Hotel Monitoring Report (11-25-19)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

HOTEL

DCII LEAK MONITORING REPORT (AS OF 11-25-19)


REPAIRED PASSED RECURRED UNITS WITHOUT LEAKS
6TH 7TH 8TH 9TH 10TH 6TH 7TH 8TH 9TH 10TH 6TH 7TH 8TH 9TH 10TH 6TH 7TH 8TH 9TH 10TH
6001 7002 8003 9003 10004 7002 8003 9004 10004 7002 9004 7008 8003 9005 10004
6002 7003 8007 9004 10005 7008 8007 9005 10005 7009 7012 8007 9006 10005
6009 7004 8008 9005 10069 7009 8064 9006 10069 7010 7062 8064 10069
6065 7008 8009 9006 10071 7010 8069 10071 7011 7065 8069 10071
6069 7009 8064 9007 7011 8070 7066 8070
7010 8066 9069 7012 7068
7011 8068 9072 7062 7069
7012 8069 7065 7070
7062 8070 N/A 7066 N/A N/A N/A
7065 7068
7066 7069
7068 7070
7069
7070
7072
7073
7074
TOTAL UNITS: 42 UNITS TOTAL UNITS: 24 UNITS TOTAL UNITS: 5 UNITS TOTAL UNITS: 19 UNITS

SUMMARY REPORT NOTE:


Total Units with Leaks: 69 Units UNITS 7062,8064,8069,8070 REPAIRED AND WATER TESTED
Total Units Repaired : 42 units UNITS 8066 AND 8068 TO BE SCHEDULED FOR WATER TESTING

Total Units Passed: 24 units


Total Units Recurred Leak: 5 units
Total Units Without leak: 19 units

CHALLENGES: BMU MALFUNCTION (11-25-19) CANNOT TRAVEL FROM SEQUENCE 6 TO SEQUENCE 5


WEATHER

Prepared by: Façade Team


d' consult international, inc.
construction project manager