COST ESTIMATE
Item Description Unit Rate Amount Remarks
Qty Unit
(IDR) (IDR)
B2 EXHIBIT B2 MATERIAL
I.1 STEEL PLATFORM
40 "U" Channel, Steel, Various Widths, Leg Lengths & Thickness 335.52 Kg 23,610.03 7,921,638.00
39 Angle Iron, Steel, Various Widths & Thickness 195.12 Kg 23,610.03 4,606,790.00
38 Flat Stock, Steel, Various Widths & Thickness 187.00 Kg 23,610.03 4,415,076.00
44 Steel Grating, Various bar height, thickness and spacing 212.00 Kg 51,088.37 10,830,735.00
46 Anchor Bolt, Nut & Washer, All Sizes and Threads, Hot Dip 13.71 Kg 35,081.57 481,119.00
Galvanize
52 Paint Brush, 4 inch wide, 4.00 ea 31,880.21 127,521.00
IX Reimbursable
1 Arc Welding Electrodes 25.00 kg 60,000.00 1,500,000.00
2 Filled Acetylene Gas, Cylinder 1.3 mtrs high, 1100 PSIG 1.00 Cyl 200,000.00 200,000.00
3 Filled Oxygen Gas, Cylinder 1.0 mtrs high, 250 PSIG 2.00 Cyl 175,000.00 350,000.00
4 Cold Galvanize Paint 20.00 kg 225,000.00 4,500,000.00
5 Sandblasting 2,5 SA 27.52 m2 246,000.00 6,769,418.16
IX Reimbursable
1 Dumptruck 4.00 Unit/Day 750,000.00 3,000,000.00 Moving materials and house
keeping
SUB TOTAL 42,672,853.80
B4 EXHIBIT B4 PERSONNEL
240 Construction Supervisor 9.00 Man/day 366,822.50 3,301,403.00 1 man 9 day working for
Fabrication
241 Site Safety Officer 9.00 Man/day 366,822.50 3,301,403.00 1 man 9 day working for
Fabrication
249 Welder ( ARC ) 15.00 Man/day 400,170.00 6,002,550.00 1 man 15 day working
250 Fitter ( Gas Welding ) 15.00 Man/day 200,085.00 3,001,275.00 1 man 15 day working
255 Labor 30.00 Man/day 140,059.50 4,201,785.00 2 man 15 day working for
Fabrication and painting
255 Labor 36.00 Man/day 140,059.50 5,042,142.00 4 man 9 day working for
installation
IX REIMBURSEABLE ITEM
1 Civil Engineer 3.00 Man/day 425,000.00 1,275,000.00 1 man 3 day working
2 Drafter 7.00 Man/day 250,000.00 1,750,000.00 1 man 7 day working
3 Personnel Scaffolder 10.00 Man/day 300,000.00 3,000,000.00 2 man 5 day working for
installation and dismantling
scaffolding
4 Personnel Inspector Scaffolding 2.00 Man/day 500,000.00 1,000,000.00 1 man 2 day working for
installation
SUB TOTAL 31,875,558.00
(33.00)
Proposed by Approved by
PT. Dwi Agung Sentosa Pratama
4 Punchlist 1.00
Scope of works :
+ Fabrication Platform at Workshop
+ Uninstallation Platform Existing at Palletizer Area m
+ Installation Platform at Palletizer Area
16 Filled Acetylene Gas, Cylinder 1.3 mtrs high, 1100 PSIG 1.00 Cyl
17 Filled Oxygen Gas, Cylinder 1.0 mtrs high, 250 PSIG 2.00 Cyl
EXHIBIT B1
CONTRACT PRICE
a
Mobilization and Demobilization
I 1.00
One time payment mob and demob personnel, equipment, tools, etc from /
to site. Maximum quoted price is 0.01% from total contract price.
Sub Total I
II Contractor Personnel
1 Civil Maintenance Supervisor 1.00
2 Safety Officer 1.00
3 Civil Technician 2.00
Sub Total II
III Tools
The cost related to civil works, electrical works, checmical, etc (refer to
exh. A5). 1.00
Sub Total IV
V Equipment
The cost related to heavy equipment, operating tools, vehicle, etc (refer to
exh.B3) 1.00
Sub Total V
VI Additional Personnel
The cost related to additional personnel subject to Company approval
(refer to exh.B4) 1.00
Sub Total VI
VII Shelter and Building
1 Smoking shelter works (material, labor, equipment, electrical, mechanical, 100.00
full furnished, etc)
2 Bus shelter works (material, labor, equipment, electrical, mechanical, full 300.00
furnished, etc)
3 Small Building (Security Post, Storage, etc) 1,000.00
4 Canopy works (material, labor, equipment, electrical, mechanical, etc) 1,000.00
VII Others
1 Security Background Screening (every 5 year) 4.00
2 Medical Check Up (annual basis) 20.00
3 Drug and Alchohol Test 20.00
4 Uniform & PPE 20.00
5 Safety Tokens 100.00
6 1 unit double cabin vehicle including fuel, license, maintenance and other 60.00
related costs.
Sub Total VIII
IX Reimbursable Items
The associated cost which is not covered from above list but still related to
civil maintenance and consumable material. 1.00
Sub Total IX
Grand Total (I+II+III+IV+V+VI+VII+VIII+IX)
Note:
1. Contractor personnel salary must includes THR, vacation, Jamsostek, Insurance with 3 children, field allowance, etc.
2. For additional manpower, the price including PPE and other related costs.
3. If contractor uses sub contractor to provide the works/tasks, Company must review/endorse before sub contractor performs the work.
4. Contractor will invoice Company on monthly basis, supporting documents ; call off, certification of completion and feedback from user
5. Contractor must perform Security Background Chcek every 5 years, Medical Checkup and A&D Test every years
6. Contractor must provide standard PPE (safety shoes, helmet, gloves, glasses, masker) and 3 uniforms including coverall in yearly bas
EXHIBIT B1
ONTRACT PRICE
EXHIBIT B1
ONTRACT PRICE
90,171,640.00
497,603,391.60
41,116,027,554.95
28,760,671,426.00
3,020,616,550.00
m2 4,784,699.30 NA 478,469,930.00
m2 4,784,699.30 NA 1,435,409,790.00 Jika Harganya m2
10,717,619,720.00 349.00
1,458,128,774.80
Lot NA NA 1,815,437,900.00
1,815,437,900.00
90,178,640,974.15
B. Agus Triharjono
Direktur
a Harganya m2
m2
m2 339,387,911.92
m2 1,558,505,016.58
EXHIBIT B2
PRICE LIST OF MATERIAL FOR 5 YEARS
Detail Description
No.
I. REIMBURSABLE - MATERIAL
I.1 CONCRETE AND AGGREGATE
1 River Aggregate "Krasak" - Local Material
2 Concrete K-175
3 Concrete K-250
4 River Sand
5 River Sand Washed for Concrete
6 Round River Gravel, 30 to 50 mm Size, Washed
7 Round River Cobble Stones, 100 to 400mm size
8 AP75 Andersite Aggregate Crusher Run Base Coarse
9 Andersite 10 to 30 mm Aggregate Split Rock (For Concrete)
10 Quarry Crusher Fines, Andesite (Crusher Dust)
11 200 mm Broken Andersite Rock, No Fines For Masonry Works
12 200 to 300mm Size Limestone Rock
13 Limestone Quarry Waste
14 Portland Cement, Type 1, ASTM-C-150-86, shall be delivered in the sealed and branded
bags of the Manufacturer
15 Steel Reinforcing Smooth Bar, Various Diameter Sizes
16 Steel Reinforcing Deformed Bar, Various Diameter Sizes
17 Rebar Tie Wire (Bengkras)
I.2 UNDERGROUND GEOTEXTILES, GEOMEMBRANES & DRAINS
18 Construction Bamboo (Gedek) Mat, woven, heavy duty construction type
19 Woven Geotextile, Rienfox HRX 300
Tarpaulin Pit & Sump Liner, Plastic, Waterproof, 200 gr/M² Thick, Protection Coating.
20
21 Ijuk Aren Palm Fiber, Cleaned and Combed
I.3 EMBANKMENTS & REVETMENTS
22 Gabion Box, Galvanized 2.7 mm Machine Wire Wound , Size 2.0 x 1.0 x 1.0 meter (2 M3),
23 8cm
Gabionx 10cm
Box, Mesh Size 2.7mm Machine Wire Wound, Size 2.0 x 1.0 x 0.5 meter (1 M3),
Galvanized
8cm x 10cm Mesh
I.4 CULVERTS Size
& WATERLINES
24 Armco Steel Round and Structural Shaped Culverts, all Metal Gauges and shapes 600mm
- 1500mm
25 500mm Inside Dia x 1000mm Long, 80mm Wall Thickness Steel Reinforced Concrete
Culvert, Single Amature with 8mm Rebar
26 600mm Inside Dia X 1000mm Long, 80mm Wall Thickness Steel Reinforced Concrete
Culvert, Single Amature with 8mm Rebar
1.5 WOOD & FASTENERS
27 Hardwood, Indonesian Class I, Cut into Planks various sizes (Kamper)
1 28 Medium Hardwood, Indonesian Class II, cut into Planks various sizes, (Kamper)
29 Medium Soft Wood, Indonesian Class III cut into Planks various sizes (Borneo)
30 Dolken, Round,10cm Dia. x 3 Meters Long, Mangrove Wood
31 Bridge Nails, High Carbon Steel, Square Body Shape, Zinc Galvanized Coated, Various
Sizes (4 To 8")
Nails, Wood Construction, Round Body & Head, Medium Carbon Steel, Zinc Galvanized,
32 Various Sizes (½ To 8")
1
33 Melamine
34 4 mm Plywood, size 1.20 x 2.40 meter, 4 Ply
1 35 9 mm Plywood, size 1.20 x 2.40 meter, Multi-ply
36 18 mm Plywood, size 1.20 x 2.40 meter, Multi-ply
37 Bamboo Pile, 6 inch dia., Butt End, Species Ori or Petung
I.6 CONSTRUCTION STEEL PIPE, PLATE & PROFILE
3 38 Flat Stock, Steel, Various Widths & Thickness
2 39 Angle Iron, Steel, Various Widths & Thickness
1 40 "U" Channel, Steel, Various Widths, Leg Lengths & Thickness
41 "H" Beam, Wide Flange, Various Widths, Heights & Thickness
42 Steel Pipe TT (BS 1387-67, SNI 0039-87)
43 Hot Rolled Sheet/Plate Steel, various thickness
5 44 Steel Grating, Various bar height, thickness and spacing
45 Nuts, Bolts & Washers, All Sizes and Threads, Schedule 40
4 46 Anchor Bolt, Nut & Washer, All Sizes and Threads, Hot Dip Galvanize
I.8 PAINTS AND CORROSION COATINGS
47 Paint, Zinc Chromate Metal Primer, Dana Paint Co.
48 Wood Primer Paint, (Cat Mini Untuk Kayu) Dana Paint Co.
49 Enamel Metal Paint, Any Color, Dana Paint Co.
50 Wood Exterior Lacquer Paint, Any Color, Dana Paint Co.
51 Paint Brush, 2 inch wide,
52 Paint Brush, 4 inch wide,
53 Paint Roller, 20cm wide, complete with plastic paint tray
54 Coaltar Epoxy Resin Coating
55 Kerosene, Refined
I.9 ROOFING, FLOORING AND ACCESSORIES
56 Iron Corrugate Roofing, Zinc Galvanized Coated, Minimum Sheet Size 0,75 x 2.5 mtr
57 Iron Corrugate Roofing, Zinc Galvanized Coated, Minimum Sheet Size 0,75 x 1.8 mtr
58 "U" channel, galvalume, T=0,8, L=6 m
59 "V" channel, galvalume, T=0,8, L=6 m
60 Corrugate Roofing Nails, Large Concaved Head, Zinc Galvanized Coated, All Sizes
61 Tarpaulin, Plastic, Waterproof, 200 gr/M² Thick, Ultra-Violet Stablized
62 Load Bearing, structural Wall Frames, 0.75 mm thk, profile size "U-78mm" & "C-75mm"
63 Ceiling Frames of 0.75 mm thickness, profile size "U-78mm" & "C-75mm"
64 Lintel Frames of 0.75 mm thickness, profile size "L-75 x 75mm"
65 Roof Truss Frames, 0.75 mm thk, profile size "U-78mm" & "C-75mm"
66 Roof Battens, 0.5 mm thk, profile size "C-40mm"
67 Galvanized screws for Roof Trusses & Roof Battens
68 Eave Soffit Infills, incl. brackets 0.35 mm TCT, profile "Superdek" & Snow-white colour
69 Roof Sheets, 0.35 TCT thick, 0.9m wide x 2.30m long x 15 nos
70 Ridge Capping, 0.35 TCT thick, 2.50m long x 3 nos
71 Barge Capping, 0.35 TCT thick, 2.40m long x 4 nos
72 Galvanized screws for Roof Sheets & Flashings
73 Wall Cladding Sheets for long sides, 0.35 TCT thick, 0.86m wide x 2.52m long x 20 sh.
74 Wall Cladding Sheets for Gable Ends, 0.35 TCT thick, 0.86m wide x 3m long x 8 sh
75 External Corner Joiners, 2.52m long x 4 nos
76 Galvanized screws for Wall Cladding Sheets & Flashings
77 Glasswool insulation, 50 mm thk. 16 kgs/m3, and roll size 1.2m x 18 m long
78 Aluminium Sisalation, one sided with roll size 1.2m x 60 m long
79 Aluminium Tape - 30 m long
80 "Pre-laminated Plywood" for walls, 3 mm thick, 1.22 m wide x 2.44 m long
81 "Pre-laminated Plywood" for ceilings, 3 mm thick, 1.22 m wide x 2.44 m long
82 Natural Anodized Aluminium Door (1 x 2 m) with Glass dia.6 mm
83 Natural Anodized Aluminium Window ( 1 x 0,5 m) with Glass diam.6mm
84 Hollow cement blocks, rectangular size 30x15x10cm
85 Ceramic Tiles, 40x40cm
86 Ceramic Glazed Floor Tiles, Non Slip, 20x20cm
87 Formica Sheet, 1.2M Heavy Duty, 1.2x2.0M Size or Equivalent.
88 Supply Paving Block Heavy Duty type
89 Concrete Curb (Conblock product)
90 Vinyl Floor Sheet
I.10 SCREENS & MESH
91 Wire Mesh, Galvanized, 1.5 x 2.0cm hexagonal openings, double twisted wire
92 Security Screen, Galvanized, Opening 10mm Square
93 Fly Screen, Aluminum
94 Fly Screen, Plastic
I. 11 FENCING AND WIRES
95 Barbed Fencing Wire, Zinc Galvanized Coated, 2,6mm.
96 Chain Link Fencing, Galvanized, 2.6mm x 50mm mesh
97 Wire mash M8 (150x150)
BRC Galvanized welded mesh fence panels, with formed top / bottom reinforced box beam
98 sections c/w posts, fittings, clamps, nuts, bolts (H:1,9m, W=2,4m, D=6mm, screws, and
washers.
99 Bamboo Posts, 3 inch Dia Butt End, Species Ori or Petung
I.12 SACKS & BAGS
100 25 Kg Size Plastic Rice Sacks, Empty, New
101 50 Kg Size Plastic Rice Sacks, Empty, New
I.13 CHEMICALS, ASPHALTS & BITUMENS
102 Asphalt ACWC
103 Asphalt Emulsion (Prime Coat AE-PC)
I.14 ELECTRICAL, FITTING & PANEL
104 Cable type MC
105 Exhaust fan - Brand: KDK or equal
106 Lighting (TL) Fitting
107 Halogen Lamp 500 Watt
108 Perimeter light ( Yellow ) for Helipad, Phillip or equal
109 Helipad LED Lighting unit, Phillip or equal
110 Helipad LED Replacement Kit, Phillip or equal
111 Ground Cable with Chopper Rod
112 Junction Box (1 Power Outlet + 1 Double Switch)
113 PP-BAC (Box Panel c/w Accessories Indoor Type)
114 MCB 3P 25A/6kA (ex - Hager or equal)
115 MCB 3P 16A/6kA (Ex Hager or equal)
116 MCB 1P 6A/4.5kA (ex- Hager or Equal)
117 GMS FL 2 x 36W c/w Acrylic cover (ex- Zetalux)
118 External Lamp PLC Genie 8W
119 Single Switch E2031/1/2A (clipsal)
120 Double Switch E2032/1/2A (Clipsal)
121 Power Outlet E2426/16S (Schuko Type)
122 Plug Socket 3P+N+E 380/415V IP44
123 NYM 3x2.5 mm2 (@ 100m)
124 NYY 4x4 mm2
125 NYFGbY 4x6 mm2
126 NYAF 1x6 mm2
127 PVC Conduit 20mm @3000mm
128 PVC Flexible Conduit 3/4 "
129 PVC Sock 3/4 "
130 PVC Dos Inbow
131 PVC T Dos
132 Grounding point c/w control box
I.15 EMERGENCY PARTS/GATES/ALARMS
133 Panic Exit Lock - Heavy Duty Quality
134 Panic Exit Bar - Heavy Duty Quality
135 Handle Panic Door
136 Smoke Detector operated with batteries (ex- Fire Sentry)
I.14 MISCELLANEOUS
137 3/4" Dia Nylon Rope, 4 Strand Construction
138 Ijuk Aren Rope Fastener,
139 6” Ø Plastic Floatation Ball, Center Hole
Traffic warning signs. Rectangular 70*50cm zinc plate with 25 x 25 angle iron reinforcing,
140 attached to 2ӯ sch. 20 galvanized pipe post 3.0 M length.
Traffic barriers 2ӯ sch. 20 steel pipe construction, top single rail 1.00 M above ground,
141 3.00 M long, fitted with welded sets of 2 legs each end for solid self standing c/w peg and
eye system for attaching and securing units end to end. Painted Zinc Ch
142 1.50 Height x 2.50 panel section
143 1.80 Height x 2.50 panel section
144 2.00 Height x 2.50 panel section
145 Hand Pump Dragon
146 Septic Tank Box fiber Cap. 2000x1500x1000 mm
147 Door handle
148 Acrylic Glass
149 Safety Cone
150 Door Stopper
151 Door Closer
152 Windsock with dimension 0.6x2.4x0,3m
IBIT B2
TERIAL FOR 5 YEARS
Estimate
Unit Unit Rate (IDR) Total Rate (IDR) USD
Quantity
TOTAL 41,116,027,554.95
13,339.00
191,414.65
1,275,875.35
1,467,290.00
223,294.86
242,369.63
159,534.44
159,534.44
382,829.30
382,829.30
357,218.42
223,294.86
229,697.58
142,860.69
102,043.35
17,862,655.07
18,500,659.44
22,276.13
-
19,074.77
22,943.08
19,074.77
19,074.77
-
427,381.56
363,621.14
-
35,081.57
893,179.44
1,033,505.72
-
6,379,510.14
5,741,505.77
3,508,690.56
38,282.93
25,477.49
24,543.76
102,043.35
126,320.33
210,489.42
350,815.70
14,005.95
-
23,610.03
23,610.03
23,610.03
23,610.03
23,610.03
23,610.03
51,088.37
35,081.57
35,081.57
-
91,238.76
91,238.76
216,892.14
108,446.07
19,074.77
31,880.21
127,654.23
19,074.77
44,685.65
-
172,206.49
137,124.92
191,414.65
191,414.65
33,214.11
30,679.70
72,697.55
66,294.83
66,294.83
66,294.83
58,691.60
3,067.97
153,131.72
130,722.20
114,848.79
114,848.79
1,467.29
130,722.20
130,722.20
114,848.79
3,067.97
421,112.23
1,263,203.30
84,169.09
245,570.99
245,570.99
1,684,182.14
1,122,743.63
4,802.04
146,062.05
132,056.10
421,112.23
210,489.42
210,489.42
350,815.70
-
140,326.28
140,326.28
89,371.30
89,371.30
-
11,471.54
153,131.72
1,275,875.35
1,148,354.51
19,074.77
-
12,805.44
19,074.77
-
1,913,879.72
18,541.21
-
133,923.56
873,971.28
580,513.28
696,695.97
2,526,273.21
2,526,273.21
2,526,273.21
1,148,354.51
1,071,788.65
612,393.49
612,393.49
612,393.49
290,923.59
918,656.93
74,698.40
66,294.83
82,968.58
116,049.30
82,968.58
2,057,407.36
79,500.44
107,779.12
66,294.83
33,214.11
22,943.08
15,339.85
14,005.95
14,005.95
1,352,441.21
-
4,561,404.44
5,473,658.65
2,105,294.37
1,052,580.49
-
28,011.90
28,011.90
168,471.57
1,052,580.49
1,052,580.49
2,667,800.00
3,334,750.00
4,668,650.00
1,052,580.49
8,420,910.70
1,473,692.72
701,764.79
421,112.23
472,067.21
618,796.21
908,252.51
EXHIBIT B3
PRICE LIST OF EQUIPMENT FOR 5 YEAR
Estimate
No. Detail Description
Quantity
II. REIMBURSABLE - EQUIPMENT
II.1 HEAVY EQUIPMENT
177 5M3 Wheel Motor Grader - DEPNAKER Certification 650
178 2.75M3 Wheel Motor Grader - DEPNAKER Certification 850
179 25T Rubber Compactor/Vibrator - DEPNAKER Certification 700
180 15T Rubber Compactor/Vibrator - DEPNAKER Certification 800
181 10T Rubber Compactor/Vibrator - DEPNAKER Certification 900
183 2T Tandem Roller - DEPNAKER Certification 900
184 2T Telescopic Handler 900
II.2 MOB/DEMOB
209 Mob/Demob 5M3 Wheel Motor Grader - DEPNAKER Certification 50
IDR
4,815,245.61
4,376,392.51
4,320,235.32
3,881,248.83
3,692,501.98
2,998,340.42
2,921,774.56
0.00
8,293,389.86
6,379,510.14
8,293,389.86
6,379,510.14
6,379,510.14
5,103,634.79
5,103,634.79
0.00
344,546.37
331,740.93
653,877.78
255,175.07
366,822.50
366,822.50
140,326.28
449,791.08
210,489.42
306,263.44
188,213.29
494,476.73
599,721.44
210,489.42
137,124.92
148,062.90
219,426.55
290,923.59
140,326.28
586,916.00
EXHIBIT B4
PRICE LIST OF ADDITIONAL PERSONNEL FOR 5 YEARS
Estimate
No. Detail Description Unit
Quantity
III. REIMBURSABLE - ADDITIONAL PERSONNEL
239 Field Coordinator 250 Man/day
240 Construction Supervisor 250 Man/day
241 Site Safety Officer 250 Man/day
242 Construction Foreman 500 Man/day
243 Labor Foreman 500 Man/day
244 Security Guard 750 Man/day
245 Surveyor 500 Man/day
246 Ass. Surveyor 500 Man/day
247 Carpenter 1500 Man/day
248 Electrician 1000 Man/day
249 Welder ( ARC ) 700 Man/day
250 Fitter ( Gas Welding ) 700 Man/day
251 Mechanic ( Medium Duty ) 700 Man/day
252 Plumber 700 Man/day
253 Mason 3000 Man/day
254 Flagman 1000 Man/day
255 Labor 3600 Man/day
FOR 5 YEARS
13,339.00