Download as pdf
Download as pdf
You are on page 1of 2
Question 4 ve eons vinminn es cd | i Clay, eBay (AE AS eum 250 0m 00 rare 00 mm 4) Pile spaung < 34d 7 use this gormula = gs WLW LF + EBX CX Ne XWHL Pile spacing = 400 tn + Bis Pile spacing’ < 3d “C=18007 34 + 38809 = I5OO.mm (400) 0 D= tom 1 =@-4+40-9 40.45 +0.a5)m = a3m : 2 ew W* (0.940.258 +0-25m = 4am ee . : Gu = 45 HN/m* = 0-42 tons /fe> C= a = AS Ht = 22S eA/ae 2 2 fac : Froin Figure 1o-lo 7 with qu = 0-42 tons/ee%, A*0-46 F (0.469 (2a.5 KN /m) > BIG KN/m? Ne = 5-14 C from Fig.4-3.,,for p70" for peg Og com 1.4 #2909 Can. g enn 7n? 4 [1-3 % 22-5 NZ % bem x 2-3m] Og 159R 4 uN + 44-2 eH Qa, = 1693-6 en Atowable Hock capacity = J632-G en = 564.2 4a Scanned with CamScanner b> Quiimate = Qgricton + Op G friction © f+ Asurgace f= ac mym* Chom @I A surgace * CdICLI * CMCO.SmIClom> = 15-7 m2 Qgricton = 21-6 unt fm* x 15Fmt © 354.1 EN Quip = CNeAtip = BAS MN/m* xX 4X TXO-25 M7? = Sta KN Guitimate = 334.) unt + 343 EN = 3FB-T KN Qa® 378-7 KN Tusing FS*2) 3 Qa = 126.3 KN Callowable load for an individual piles cn-1m + om=190 Fomn (2-19¢3) + C3-1268D Bw to Ey = 1 = (29-05) Foc37ca) Ey = 00633 Allowable G = ( 126-3*N? C67C0-c03) = 4qa-t KN Callowable load gov pile group? €) Design capacity o¢ the pile group IS chooten as Aaa UN. This is because the smaller capacity betwen (A) and tp is contemplated. Scanned with CamScanner

You might also like