Loss Calculation in Packing Hall-Due to Wall/Partition etc Openings

Location Opening Area(Sq.ft) CFM Loss for respective area Tonnage Loss(USTR) KWH Loss KWH Loss/Day Loss in PKR/Day
80 3200 8 9.6 230.4 3571.2
Cutting & Mixing Area(Line# 04
64 2560 6.4 7.68 184.32 2856.96
& 06)
48 1920 4.8 5.76 138.24 2142.72
5 200 0.5 0.6 14.4 223.2
2 80 0.2 0.24 5.76 89.28
Near AHU# 06-Packing Hall
18 720 1.8 2.16 51.84 803.52
1 40 0.1 0.12 2.88 44.64
35 1400 3.5 4.2 100.8 1562.4
At End of Conveyor Line# 05
144 5760 14.4 17.28 414.72 6428.16
4 160 0.4 0.48 11.52 178.56
1 40 0.1 0.12 2.88 44.64
Near AHU# 09-Packing Hall
12 480 1.2 1.44 34.56 535.68
12 480 1.2 1.44 34.56 535.68
6 240 0.6 0.72 17.28 267.84
Near New Tray Washing Area
2 80 0.2 0.24 5.76 89.28
48 1920 4.8 5.76 138.24 2142.72
Near AHU# 08 Main Duct
12 480 1.2 1.44 34.56 535.68
Door Open line# 07(Due to
which air flow towards oven 16 640 1.6 1.92 46.08 714.24
hall)
Door of Line# 06-Partition
80 3200 8 9.6 230.4 3571.2
Towards Crump Section
Grand Total 590 23600 59 70.8 1699.2 26337.6

Photographs
Below are the photographs of the area for respective coooling loss along with area description:

Fig. 01 Fig. 02 Fig. 03


Fig. 04 Fig. 05 Fig. 06

Fig. 07 Fig. 08 Fig. 09

Fig. 10 Fig. 11 Fig. 12


Fig. 13 Fig. 14 Fig. 15

Fig. 16 Fig. 17 Fig. 18

Fig. 19 Fig. 20 Fig. 21

The End