Project: __________________________________________

Sampling Bituminous Paving mixture Checklist

No. Tasks Indicator Comments

the material is inspected to determine discernible


1  
variations

2 sample was taken from below the top surface  

3 three approximately equal increments were taken  

sample was obtained by collecting the increments with a


4  
scoop or shovel

field sample quantity equals or exceeds the minimum


5  
recommended

6 Documenting of exercise.    

Prepared By: _________________________________ Date: ______/_______/________

Table 1: Indicator Key

Practises that fully conform to Technical Practises that fully conform to Technical
Specifications that are being carried out fully Specification that are not being carried out fully
Approved practises that are not being fully Approved practises that are being fully followed
followed
Not Applicable