This report summarizes the results of leak monitoring for hotel rooms on the 6th through 10th floors as of 11-25-19. It found leaks in 69 total units, with 42 units repaired and 24 units passing subsequent water testing. Five units were found to have leaks recur after repair. Nineteen units remained without detected leaks. Challenges included a building management unit malfunction preventing full testing and inclement weather.
This report summarizes the results of leak monitoring for hotel rooms on the 6th through 10th floors as of 11-25-19. It found leaks in 69 total units, with 42 units repaired and 24 units passing subsequent water testing. Five units were found to have leaks recur after repair. Nineteen units remained without detected leaks. Challenges included a building management unit malfunction preventing full testing and inclement weather.
This report summarizes the results of leak monitoring for hotel rooms on the 6th through 10th floors as of 11-25-19. It found leaks in 69 total units, with 42 units repaired and 24 units passing subsequent water testing. Five units were found to have leaks recur after repair. Nineteen units remained without detected leaks. Challenges included a building management unit malfunction preventing full testing and inclement weather.
This report summarizes the results of leak monitoring for hotel rooms on the 6th through 10th floors as of 11-25-19. It found leaks in 69 total units, with 42 units repaired and 24 units passing subsequent water testing. Five units were found to have leaks recur after repair. Nineteen units remained without detected leaks. Challenges included a building management unit malfunction preventing full testing and inclement weather.
Total Units with Leaks: 69 Units UNITS 7062,8064,8069,8070 REPAIRED AND WATER TESTED Total Units Repaired : 42 units UNITS 8066 AND 8068 TO BE SCHEDULED FOR WATER TESTING
Total Units Passed: 24 units
Total Units Recurred Leak: 5 units Total Units Without leak: 19 units
CHALLENGES: BMU MALFUNCTION (11-25-19) CANNOT TRAVEL FROM SEQUENCE 6 TO SEQUENCE 5
WEATHER
Prepared by: Façade Team
d' consult international, inc. construction project manager