Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Alexander Niño

ID: 641071

Passive Voice

The tunnel of the line was delivered this week, after a century of construction, now
Colombians will be able to cross this road corridor, since it is considered a
megaproject and there has been a long delay because the politicians have stolen

our money.

You might also like