1.0. Activities 1
8.0. M-Sand 10
2
2.0. ARCHITECTURAL WING
Architectural Wing evolves preliminary drawings,
detailed plans, elevations & cross sections for
construction, considering the utility aspects of the
buildings such as office, educational, medical
and residential purposes etc. as per the standard
norms.
The architect wing is the competent authority for
architectural drawings / plans of the drawings
and walk through if necessary. The architect
wing adds creativity and artistic elements to the
building by understanding the limitations and
potential of the site, financial targets, realizing
different technical difficulties and predicting
future expansion opinions and technical ideas
and focusing on the aesthetic factors, cost
estimation, timescale of the project, barrier free
environment, reduction consumption utilizing
energy and consuming more natural resources
etc the drawing are evolved by the architect. It
also included rendering of floor plan, site plan,
the elevation and isometric views apart from 2D
and 3D views.
6
4.2. MAINTENANCE OF GOVERNMENT
BUILDINGS
4.2.1. PWD BUILDINGS
In the Budget Estimate for 2020-2021 under
Public Works Department – Buildings, Demand
No.39, an amount of Rs.93.93 Crore is allotted
towards maintenance and repair works in
Government Bungalows occupied by the Hon’ble
Ministers, Inspection Bungalows, Circuit Houses,
Public Works Department Office Buildings and
Government Staff Quarters.
Climatic change
Air pollution
Maintenance issues
Environmental factors
Temperature fluctuations
8.0. M-SAND
Manufactured Sand otherwise known as
Crushed Stone Sand identified as an alternative
to River Sand. M-Sand when produced by
proper machines can be used as a better
substitute to river sand. Since,
M-Sand does not have organic impurities, can be
used directly without any wastage. The superior
shape and gradation of M-Sand ensures high
strength concrete. Hence, the M-Sand is
promoted as an alternative to river sand with the
following objectives:-
10
To prevent damage to environment by
rationalizing the use of river sand in a
conserved manner.
11
9.0. SCHEDULE OF RATES
Every year, the Standard Schedule of Rates are
finalised by the Schedule of Rates Committee
and communicated to all the Government
departments through PWD for adoption in the
estimates for various construction projects and
taking decision on the tenders.
13
adopted for valuation of rent by PWD and
Collection of Stamp Duty by Registration
Department.
10.0. CREATION OF BARRIER FREE
ENVIRONMENT FOR THE DIFFERENTLY
ABLED PERSONS
For implementation of the Persons with
Disabilities (Equal opportunities, Protection of
Rights and Full Participation) Act, 1995 in
respect of Creation of barrier free environment in
construction and maintenance works in all
categories of buildings and facilities used by the
public for making accessible to and functional for
Differently Abled Persons following the general
guidelines and space standards for barrier free
built environment.
Signage
Signs shall be provided at junction of circulation
routes and key destinations such as doorways at
reception points, toilets, drinking water facility,
etc.
14
A clear indication of the existence of steps or
ramps on route shall be provided at both ends of
the route.
Accessible Entrance
Ramp
Toilets
15
The toilet bowls should be preferably as a stool
type.
Lift
16
11.0. DEPARTMENT-WISE BUILDING WORKS
11.1. ANIMAL HUSBANDRY, DAIRYING AND
FISHERIES DEPARTMENT
In Animal Husbandry, out of 198 building
construction works at a total estimated cost of
Rs.162.22 Crore, 3 works are completed,
120 works are in progress and 75 works are to
be taken up. The details are as below:
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Construction of Rural Veterinary 0.42
Dispensaries in 2 places under
NABARD Assistance (Phase XXI)
Works in progress
1 Construction of Veterinary 2.83
Dispensaries and Animal Disease
Intelligence Units in 8 under NABARD
Assistance (Phase XXII)
2 Construction of Veterinary 7.56
Dispensaries and Animal Disease
Intelligence Units at 24 Places under
NABARD Assistance (Phase XXIII)
17
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Construction of Veterinary Dispensaries, 35.48
Veterinary Hospital and Animal Disease
Intelligence Units at 87 places under
NABARD Assistance (Phase XXIV)
Work in progress
1 Providing Bathroom Sewage Water 1.20
Treatment & Recycling arrangements to
the 13 Nos. of Hostel and Providing
Dining Table arrangement in 11 Nos. of
Adi Dravidar and Tribal Welfare Boys and
Girls Hostels in Chennai District
19
11.3. BACKWARD CLASSES, MOST BACKWARD
CLASSES AND MINORITIES WELFARE
DEPARTMENT
In Backward Classes, Most Backward Classes
and Minorities Welfare Department, out of
147 building construction works at a total
estimated cost of Rs.133.25 Crore, 1 work is
completed, 111 works are in progress and 35
works are to be taken up. The details are as
below:
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Work completed
1 Construction of Hostel Buildings with 0.93
Solar Energy System for Backward
Classes, Most Backward Classes, De-
notified Community and Minority
Students at 1 place
Works in progress
1 Construction of Additional Laboratory, 1.04
Additional Toilet Block and Compound
Wall and Water Supply facilities to 3
Kallar Higher Secondary/High Schools
under Phase-21
2 Construction of Additional Class 1.60
Rooms, Additional Toilets, Compound
Wall and Water supply arrangements to
4 Kallar Elementary / Middle / High /
Higher Secondary Schools under
Phase-22
20
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Construction of Laboratory, Additional 25.08
Class Rooms, Additional Toilets,
Compound Wall and Bore-well to 99
Kallar Elementary / Middle / High /
Higher Secondary Schools under
Phase-24
4 Construction of Hostel Buildings with 9.29
Solar Energy System for Backward
Classes, Most Backward Classes, De-
notified Community and Minority
Students at 5 places
21
and Minority Students at12 places at an
estimated cost of Rs.39.57 Crore.
4) Modernization of Backward Class Directorate
Office, Most Backward Class and De-notified
Communities Directorate Office, Conference
hall, Other Officer’s Rooms and Staff Hall at
an estimated cost of Rs.1.00 Crore.
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Work completed
1 Construction of District Central 1.87
Co-Operative Bank Building at
Arakonam in Ranipet District
22
11.5. COMMERCIAL TAXES AND REGISTRATION
DEPARTMENT
In Commercial Taxes and Registration
Department, out of 67 building construction
works at a total estimated cost of
Rs.219.74 Crore, 10 works are completed,
34 works are in progress and 23 works are to be
taken up. The details are as below:
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Construction of Commercial Tax 1.54
Office at Palani in Dindigul District
27
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Construction of Office Building for 5.87
District Environmental Engineer with
Laboratory, Tamil Nadu Pollution
Control Board at 3 places at
Nagapattinam in Nagapattinam
District, Tiruvannamalai in
Tiruvannamalai District and Theni in
Theni District
2 Construction of Office Building for 1.93
District Environmental Engineer with
Laboratory, Tamil Nadu Pollution
Control Board in SIPCOT Industrial
Complex at Gummidipoondi in
Tiruvallur District
3 Construction of Office building for 1.80
Tamil Nadu Pollution Control Board
at Kurichi in Coimbatore District
Works in progress
1 Construction of Office Building for 30.00
Forest Department at Velachery in
Chennai District
2 Construction of District 2.00
Environmental Engineer’s Office and
Laboratory for Tamil Nadu Pollution
Control Board in Thalavaipatti at
Salem District
28
Details of works to be taken up are as below :
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Construction of Hi-Tech Parlour for 0.32
AAVIN at Urban Haat, Kanniyakumari
in Kanniyakumari District
29
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
2 Construction of Urban Haat at 5.00
Mamallapuram in Chegalpattu District
30
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
4 Construction of Buildings for New 269.59
Government Medical College and
Hospital buildings at Karur
33
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
23 Providing Ramp facilities in the existing 8.65
Buildings of Government Medical
College and Hospitals / Institutions
24 Providing Ramp / Fire safety method for 5.24
Government Medical College at Vellore,
Chengalpattu, Government Arignar Anna
Memorial Government Hospital at
Kancheepuram
Works in progress
1 Construction of Primary Health Centre, 723.74
Health Sub Centre, Government
Hospitals and Government Medical
College Hospitals under National Rural
Health Mission Project
35
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
2 Construction of building for Out Patient 62.30
at Rajiv Gandhi Government General
Hospital, Chennai
38
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
23 Construction of Gynaec-Surgical Block 19.78
for Institute of Obstetrics and
Gynecology and Government Hospital
for Women and Children at Egmore,
Chennai
39
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
29 Construction of a new world class 65.00
International Institute of Yoga and
Naturopathy Medical Sciences in
Chengalpattu Government Medical
College Campus
40
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
35 Construction of new building for Deputy 3.58
Director of Health services office at
Thoothukudi, Kovilpatti and Villupuram
36 Construction of 30 bedded ward building 1.40
with Operation Theatre for Government
Primary Health Centre at Koneripatty in
Edappadi Block of Salem District
43
7) Construction of New Eye Block at
Government Rajamirasudhar Hospital at
Thanjavur in Thanjavur District at an estimated
cost of Rs.16.47 Crore.
45
20) Construction of a Tower Block at Government
Coimbatore Medical College and Hospital,
Coimbatore at an estimated cost of
Rs.124.25 Crore.
47
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
2 Construction of Combined Court Building, 6.46
Staff Canteen, Two Garages at Polur in
Tiruvanamalai District
48
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
9 Renovation works and approach road in 0.96
the Principal District Judge's Bungalow at
Cuddalore
49
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
15 Construction of Post attached quarters 1.01
for Principal District Munsif and Judicial
Magistrate at Thirukovilur in Villupuram
District
Works in progress
1 Construction of Quarters for Judicial 3.02
Officers at Thiruvarur in Thiruvarur
District
50
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
5 Construction of Combined Court 64.42
Buildings at 3 places at Orathanadu in
Thanjavur District, Nagapattinam in
Nagapattinam District and Tiruppur in
Tiruppur District
53
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
24 Construction of 8 Nos. of Judges 13.57
Bungalows in the premises of Madurai
Bench of Madras High Court, Madurai
54
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
30 Construction of Additional District Munsif 0.50
quarters in the campus of Combined
Court building at Arupukottai in
Virudhunagar District
57
12) Construction of Compound wall around the
Combined Court Building campus at
Perambalur in Perambalur District at an
estimated cost of Rs.63.00 Lakh.
Works in progress
1 Construction of Auditorium and Library 9.97
in Government Law College at Madurai
60
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
6 Providing Additional infrastructural 0.67
facilities to Chennai Dr.Ambedkar
Government Law College Building at
Pudupakkam in Chengalpattu District
7 Providing Additional Infrastructure 0.43
facilities to Dr.Ambedkar Government
Law College Building at
Pattaraiperumbudur in Tiruvallur
District
63
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
5 Construction of Class Room and 1.09
Laboratory for Nine Trades in
Government Industrial Training
Institutes at Paramakudi in
Ramanathapuram District
Works in progress
1 Construction of building for Institute 18.74
of Labour Studies at Ambattur in
Thiruvallur District
64
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
2 Construction of Class Room and 6.81
Workshop for High End Trade at 6
places at Andimadam in Ariyalur
District, Dharapuram in Coimbatore,
Namakkal in Namakkal District,
Mudukulathur in Ramanthapuram
District, Tiruppur in Tiruppur District,
Nagercoil in Kanniyakumari District
65
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
6 Renovation of building for 1.15
Government Industrial Training
Centre at Thanjavur in Thanjavur
District
67
4) Construction of Integrated Labour Office
Building at Krishnagiri Krishnagiri District at
an estimated cost of Rs. 3.63 Crore.
68
10) Construction of Hostel and Mess facilities in
Government ITIs at 12 places at an
estimated cost of Rs.38.80 Crore.
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Work completed
1 Replacement of existing 2 Nos. 0.42
10 person capacity passenger Lifts
in North and South at Gate No.8 at
Main Building, Secretariat, Chennai
71
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
2 Replacement of A & B Lifts in 0.76
Namakkal Kavignar Maaligai,
Secretariat, Chennai
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Renovation and Improvements and 2.69
Provision of Lifts for Differently abled
persons (2 Nos. of 13 Passenger Lift)
in PWD Main Building and Circle
Offices in Chepauk, Chennai
72
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Procurement of New 19 Nos. of Jeeps 1.30
on replacement basis for Assistant
Executive Engineers working in Sub
Divisions under Buildings Organisation
4 Construction of Twin Type Group 15.81
Houses (43 Blocks) for Project Affected
Persons at 5 places at Maharajapuram
Melapathi, Thulasapuram,
Thirukkuvalai, Palakuruchi in
Nagapattinam District
74
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
5 Construction of building for the PWD 1.27
Buildings (Construction & Maintenance)
Division office with Sub Division offices
at Katpadi in Vellore District
6 Construction of building for Chief 4.90
Engineer (Buildings), Madurai Region
in PWD Campus at Madurai
7 Renovation of Fire affected and 41.12
distressed Heritage Building Humayun
Mahal, Chepauk,Chennai-5
8 Renovation and Restoration of South 18.50
Wing of Main Building (Heritage
Building) and North Wing of Main
Building (Heritage Building) in PWD
Campus at Chepauk, Chennai-5
9 Construction of 50 Nos. of Government 11.87
Staff Quarters at Udhagamandalam in
The Nilgiris District
76
9) Recycling and Reusing of Waste Water in
Government Residential Campus, Todhunter
Nagar, Saidapet, Chennai at an estimated cost
of Rs.3.00 Crore.
10) Provision of Rainwater Harvesting with
collection and surface drain arrangements in
Government Residential Campus, Todhunter
Nagar, Saidapet, Chennai at an estimated cost
of Rs.70.00 Lakh.
11) Construction of Office Building for Electrical
Division with Sub Division at Tirunelveli at an
estimated cost of Rs.99.56 Lakh.
12) Construction of Quarters for Executive
Engineer at Nagercoil in Kanniyakumari District
at an estimated cost of Rs.55.90 Lakh.
13) Construction of Quarters for Executive
Engineer and Assistant Executive Engineer at
Nagapattinam at an estimated cost of
Rs.1.00 Crore.
14) Construction of Quarters for Executive
Engineer and Assistant Executive Engineer at
Thiruvarur at an estimated cost of
Rs.1.00 Crore.
Announcements made in Budget Speech
2020-2021
1) A Special annual allocation for the Restoration
and Conservation of Heritage Government
Buildings will be made. Accordingly, a
provision of Rs.50.00 Crore has been made in
the Budget Estimate for 2020-2021.
77
2) To cater to the growing demands for rental
housing from Government Servants, one more
Residential Tower will be constructed in
Todhunter Nagar at Saidapet by the Public
Works Department at a total cost of
Rs.76.00 Crore. Attendant facilities would be
developed at a cost of Rs.24.00 Crore. A
provision of Rs.40.00 Crore has been made in
the Budget Estimates 2020-2021 for this
purpose.
78
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
2 Construction of Taluk Office building 2.39
at Vedsandur in Dindigul District
79
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
6 Construction of Revenue Divisional 2.08
Office Building and Quarters at
Coimbatore (North) in Coimbatore
District
Works in progress
1 Construction of building for Taluk 8.61
Office and Tashildar Quarters at 3
places at Kancheepuram in
Kancheepuram District, Maduravoyal
in Tiruvallur District, Viralimalai in
Pudukottai District
80
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Construction of building for Taluk 5.46
Office at 2 places at Pudukottai in
Pudukottai District and
Uthamapalayam in Theni District
81
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
District, Jamunamarathur in
Tiruvannamalai District,
Kumarapalayam in Namakkal District,
Pethanaickenpalayam in Salem
District
83
Details of works to be taken up are as below :
84
7) Construction of Quarters for Revenue
Divisional Officer at 4 places at Guindy in
Chennai District, Udumalpet in Tiruppur
District, Udhagamandalam in The Nilgiris
District and Aranthangi in Pudukottai District
at an estimated cost of Rs.1.24 Crore.
85
13) Construction of Taluk Office and Quarters
at 13 places at Mohanur in Namakkal
District, Thisayanvilai in Tirunelveli District,
Kallikudi in Madurai District, R.S. Mangalam
in Ramanathapuram District, Anchetty in
Krishnagiri District, Thiruvattar, Killiyur in
Kanniyakumari District, Kujiliyamparai in
Dindigul District, R.K. Pet in Thiruvallur
District, Watrap in Virudhunagar District,
Pugalur in Karur District, Eral in
Thoothukudi District, Anaimalai in
Coimbatore District at an estimated cost of
Rs.42.32 Crore.
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Providing Infrastructural 234.13
improvements like additional
Classrooms, Laboratory, Toilets,
Drinking Water Facilities and
Compound wall in 95 Government
86
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
High Schools and Government
Higher Secondary Schools in Tamil
Nadu under NABARD Loan
Assistance
Works in progress
1 Providing Infrastructural facilities like 159.79
additional Classrooms, Laboratory,
Toilets, Drinking Water Facilities and
Compound wall in 104 Government
High Schools and Government
Higher Secondary Schools in Tamil
Nadu under NABARD Loan
Assistance
88
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Construction of School Buildings for 1.20
1 upgraded Government High School
under RMSA for the year 2017
89
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
9 Strengthening of existing 16.63
Government High School Building
under Integrated Scheme for School
Education (198 works) (2018-2019)
Details of works to be taken up are as below :
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Construction of Government Children 3.65
Home building at Panchapalli in
Dharmapuri District
2 Special repair to Approach Road from 0.13
Government Children Home for Girls
to Office of the Commissionerate of
Social Defence at Kellys, Chennai
Works in progress
1 Construction of Hostel Building for 1.26
Working Women at Thanjavur in
Thanjavur District
92
Details of works to be taken up are as below :
1) Construction of Hostel for Working Women at
12 places Tiruchirappalli in Tiruchirappalli
District, Coimbatore in Coimbatore District,
Sivagangai in Sivagangai District,
Chengalpattu in Chengalpattu District,
Sriperumbudur in Kancheepuram District,
Sholinganallur in Chennai District and
6 places in Chennai District at an estimated
cost of Rs.12.12 Crore.
94
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
4 Construction of Manimandapam for 1.34
Dr. Pa.Sivanthi Adithanar at
Tiruchendur in Thoothukudi District
5 Renovation of Re-Recording Theatre in 1.42
M.G.R. Government Film & TV Institute
Campus at Taramani, Chennai
Works in progress
1 Construction of Memorial for the 50.80
Hon’ble former Chief Minister of Tamil
Nadu Selvi J Jayalalithaa in Chennai
2 Construction of Additional Building in 1.85
Government Printing Press at
Tiruchirappalli
96
8) Construction of Manimandapam for Perarasar
Perumpidugu Mutharaiyar at Tiruchirappalli
District at an estimated cost of
Rs.99.25 Lakh.
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Work completed
1 Construction of building for Art & 0.75
Culture Centre at Coimbatore in
Coimbatore District
Works in progress
1 Construction of Yatri Nivas at 30.92
Arulmigu Ramanathaswamy Temple
at Rameswaram
97
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Special Repairs to Leaky Roof in old 1.50
Library block (Heritage building) at
Connemara Public Library, Egmore,
Chennai
99
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works in progress
1 Construction of Regional Transport 5.33
Office Building at 2 places at Erode
(West) in Erode District and Kovilpatti
in Thoothukudi District
100
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
6 Construction of building for Motor 1.53
Vehicle Inspector Office at
Tirumangalam in Madurai District
101
5) Construction of building for Regional
Transport Office at Salem (East) at an
estimated cost of Rs.3.19 Crore.
102
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Construction of Sub Treasury Office 3.80
Building at 5 places at Salem in Salem
District, Cheranmahadevi in Tirunelveli
District, Kanniyakumari in
Kanniyakumari District and Ambur &
Sholingur in Ranipet District
Works in progress
1 Construction of Sub Treasury Office 8.38
Building at 10 places at Kadalady in
Ramanathapuram District,
Chengalpattu in Chengalpattu District,
Mayiladuthurai & Thirukuvalai in
Nagapattinam District, Annur in
Coimbatore District, Kodumudi in Erode
District, Chinnasalem in Kallakurichi
District, Vanur in Villupuram District,
Thirupuvanam in Sivagangai District,
Poonamallee in Tiruvallur District
103
Details of works to be taken up are as below:
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
Works completed
1 Upgradation of Government High 0.34
School for visually challenged Students
in Thanjavur
104
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Providing barrier free Environment for 0.28
Differently Abled Persons in District
Employment Office, Coimbatore
4 Providing barrier free Environment for 0.05
Differently Abled Persons in Backward
and Minority Welfare Office,
Coimbatore
Works in progress
1 Providing barrier free Environment for 0.95
Differently Abled Persons in Regional
Transport Office, Coimbatore
2 Providing barrier free Environment for 1.79
Differently Abled Persons in District
Collector Office, Coimbatore
Works in progress
1 Construction of Multipurpose Indoor 4.62
Stadium at Pudukottai
106
Estimate
Sl. Amount
Details of work
No (Rs. in
crore)
3 Construction of additional Walker Path, 3.70
Basket Ball Court, Badminton Ball Court
and Gym Hall in Indoor Sports Complex
at Hosur in Krishnagiri District
Edappadi K. Palaniswami
Chief Minister
108