KEGIATAN PEMBERI TUGAS

PENINGKATAN JALAN DALAM KOTA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BACK UP DATA
KONSULTAN SUPERVISI
Tahun Anggaran : 2019
CV. VORVO CONSULTANT

Kontraktor : CV. DANIEL FAHRILLAH


Pekerjaan : PENINGKATAN JALAN BIAWAN GANG 2 - JELAWAT GANG 6,8 DAN 9 KEC.SAMARINDA ILIR
Lokasi : KOTA SAMARINDA

Item Pekerjaan : Perkerasan Aspal (Aspal Sheet)

SKET PEKERJAAN

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

1
0 + 000 3.40
25.00 2.85 71.25
0 + 025 2.30
20.30 2.42 49.13
0 + 045.3 2.54
1.40 2.58 3.61
0 + 046.7 2.62

SUB TOTAL VOLUME


VOLUME LAPANGAN 123.99 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

2
0 + 000 3.62
25.00 3.02 75.38
0 + 025 2.41
25.00 2.66 66.50
0 + 050 2.91
8.90 2.12 18.87
0 + 058.9 1.33

SUB TOTAL VOLUME


VOLUME LAPANGAN 160.74 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

3
0 + 000 2.15
18.50 2.40 44.40
0 + 018.5 2.65
6.50 2.23 14.50
0 + 025 1.81
21.20 1.92 40.60
0 + 046.2 2.02

SUB TOTAL VOLUME


VOLUME LAPANGAN 99.49 M2
Panjang Lebar L Rata2 Volume
Ruas Station / Posisi Ket.
(m) (m) (m) M2

4
0 + 000 4.60
20.40 3.95 80.58
0 + 020.4 3.30
6.70 3.03 20.27
0 + 027.1 2.75
22.90 2.55 58.40
0 + 050 2.35
20.50 2.36 48.28
0 + 070.5 2.36
23.60 2.18 51.45
0 + 094.1 2.00
SUB TOTAL VOLUME
VOLUME LAPANGAN 258.97 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

5
0 + 000 3.30
25.00 2.20 54.88
0 + 025 1.09
4.00 1.22 4.86
0 + 029 1.34
21.00 1.50 31.50
0 + 050 1.66
10.80 1.83 19.76
0 + 60.8 2.00
3.80 1.78 6.76
0 + 64.6 1.56
7.10 1.76 12.46
0 + 071.7 1.95
3.30 2.08 6.85
0 + 075 2.20
13.00 2.40 31.20
0 + 088 2.60
1.00 2.53 2.53
0 + 089 2.46
10.20 2.20 22.39
0 + 099.2 1.93
SUB TOTAL VOLUME
VOLUME LAPANGAN 193.19 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

6
0 + 000 4.00
23.70 3.70 87.69
0 + 023.7 3.40
1.30 3.03 3.94
0 + 025 2.66
25.00 2.43 60.75
0 + 050 2.20
18.00 2.85 51.30
0 + 068 3.50
1.00 2.75 2.75
0 + 069 2.00
6.00 1.93 11.58
0 + 075 1.86
9.40 2.21 20.77
0 + 084.4 2.56
0.60 2.61 1.56
0 + 085 2.65
15.00 2.01 30.15
0 + 100 1.37
19.00 1.25 23.75
0 + 119 1.13
3.40 1.65 5.61
0 + 122.4 2.17
6.10 2.00 12.20
0 + 128.5 1.83
SUB TOTAL VOLUME
VOLUME LAPANGAN 312.06 M2
Panjang Lebar L Rata2 Volume
Ruas Station / Posisi Ket.
(m) (m) (m) M2

7
0 + 000 4.00
25.00 3.70 92.50
0 + 025 3.40
23.00 3.03 69.69
0 + 048 2.66
2.00 2.43 4.86
0 + 050 2.20
25.00 2.85 71.25
0 + 075 3.50
25.00 2.75 68.75
0 + 100 2.00
25.00 1.93 48.25
0 + 125 1.86
25.00 2.21 55.25
0 + 150 2.56
8.70 2.61 22.66
0 + 158.7 2.65
SUB TOTAL VOLUME
VOLUME LAPANGAN 433.21 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

8
0 + 000 1.50
10.00 1.57 15.70
0 + 010 1.64
SUB TOTAL VOLUME
VOLUME LAPANGAN 15.70 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

9
0 + 000 2.46
25.00 2.28 57.00
0 + 025 2.10
5.00 2.27 11.33
0 + 030 2.43
20.00 2.31 46.10
0 + 050 2.18
25.00 2.09 52.25
0 + 075 2.00
4.40 2.22 9.77
0 + 079.4 2.44
0.60 1.78 1.06
0 + 080 1.11
6.70 1.71 11.42
0 + 086.7 2.30
SUB TOTAL VOLUME
VOLUME LAPANGAN 188.93 M2
Panjang Lebar L Rata2 Volume
Ruas Station / Posisi Ket.
(m) (m) (m) M2

10
0 + 000 3.30
25.00 2.81 70.25
0 + 025 2.32
14.90 2.27 33.75
0 + 039.9 2.21
10.10 2.36 23.79
0 + 050 2.50
1.00 2.72 2.72
0 + 051 2.94
24.00 2.37 56.88
0 + 075 1.80
25.00 1.90 47.50
0 + 100 2.00
16.00 2.54 40.64
0 + 116 3.08
3.00 2.79 8.37
0 + 119 2.50
9.00 2.58 23.22
0 + 128 2.66
3.00 2.58 7.74
0 + 131 2.50
5.00 2.99 14.95
0 + 136 3.48
14.00 2.87 40.18
0 + 150 2.26
15.50 2.20 34.02
0 + 165.5 2.13
1.30 2.65 3.44
0 + 166.8 3.16
SUB TOTAL VOLUME
VOLUME LAPANGAN 407.45 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

11
0 + 000 3.80
25.00 3.41 85.25
0 + 025 3.02
25.00 3.05 76.25
0 + 050 3.08
25.20 3.24 81.65
0 + 075.2 3.40
24.80 3.23 79.98
0 + 100 3.05
25.00 3.03 75.63
0 + 125 3.00
25.00 3.08 76.88
0 + 150 3.15
25.00 3.10 77.38
0 + 175 3.04
25.00 3.08 77.00
0 + 200 3.12
25.00 3.05 76.25
0 + 225 2.98
25.00 3.03 75.75
0 + 250 3.08
25.00 3.07 76.63
0 + 275 3.01
18.20 3.86 70.25
0 + 293.2 4.71
SUB TOTAL VOLUME
VOLUME LAPANGAN 928.88 M2
Panjang Lebar L Rata2 Volume
Ruas Station / Posisi Ket.
(m) (m) (m) M2

12
0 + 000 2.44
25.00 2.37 59.25
0 + 025 2.30
25.00 2.38 59.38
0 + 050 2.45
25.00 2.58 64.38
0 + 075 2.70
25.00 2.83 70.63
0 + 100 2.95
25.00 2.47 61.63
0 + 125 1.98
4.50 1.99 8.96
0 + 129.5 2.00
2.90 2.35 6.82
0 + 132.4 2.70
SUB TOTAL VOLUME
VOLUME LAPANGAN 331.02 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

13
0 + 000 3.53
25.00 3.26 81.38
0 + 025 2.98
10.10 3.06 30.86
0 + 035.1 3.13
SUB TOTAL VOLUME
VOLUME LAPANGAN 112.23 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

14
0 + 000 3.13
2.00 3.85 7.70
0 + 002 4.57
22.90 3.80 87.02
0 + 024.9 3.03
SUB TOTAL VOLUME
VOLUME LAPANGAN 94.72 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

15
0 + 000 2.67
25.00 2.67 66.75
0 + 025 2.67
25.00 2.69 67.25
0 + 050 2.71
5.20 2.76 14.33
0 + 055.2 2.80
5.60 2.73 15.29
0 + 060.8 2.66
12.00 2.45 29.40
0 + 072.8 2.24
SUB TOTAL VOLUME
VOLUME LAPANGAN 193.01 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

16
0 + 000 3.10
25.90 3.11 80.55
0 + 025.9 3.12
SUB TOTAL VOLUME
VOLUME LAPANGAN 80.55 M2
Panjang Lebar L Rata2 Volume
Ruas Station / Posisi Ket.
(m) (m) (m) M2

17
0 + 000 3.88
25.00 3.07 76.75
0 + 025 2.26
5.30 2.52 13.36
0 + 030.3 2.78
19.70 2.69 52.89
0 + 050 2.59
14.50 3.01 43.65
0 + 064.5 3.43
5.00 3.98 19.88
0 + 069.5 4.52
5.50 3.73 20.49
0 + 075 2.93
14.20 3.12 44.23
0 + 089.2 3.30
10.80 3.13 33.80
0 + 100 2.96
25.00 3.00 75.00
0 + 125 3.04
8.90 4.25 37.78
0 + 133.9 5.45

VOLUME LAPANGAN 417.83 M2

Panjang Lebar L Rata2 Volume


Ruas Station / Posisi Ket.
(m) (m) (m) M2

18
0 + 000 2.56
25.00 2.61 65.25
0 + 025 2.66
25.00 2.62 65.50
0 + 050 2.58
25.00 2.66 66.38
0 + 075 2.73
24.47 2.92 71.33
0 + 99.47 3.10

SUB TOTAL VOLUME


VOLUME LAPANGAN 268.45 M2
Panjang Volume
Ruas Station / Posisi Ket.
(m) M2

1 0 + 000 S/D 46.7


0 + 000 46.70 123.99

2 0 + 000 S/D 58.90


0 + 000 58.90 160.74

3 0 + 000 S/D 46.20


0 + 000 46.20 99.49

4 0 + 000 S/D 94.10


0 + 000 94.10 258.97

5 0 + 000 S/D 99.20


0 + 000 99.20 193.19

6 0 + 000 S/D 128.50


0 + 000 128.50 312.06

7 0 + 000 S/D 158.70


0 + 000 158.70 433.21

8 0 + 000 S/D 10.00


0 + 000 10.00 15.70

9 0 + 000 S/D 86.70


0 + 000 86.70 188.93

10 0 + 000 S/D 166.80


0 + 000 166.80 407.45

11 0 + 000 S/D 293.20


0 + 000 293.20 928.88

12 0 + 000 S/D 132.40


0 + 000 132.40 331.02

13 0 + 000 S/D 35.10


0 + 000 35.10 112.23

14 0 + 000 S/D 24.90


0 + 000 24.90 94.72

15 0 + 000 S/D 72.80


0 + 000 72.80 193.01

16 0 + 000 S/D 25.90


0 + 000 25.90 80.55

17 0 + 000 S/D 133.90


0 + 000 133.90 417.83

18 0 + 000 S/D 99.47


0 + 000 99.47 268.45
TOTAL VOLUME ASPAL SHEET 4620.42 M2

JUMLAH KESELURUHAN VOLUME LAPANGAN 4620.42 M2