2.0 x 1.7
DL+LL+EQZN 83.031 19.705 ‐1.703 F3 48.82 4.91 99.25 2.0 x 1.7

461 DL+LL 80.017 ‐0.42 1.573 F3 27.71 24.06 79.40 2.0 x 1.7


DL+LL+EQXP 79.992 ‐0.438 48.220 F3 68.88 ‐17.12 99.25 2.0 x 1.7
DL+LL+EQZP 83.042 ‐19.703 1.737 F3 48.85 4.88 99.25 2.0 x 1.7
DL+LL+EQXN 80.042 ‐0.408 ‐45.074 F3 66.09 ‐14.30 99.25 2.0 x 1.7
DL+LL+EQZN 76.992 18.857 1.409 F3 45.73 4.09 99.25 2.0 x 1.7

463 DL+LL 80.017 ‐0.423 ‐1.573 F3 27.71 24.06 79.40 2.0 x 1.7


DL+LL+EQXP 80.042 ‐0.408 45.074 F3 66.09 ‐14.30 99.25 2.0 x 1.7
DL+LL+EQZP 83.043 ‐19.715 ‐1.678 F3 48.81 4.92 99.25 2.0 x 1.7
DL+LL+EQXN 79.992 ‐0.438 ‐48.220 F3 68.88 ‐17.12 99.25 2.0 x 1.7
DL+LL+EQZN 76.991 18.87 ‐1.468 F3 45.79 4.03 99.25 2.0 x 1.7

467 DL+LL 85.941 2.519 ‐6.086 F2 49.45 24.70 79.40 1.7 x 1.5


DL+LL+EQXP 77.506 2.487 13.776 F2 56.40 10.47 99.25 1.7 x 1.5
DL+LL+EQZP 68.412 ‐13.876 ‐6.004 F2 59.59 ‐0.57 99.25 1.7 x 1.5
DL+LL+EQXN 94.376 2.55 ‐25.948 F2 80.63 0.80 99.25 1.7 x 1.5
DL+LL+EQZN 103.470 18.914 ‐6.168 F2 82.84 6.43 99.25 1.7 x 1.5

Page 21
L&T Construction
Water & Effluent Treatment
JHUNJHUNU WATER SUPPLY AND SEWERAGE DOCUMENT NO. DATE
PROJECT: WORKS LE160978-C-WW-SW-DC-3220 31-Jan-18
TITLE: SLUDGE STORAGE YARD - DESIGN CALCULATION
DESIGNED CHECKED
PKR KSR/MK

SIZING OF FOOTINGS & CHECK FOR BEARING PRESSURE
Increase for EQ / Wind = 25%
Pump House
STAAD OUTPUT GROUP MAX PR MIN PR Permissible SIZE
NODE LOAD CASE FY MX MZ kN / sqm kN / sqm m
469 DL+LL 85.941 2.519 6.086 F2 49.45 24.70 79.40 1.7 x 1.5
DL+LL+EQXP 94.376 2.551 25.948 F2 80.63 0.80 99.25 1.7 x 1.5
DL+LL+EQZP 68.492 ‐13.89 6.217 F2 59.94 ‐0.84 99.25 1.7 x 1.5
DL+LL+EQXN 77.506 2.487 ‐13.776 F2 56.40 10.47 99.25 1.7 x 1.5
DL+LL+EQZN 103.390 18.926 5.955 F2 82.53 6.67 99.25 1.7 x 1.5

473 DL+LL 75.824 0.471 0.000 F1 37.91 36.23 75.00 1.5 x 1.5


DL+LL+EQXP 75.824 0.47 22.564 F1 78.02 ‐3.88 93.75 1.5 x 1.5
DL+LL+EQZP 75.897 ‐4.206 ‐0.113 F1 44.78 29.43 93.75 1.5 x 1.5
DL+LL+EQXN 75.824 0.471 ‐22.564 F1 78.02 ‐3.88 93.75 1.5 x 1.5
DL+LL+EQZN 75.751 5.148 0.113 F1 46.39 27.68 93.75 1.5 x 1.5

475 DL+LL 81.768 ‐0.47 0.000 F1 40.81 39.14 75.00 1.5 x 1.5


DL+LL+EQXP 81.768 ‐0.471 20.053 F1 76.46 3.49 93.75 1.5 x 1.5
DL+LL+EQZP 81.695 ‐6.103 0.101 F1 50.97 28.91 93.75 1.5 x 1.5
DL+LL+EQXN 81.768 ‐0.471 ‐20.053 F1 76.46 3.49 93.75 1.5 x 1.5
DL+LL+EQZN 81.841 5.161 ‐0.101 F1 49.37 30.66 93.75 1.5 x 1.5

Page 22
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

DESIGN OF FOOTINGS F1

Characteristic cube strength of Concrete, fck 25 N/mm2


Yield Strength of Steel, fy 500 N/mm2
Net Safe Bearing Capacity 00.0 KN/m2
Clear Cover for Footing 50 mm

Column Size of Footing Assumed


Ftg
X-X Z-Z X-X Z-Z D d
F1 300 300 1.50 1.50 300 300

Area of Footing, A 1.5x1.5 2.25 m2


Section modulus of footing about X-axis, Zx 1.5x1.5^2/6 0.56 m3
Section modulus of footing about Z-axis, Zz 1.5x1.5^2/6 0.56 m3
Maximum Soil Pressure = P/A + Mx/Zx + Mz/Zz

DESIGN FORCES

DL+LL+ DL+LL+ DL+LL+ DL+LL+


DL+LL
EQXP EQZP EQXN EQZP
Load Factor 1.5 1.5 1.5 1.5 1.5
Factored Pu 122.7 122.7 122.5 122.7 122.8
Factored Mux 0.7 0.7 9.2 0.7 7.7
Factored Muz 0.0 30.1 0.2 30.1 0.2
Design Pressure 55.8 109.2 71.0 109.2 68.6

Design Soil Pressure, Peff 109.2 KN/m2


CALCULATION FOR BOTTOM STEEL IN X-X DIRECTION
Mu about Z-Z = 109.2x((1.5-300/1000)/2)^2/2 19.7 kN-m/m
Eff Depth of Footing Near Column Face = 300-50-10/2 245 mm
Eff Depth of Footing Near Edge = 300-50-10/2 245 mm
Mean depth parallel to Z-Z =
((300+200)x245+((1.5x1000-300-200)x(245+245)/2))/(1.5x1000) 245.00 mm
Mu / bd2 = 0.327 % of reinf required = 0.076

Ast Required = 0.076x1000x245/100 186 mm2/m


Provide Reinforcement = 10-200 Ast Provided = 393 mm2/m

CALCULATION FOR BOTTOM STEEL IN Z-Z DIRECTION

Page 23
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

Mu about X-X = 109.2x((1.5-300/1000)/2)^2/2 19.7 kN-m/m


Eff Depth of Footing Near Column Face = 300-50-10-0.5x10 235 mm
Eff Depth of Footing Near Edge = 300-50-10-0.5x10 235 mm
Mean depth parallel to X-X =
((300+200)x235+((1.5x1000-300-200)x(235+235)/2))/(1.5x1000) 235.00 mm
Mu / bd2 = 0.356 % of reinf required = 0.083

Ast Required = 0.083x1000x235/100 195 mm2/m


Provide Reinforcement = 10-200 Ast Provided = 393 mm2/m

CHECK FOR ONE WAY SHEAR


One way shear at effective depth from col face ║to Z-Z
Effective depth at critical section (dc) =
245-(245-100)x0/(0.5x(1.5x1000-300-200)) 245.00 mm
Distance of critical section from edge = ((1.5x1000-300)/2-245)/1000 0.355 m
Width of footing at this section at top of footing =
1.5-0.355x(1.5-300/1000)/((1.5-300/1000)/2) 0.790 m
Shear force = 1.5x109.2x0.355 58.1 KN
Percentage of reinf at critical section = 393x100/1000/245 0.160
Shear Stress=
(58.1x1000/(((245x0.79x1000)+((1.5x1000-0.79x1000)x(245+245)/2)))) 0.16 N/mm2
Permissible Shear Stress= 0.30 N/mm2
OK
One way shear at effective depth from col face ║to X-X
Effective depth at critical section (dc) =
235-(235-100)x0/(0.5x(1.5x1000-300-200)) 235.00 mm
Distance of critical sec. from edge = ((1.5x1000-300)/2-235)/1000 0.365 m
Width of footing at this section at top of footing =
1.5-0.365x(1.5-300/1000)/((1.5-300/1000)/2) 0.770 m
Shear force = 1.5x109.2x0.365 59.8 KN
Percentage of reinf at critical section = 393x100/1000/235 0.167

Page 24
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

Shear Stress=
(59.8x1000/(((235x0.77x1000)+((1.5x1000-0.77x1000)x(235+235)/2)))) 0.17 N/mm2
Permissible Shear Stress= 0.31 N/mm2
OK
CHECK FOR TWO WAY SHEAR

Effective depth at critical section (dc) =

235-(235x0.5-100)x0/(0.5x(1.5x1000-300-200)) 235.0 mm

Width at critical section along X-X = 300+235 535.0 mm

Width at critical section along Z-Z= 300+235 535.0 mm

Shear Force= 109.2x(1.5x1.5-(535/1000)x(535/1000)) 214.4 KN

Length of critical section = 2x(535+535) 2140.0 mm

Area of the critical section, mm2 = 2140x235 502900

Shear Stress = 214.4x1000/502900 0.43 N/mm2

Ks= 1.00

Allowable shear stress = 1*0.25*SQRT25 1.25 N/mm2

OK

Page 25
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

DESIGN OF FOOTINGS F2

Characteristic cube strength of Concrete, fck 25 N/mm2


Yield Strength of Steel, fy 500 N/mm2
Net Safe Bearing Capacity 00.0 KN/m2
Clear Cover for Footing 50 mm

Column Size of Footing Assumed


Ftg
X-X Z-Z X-X Z-Z D d
F2 450 300 1.70 1.50 300 300

Area of Footing, A 1.7x1.5 2.55 m2


Section modulus of footing about X-axis, Zx 1.7x1.5^2/6 0.64 m3
Section modulus of footing about Z-axis, Zz 1.5x1.7^2/6 0.72 m3
Maximum Soil Pressure = P/A + Mx/Zx + Mz/Zz

DESIGN FORCES

DL+LL+ DL+LL+ DL+LL+ DL+LL+


DL+LL
EQXP EQZP EQXN EQZP
Load Factor 1.5 1.5 1.5 1.5 1.5
Factored Pu 128.9 116.3 102.6 141.6 155.2
Factored Mux 3.8 3.7 20.8 3.8 28.4
Factored Muz 9.1 20.7 9.0 38.9 9.3
Design Pressure 69.1 80.0 85.4 115.4 118.2

Design Soil Pressure, Peff 118.2 KN/m2


CALCULATION FOR BOTTOM STEEL IN X-X DIRECTION
Mu about Z-Z = 118.2x((1.7-450/1000)/2)^2/2 23.1 kN-m/m
Eff Depth of Footing Near Column Face = 300-50-10/2 245 mm
Eff Depth of Footing Near Edge = 300-50-10/2 245 mm
Mean depth parallel to Z-Z =
((300+200)x245+((1.5x1000-300-200)x(245+245)/2))/(1.5x1000) 245.00 mm
Mu / bd2 = 0.385 % of reinf required = 0.09

Ast Required = 0.09x1000x245/100 221 mm2/m


Provide Reinforcement = 10-175 Ast Provided = 449 mm2/m

CALCULATION FOR BOTTOM STEEL IN Z-Z DIRECTION

Page 26
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

Mu about X-X = 118.2x((1.5-300/1000)/2)^2/2 21.3 kN-m/m


Eff Depth of Footing Near Column Face = 300-50-10-0.5x10 235 mm
Eff Depth of Footing Near Edge = 300-50-10-0.5x10 235 mm
Mean depth parallel to X-X =
((450+200)x235+((1.7x1000-450-200)x(235+235)/2))/(1.7x1000) 235.00 mm
Mu / bd2 = 0.385 % of reinf required = 0.09

Ast Required = 0.09x1000x235/100 212 mm2/m


Provide Reinforcement = 10-175 Ast Provided = 449 mm2/m

CHECK FOR ONE WAY SHEAR


One way shear at effective depth from col face ║to Z-Z
Effective depth at critical section (dc) =
245-(245-100)x0/(0.5x(1.7x1000-450-200)) 245.00 mm
Distance of critical section from edge = ((1.7x1000-450)/2-245)/1000 0.380 m
Width of footing at this section at top of footing =
1.5-0.38x(1.5-300/1000)/((1.7-450/1000)/2) 0.770 m
Shear force = 1.5x118.2x0.38 67.4 KN
Percentage of reinf at critical section = 449x100/1000/245 0.183
Shear Stress=
(67.4x1000/(((245x0.77x1000)+((1.5x1000-0.77x1000)x(245+245)/2)))) 0.18 N/mm2
Permissible Shear Stress= 0.32 N/mm2
OK
One way shear at effective depth from col face ║to X-X
Effective depth at critical section (dc) =
235-(235-100)x0/(0.5x(1.5x1000-300-200)) 235.00 mm
Distance of critical sec. from edge = ((1.5x1000-300)/2-235)/1000 0.365 m
Width of footing at this section at top of footing =
1.7-0.365x(1.7-450/1000)/((1.5-300/1000)/2) 0.940 m
Shear force = 1.5x118.2x0.365 64.7 KN
Percentage of reinf at critical section = 449x100/1000/235 0.191

Page 27
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

Shear Stress=
(64.7x1000/(((235x0.94x1000)+((1.7x1000-0.94x1000)x(235+235)/2)))) 0.16 N/mm2
Permissible Shear Stress= 0.32 N/mm2
OK
CHECK FOR TWO WAY SHEAR

Effective depth at critical section (dc) =

235-(235x0.5-100)x0/(0.5x(1.5x1000-300-200)) 235.0 mm

Width at critical section along X-X = 450+235 685.0 mm

Width at critical section along Z-Z= 300+235 535.0 mm

Shear Force= 118.2x(1.7x1.5-(685/1000)x(535/1000)) 258.1 KN

Length of critical section = 2x(685+535) 2440.0 mm

Area of the critical section, mm2 = 2440x235 573400

Shear Stress = 258.1x1000/573400 0.45 N/mm2

Ks= 1.00

Allowable shear stress = 1*0.25*SQRT25 1.25 N/mm2

OK

Page 28
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

DESIGN OF FOOTINGS F3

Characteristic cube strength of Concrete, fck 25 N/mm2


Yield Strength of Steel, fy 500 N/mm2
Net Safe Bearing Capacity 00.0 KN/m2
Clear Cover for Footing 50 mm

Column Size of Footing Assumed


Ftg
X-X Z-Z X-X Z-Z D d
F3 450 300 2.00 1.70 300 300

Area of Footing, A 2x1.7 3.40 m2


Section modulus of footing about X-axis, Zx 2x1.7^2/6 0.96 m3
Section modulus of footing about Z-axis, Zz 1.7x2^2/6 1.13 m3
Maximum Soil Pressure = P/A + Mx/Zx + Mz/Zz

DESIGN FORCES

DL+LL+ DL+LL+ DL+LL+ DL+LL+


DL+LL
EQXP EQZP EQXN EQZP
Load Factor 1.5 1.5 1.5 1.5 1.5
Factored Pu 120.0 120.1 115.5 120.0 124.5
Factored Mux 0.6 0.6 28.3 0.6 29.6
Factored Muz 2.4 68.5 2.2 73.3 2.6
Design Pressure 38.0 96.5 65.2 100.6 69.6

Design Soil Pressure, Peff 100.6 KN/m2


CALCULATION FOR BOTTOM STEEL IN X-X DIRECTION
Mu about Z-Z = 100.6x((2-450/1000)/2)^2/2 30.2 kN-m/m
Eff Depth of Footing Near Column Face = 300-50-10/2 245 mm
Eff Depth of Footing Near Edge = 300-50-10/2 245 mm
Mean depth parallel to Z-Z =
((300+200)x245+((1.7x1000-300-200)x(245+245)/2))/(1.7x1000) 245.00 mm
Mu / bd2 = 0.503 % of reinf required = 0.119

Ast Required = 0.119x1000x245/100 292 mm2/m


Provide Reinforcement = 10-175 Ast Provided = 449 mm2/m

CALCULATION FOR BOTTOM STEEL IN Z-Z DIRECTION

Page 29
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

Mu about X-X = 100.6x((1.7-300/1000)/2)^2/2 24.6 kN-m/m


Eff Depth of Footing Near Column Face = 300-50-10-0.5x10 235 mm
Eff Depth of Footing Near Edge = 300-50-10-0.5x10 235 mm
Mean depth parallel to X-X =
((450+200)x235+((2x1000-450-200)x(235+235)/2))/(2x1000) 235.00 mm
Mu / bd2 = 0.446 % of reinf required = 0.105

Ast Required = 0.105x1000x235/100 247 mm2/m


Provide Reinforcement = 10-175 Ast Provided = 449 mm2/m

CHECK FOR ONE WAY SHEAR


One way shear at effective depth from col face ║to Z-Z
Effective depth at critical section (dc) =
245-(245-100)x0/(0.5x(2x1000-450-200)) 245.00 mm
Distance of critical section from edge = ((2x1000-450)/2-245)/1000 0.530 m
Width of footing at this section at top of footing =
1.7-0.53x(1.7-300/1000)/((2-450/1000)/2) 0.743 m
Shear force = 1.7x100.6x0.53 90.6 KN
Percentage of reinf at critical section = 449x100/1000/245 0.183
Shear Stress=
(90.6x1000/(((245x0.743x1000)+((1.7x1000-0.743x1000)x(245+245)/2)))) 0.22 N/mm2
Permissible Shear Stress= 0.32 N/mm2
OK
One way shear at effective depth from col face ║to X-X
Effective depth at critical section (dc) =
235-(235-100)x0/(0.5x(1.7x1000-300-200)) 235.00 mm
Distance of critical sec. from edge = ((1.7x1000-300)/2-235)/1000 0.465 m
Width of footing at this section at top of footing =
2-0.465x(2-450/1000)/((1.7-300/1000)/2) 0.970 m
Shear force = 1.7x100.6x0.465 79.5 KN
Percentage of reinf at critical section = 449x100/1000/235 0.191

Page 30
L&T Construction
Water & Effluent Treatment

JHUNJHUNU WATER SUPPLY AND DOCUMENT NO. DATE


PROJECT: SEWERAGE WORKS
LE160978-C-WW-SW-DC-3220 31-Jan-18

SLUDGE STORAGE YARD - DESIGN DESIGNED CHECKED


TITLE: CALCULATION
PKR KSR/MK

Shear Stress=
(79.5x1000/(((235x0.97x1000)+((2x1000-0.97x1000)x(235+235)/2)))) 0.17 N/mm2
Permissible Shear Stress= 0.32 N/mm2
OK
CHECK FOR TWO WAY SHEAR

Effective depth at critical section (dc) =

235-(235x0.5-100)x0/(0.5x(1.7x1000-300-200)) 235.0 mm

Width at critical section along X-X = 450+235 685.0 mm

Width at critical section along Z-Z= 300+235 535.0 mm

Shear Force= 100.6x(2x1.7-(685/1000)x(535/1000)) 305.2 KN

Length of critical section = 2x(685+535) 2440.0 mm

Area of the critical section, mm2 = 2440x235 573400

Shear Stress = 305.2x1000/573400 0.53 N/mm2

Ks= 1.00

Allowable shear stress = 1*0.25*SQRT25 1.25 N/mm2

OK

Page 31