Professional Documents
Culture Documents
Program Manual 23-03-2015 FINAL PDF
Program Manual 23-03-2015 FINAL PDF
Jalswarajya – II Program
(Maharashtra Rural Water Supply and Sanitation Program)
1
Version Control
Ver-0 28th First Email from Task Team Leader, World Bank to
February approved Principal Secretary, WSSD & Dy. Secretary
2014 version and Project Director, RSPMU on
10th March 2014
Page 2 of 455
Rajesh Kumar Government of Maharashtra
Principal Secretary Water Supply and Sanitation
Department
FOREWORD
India has seen significant sector reforms in the last two decades in rural
water and sanitation sector with massive investment. Maharashtra is a leading
state in the country in adopting sector reforms especially in decentralization of
sector management and demand-responsive approaches in water and
sanitation. Maharashtra now faces emerging challenges especially in
demonstrating higher service levels in peri-urban villages including
establishing effective operation and maintenance system, and delivering safe
water in water quality affected areas, and in ensuring security of water service
year round in water stressed areas. Sustaining open defecation free status is
another major challenge along with the issues of solid and liquid waste
management.
Page 3 of 455
Government of Maharashtra has great hopes about Jalswarajya II
Program as this is the first of its kind project in the country with ‘PforR’
(Program for Results) instrument for implementation and disbursement. The
World Bank, in this program, will provide funds against performance
(achievement of priority outputs) to encourage the practice of achieving results
and strong focus on service improvement.
Keeping in view the importance of the program for the people living in
rural Maharashtra, the Program Manual for Jalswarajya-II has been prepared to
identify, plan, design, implement, operation & maintenance of various schemes
and components under this program. The program manual will give a brief view
of all the sector programs. The manual also serves as guide to identify the
responsibilities & results to be achieved within the timeframe.
I hope this Program Manual will enhance the efforts of different sector
institutes, staff and people to successfully achieve the results of Jalswarajya-II
Program in more organized and systematic manner.
(Rajesh Kumar)
Principal Secretary
Place: Mumbai Water Supply and Sanitation Department
Government of Maharashtra
Page 4 of 455
Ajay Savrikar Government of Maharashtra
Dy. Secretary and Project Water Supply and Sanitation
Director, RSPMU Department
PREFACE
Page 5 of 455
population through program interventions. For the first time in India a World
Bank aided program will be implemented using PforR (Program for Result)
instrument. Disbursement Linked Indicators will be used to measure the
performance/results.
The manual is a living document and presents scope and space for
continuous updation based on learnings and requirements as we go along
during Jalswarajya-II Program implementation. The effort has been taken to
prepare comprehensive and user-friendly document for the implementing
agencies and officials.
Sincerely,
(Ajay Savrikar)
Place: Mumbai Dy. Secretary and Project Director
RSPMU, WSSD, GoM
Page 6 of 455
Ajay Savrikar Government of Maharashtra
Dy. Secretary and Project Water Supply and Sanitation
Director, RSPMU Department
ACKNOWLEDGEMENT
The main objective of the program manual is to assist and guide various
sector institutions and staff to plan, implement and design program activities in
an organized and systematic way. The Program Manual will serve as practical
guide for Jalswarajya II program implementation and will be helpful for
achieving the goals and results effectively & efficiently within the timeframe.
Page 7 of 455
My sincere gratitude is also extended to Hon’ble Dr. Ms. Malini Shankar
and Mr. Sunil Porwal, former Principal Secretary, Water Supply and Sanitation
Department, who provided guidance & support during program planning. I also
thank Mr. Radheshyam Mopalwar, Former Member Secretary, Maharashtra
Jeevan Pradhikaran, Dr. Nipun Vinayak, Ms. Shaila A and Mr. Kiran Gitte, Former
Director, RSPMU, Mr. Dheeraj Kumar and Ms. Shweta Singhal, Former Project
Manager Jalswarajya Program for their immense contributions & efforts in
developing this program manual. Special Thanks to Mr. Dheeraj Kumar former
Project Manager who conceived the idea of sector development and
preplanning of Jalswarajya II program. Jalswarajya II being first PforR program
in India in Maharashtra has been successfully negotiated & measurable
disbursement linked indicators were finalized by the former Project Director
Ms. Shaila A. with World Bank PforR core team.
The preparation of this manual would not have been possible without
the greatest support provided by the World Bank team. Special thanks to Mr.
Neti Raghava, Task Team Leader, Ms. Mridula Singh, Ms. Priti Kumar, Mr. J.V.R.
Murty, Dr. D. Mohan, Mr. Manu Prakash, Mr. Tanuj Mathur, Ms. Kalyani Kandula,
Mr. Josses Mugabi and other members of the World Bank team for their support
and guidance in finalization of the manual.
Page 8 of 455
CURRENCY EQUIVALENTS
Exchange Rate Effective Date: 31 December, 2013
Currency Unit = Indian Rupees (INR)
US$1=INR 61.82
US$ 1 = SDR 0.64935
FISCAL YEAR
April 01 – March 31
Page 9 of 455
DPR Detailed Project Report RTI Right To Information
DWSM District Water and Sanitation RCMU Regional Coordination and
Mission Monitoring Unit
EDDP Environmental Due Diligence RWS Rural Water Supply
Plan
ESSA Environmental and Social RWSS Rural Water Supply and
Systems Assessment Sanitation
FSA Fiduciary Systems SAC Social Audit Committee
Assessment
GDP Gross Domestic Product SLPCC State Level Program
Coordination Committee
GoI Government of India SNM Sujal Nirmal Maharashtra
GoM Government of Maharashtra SO Support Organization
GP Gram Panchayat Sq. km Square Kilometer
GSDA Groundwater Survey and STA State Technical Agencies
Development Agency
GWMA Groundwater Management SWSM State Water and Sanitation
Association Mission
HR Human Resource ToR Terms of Reference
ICRR Implementation Completion TS Rechnical Sanction
Results Report
IDA International Development VWSC* Village Water and Sanitation
Association Committee
IEC Information, Education and WSP Water and Sanitation
Communication Program
JS 2 Jalswrajya 2 Program WSSD Water Supply and Sanitation
Department
MoDWS Ministry of Drinking Water WSS Water Supply and Sanitation
and Sanitation
M&E Monitoring and Evaluation WSSO Water and Sanitation
Support Organization
MEETRA Maharashtra Environmental ZP Zilla Parishad
Engineering Training and
Research Academy
MIS Management Information System
MJP Maharashtra Jeevan Pradhikaran
* In Maharashtra, VWSC has been renamed as VHNWSC (Village Health,
Nutrition, Water and Sanitation Committee).
Page 10 of 455
TABLE OF CONTENTS
CONTENTS
FOREWORD................................................................................................................................... 03
PREFACE......................................................................................................................................... 05
ACKNOWLEDGEMENT................................................................................................................07
PROGRAM SUMMARY................................................................................................................. 17
Page 11 of 455
B.3. Strengthening of MEETRA ......................................................................................................... 53
B.4. Strengthening of Sub-divisional offices ............................................................................... 53
3.2 Category 2: Water Supply and Sanitation Service Improvement Investments in
selected districts....................................................................................................................................... 54
3.2.1 RWSS in Peri-Urban Villages .................................................................................................. 56
3.2.2 Water Quality (WQ) Affected habitations ......................................................................... 65
3.2.3 Water Scarcity Villages ............................................................................................................. 68
3.2.4 Aquifer Level Water Management initiatives ................................................................. 70
CHAPTER 4: INSTITUTIONAL ARRANGEMENTS ................................................................76
4.1 Key Institutional Arrangements .............................................................................................. 76
4.2 Implementation Responsibilities ............................................................................................ 81
4.3 Institutional Arrangements: Roles and Responsibilities ............................................... 85
4.3.1. Institutional Arrangement at Village Level ..................................................................... 85
4.3.2. Institutional Arrangements at Block Level...................................................................... 92
4.3.3. Institutional Arrangements at District level ................................................................... 95
4.3.4. Institutional Arrangements at Regional level: ............................................................ 100
4.3.5. Institutional Arrangement at State Level...................................................................... 100
CHAPTER 5: FINANCIAL MANAGEMENT ............................................................................ 105
5.1 Financial Management for JS-II ............................................................................................ 105
5.1.1 Financial Management Framework ......................................................................... 105
5.2 Budgeting and Fund Flow........................................................................................................ 113
5.2.1 Budgeting ............................................................................................................................ 113
5.2.2 Fund Flow............................................................................................................................ 114
5.3 Accounting System and Procedures .................................................................................... 122
5.4 Audit Arrangements................................................................................................................... 123
5.5 Reporting and Monitoring ....................................................................................................... 124
5.6 The PforR Lending Instrument (PforR Financing) ........................................................ 125
5.7 Disbursement under PforR lending instrument ............................................................ 126
5.8 Training/capacity building plan: .......................................................................................... 126
5.9 User Cost Sharing Principles ................................................................................................. 126
CHAPTER 6: PROCUREMENT ARRANGEMENT ................................................................ 131
6.1 Sector Procurement Agencies ................................................................................................ 131
6.2 Procurement Procedures ......................................................................................................... 132
6.3 MIS for Procurement ................................................................................................................. 135
6.4 Capacity Building ........................................................................................................................ 135
6.5 Internal arrangement for review.......................................................................................... 135
Page 12 of 455
6.6 Grievance Redressal Mechanism .......................................................................................... 135
CHAPTER 7: MONITORING AND EVALUATION ................................................................ 137
7.1 Program Key result areas and Disbursement– linked Indicators - ........................ 137
7.2 Information Flow and Data collection ................................................................................ 141
7.3 M&E Implementation arrangements .................................................................................. 144
7.4 Roles and Responsibilities of M&E Cell ............................................................................. 144
7.5 Internal Evaluation..................................................................................................................... 145
7.6 Reporting Process....................................................................................................................... 146
CHAPTER 8: ENVIRONMENTAL AND SOCIAL MANAGEMENT RULES AND
PROCEDURES ..................................................................................................... 149
A. Environmental Management Rules and Procedures .................................................... 149
8.1 Environmental Audit.................................................................................................................. 158
B. Social Management Rules and Procedures....................................................................... 158
8.2 Guiding Principles of Social Management ......................................................................... 159
8.3 Institutional Responsibility for Social Management ..................................................... 161
8.4 Gender Strategy............................................................................................................................ 166
8.5 Capacity Building ......................................................................................................................... 167
8.6 Communication Strategy .......................................................................................................... 170
8.7 Operations, Maintenance and Withdrawal ....................................................................... 172
CHAPTER 9: GOVERNANCE AND ACCOUNTABILITY ...................................................... 173
9.1 RTI Mandate .................................................................................................................................. 175
9.2 Complaints to Zilla Parishads ................................................................................................. 176
9.3 Checks and Balances during Execution of Works .......................................................... 176
9.4 Social Audit Committees (SACs)............................................................................................ 178
9.5 Vigilance System .......................................................................................................................... 179
9.6 Grievance Redressal Mechanism .......................................................................................... 180
CHAPTER 10: PROGRAM ACTION PLAN (PAP) ................................................................ 181
ANNEXURE
ANNEXURE 1: MAP- Geographical Spread of Jalswarajya –II ................................................ 185
ANNEXURE 2: Village Selection Criteria for Peri urban GPs .................................................. 185
ANNEXURE 3: Certificate of Eligibility for Peri-Urban GPs .................................................... 189
ANNEXURE 4: Detail program Cost for Jalswarajya -2............................................................ 191
ANNEXURE 5: Strengthening of Water Quality Testing Laboratories - Public Health
Department.................................................................................................................. 207
ANNEXURE 6: GSDA - Strengthening of Regional level Chemical Laboratories ............ 213
ANNEXURE 7: Real Time Groundwater Level Data Monitoring ........................................... 223
Page 13 of 455
ANNEXURE 8 : Strengthening of Hydro-meteorological Station (HMS) ........................... 233
ANNEXURE 9 : Ground Water Level Monitoring Network ..................................................... 237
ANNEXURE 10: Solid and Liquid Waste Management ............................................................. 245
ANNEXURE 11: Peri Urban WSS DPR – Suggestive Design criteria .................................... 249
ANNEXURE 12: Scope of work for preparation of DPRs for Peri-Urban Water supply
scheme ....................................................................................................................... 251
ANNEXURE 13:DPR Checklist ............................................................................................................. 257
ANNEXURE 14: SCADA in Peri- Urban WSS .................................................................................. 257
ANNEXURE 15: Mitigation measures to address water quality issues in water quality
affected areas, along with service improvements ................................... 261
ANNEXURE 16: Aquifer Mapping and Community based Groundwater Management
.......................................................................................................................................................................... 269
ANNEXURE 17: Stekholders at different levels under JS II .................................................... 287
ANNEXURE 18: Staff Composition of various Implementation institutions ................... 293
ANNEXURE 19: Program Results Framework ............................................................................. 299
ANNEXURE 20: Disbursement-Linked Indicator Matrix ........................................................ 308
ANNEXURE 21: DLI Verification Protocol .................................................................................... 309
ANNEXURE 22: Bank Disbursement Table .................................................................................. 315
ANNEXURE 23: Definitions of the achievement of each DLI ................................................. 324
ANNUXURE 24: Indicators for Social Management ................................................................... 326
ANNEXURE 25:Format for Voluntary Donation of Land ......................................................... 328
ANNEXURE 26: Step-by-step Social Management procedures - Sub-Project Scheme
cycle ............................................................................................................................ 330
ANNEXURE 27: Sub-Project scheme Cycle – Peri-Urban Water supply and Sullage
Schemes ..................................................................................................................... 337
ANNEXURE 28: Sub-Project scheme Cycle –Rain Water Harvesting Stucture ............... 343
ANNEXURE 29: Sub-project scheme cycle - Aquifer Level Groundwater Management
Scheme ....................................................................................................................... 352
ANNEXURE 30: Sub-project Scheme Cycle–Water Quality Affected Habitations ......... 358
ANNEXURE 31: Engineering responsibility Matrix ................................................................... 364
ANNEXURE 32: Scope of work for preparation of a GP wise SLWM PLAN...................... 366
ANNEXURE 33: Staffing Details under Jalswarajya II ............................................................... 368
ANNEXURE 34: District Level Staffing under JS-II ..................................................................... 370
ANNEXURE 35: Report Template regarding complaint on Fraud and Corruption ...... 371
ANNEXURE 36: Terms of Reference for Jalswarajya-II Staffing .......................................... 376
A. Monitoring and Evaluation Consultant ................................................................................ 376
B. Independent Verification of Results- Consultancy Service.......................................... 383
Page 14 of 455
C. IT Specialist ...................................................................................................................................... 394
D. Knowledge Management Specialist ....................................................................................... 398
E. Assistant Infomation, Education and Communication Specialist (IEC) ................... 399
F. Social Support Organisation ...................................................................................................... 406
G. Environmental Management Specialist ................................................................................ 414
H. Social Management Specialist .................................................................................................. 420
I. Procurement Specialist ................................................................................................................. 424
J. Finance Specialist ............................................................................................................................ 430
K. Capacity Building Specialist ...................................................................................................... 436
L. Finance Controller ......................................................................................................................... 440
M. Management Information System Specialist ..................................................................... 446
N. Engineering Specialist (SLWM and WQM) .......................................................................... 450
ANNEXURE 37: Jalswarajya -2 Program Manual Contributers ................................. 451
Page 15 of 455
Page 16 of 455
PROGRAM SUMMARY
Program Objective:-
Program Categories:-
Page 17 of 455
Program description:-
Program Scope and Boundaries:-
GoM has an existing RWSS program that is fully aligned with and driven by
GoI’s National Rural Drinking Water Program (NRDWP) for water supply, and
Swachh Bharat Mission (Gramin) (SBMG) for sanitation. The overall objective of
GoM’s RWSS program is to increase access to safe drinking water and sanitation
services to rural communities at an affordable cost and in an environmentally
sustainable manner. GoM’s RWSS program is in line with the national vision and
goals, and also supports the constitutional mandate of strengthening
devolution. GoM has demonstrated its commitment to the objectives of its own
program by developing policies and guidelines to support execution of the
program, allocating requisite financial resources and putting in place
mechanisms to strengthen decentralized sector governance structures. The
time horizon of GoM’s RWSS program is 10 years (2012-2022), with a total
resource commitment of US$3.55 billion over 10 years (equivalent to US$3551
million or INR 2130 Cr per year)
Bank Support:-
The Bank will support a portion of the above GoM program over a 6-year period
(2014-2020) focusing on two primary activities: (i) State wide institutional
capacity building; and (ii) Developing implementation models for the remaining
and new challenge areas through physical investments for water supply
schemes in peri-urban areas, and water supply schemes in waterstressed and
water-quality affected areas, in selected representative districts across the
state, based on transparent, pre-defined, and demand-driven criteria.
Program Exclusions
The Program will exclude activities that, in the opinion of the Bank, are likely to
have significant adverse impacts that are sensitive, diverse, or unprecedented
on the environment and/or affect people; or involve procurement of: (i) works,
estimated to cost INR 300 Cr (US$50 million) equivalent or more per contract;
(ii) goods, estimated to cost INR 180 Cr (US$30 million) equivalent or more per
contract; (iii) non-consulting services, estimated to cost INR 120 Cr (US$20
million) equivalent or more per contract; and (iv) consultant services,
estimated to cost INR 90 Cr (US$15 million) equivalent or more per contract.
Physical investments that are excluded from the Program due to their high
environmental risks include: (i) schemes that involve construction or
rehabilitation of dams which are greater or equal to 10 meters in height; (ii)
groundwater–based schemes in over exploited and critical basins that do not
integrate source sustainability measures; and (iii) schemes involving highly
polluted surface water sources.
Page 18 of 455
Program Cost Estimates:-
Table 1: Program Cost Estimate
Page 19 of 455
2 Water supply and Sanitation Service Improvements Investments in
selected districts
1 RWSS (Drinking water supply 39 GPs 104.9 545.18
and Sullage Management)
Service Improvements in peri-
urban villages
2 Interventions in Water Quality 330 GPs/ 16.8 83.00
affected areas (Community Habitations
Safe Water Systems)
3 Interventions in Water 250 GPs/ 16.3 100.00
Stressed areas (Community Habitations
Secure Water Systems)
4 Aquifer Level Ground Water 30 Aquifers 16.3 100.27
Management initiatives
Sub-total 154.3 828.45
Total Base Cost 203.9 1123.21
Physical and Price 31.4 161.10
Contingencies (@7.5% per
annum)
Total Cost including 235.3 1284.31
Contingencies
Page 20 of 455
CHAPTER 1: INTRODUCTION
1. India has been one of the fastest growing economies in the last decade,
but its economy now shows signs of slowing down. During the period 2004-
2011, the Indian economy grew at an average of 8.3% per year, despite the
global financial crisis. Expanding social programs lowered the poverty rate by
1.5 percentage points per year in 2004-09, double the rate of the preceding
decade. India’s growth rate has however recently slipped to a nine year low of
6.5% in 2011-12 due to a combination of domestic and external factors,
including high inflation, high fiscal deficit and weak external demand for the
country’s exports. This slow down carries high social costs for millions of
Indians, and threatens the gains made in poverty reduction over the past
decade.
2. India’s recently published 12th Five Year Plan calls for major investments
in infrastructure, including water and sanitation, as one of the pathway to
increased growth and poverty reduction. Lack of adequate water supply and
sanitation facilities impact the health and economic well-being of millions of
Indians, especially those living in rural areas. According to the 2011 census of
India, close to 70% of India’s 1.2 billion people live in rural areas, and
contribute to about 40% of the country’s GDP. It is estimated that the total
economic impacts of inadequate water supply and sanitation in India is about
INR 2.44 trillion (US$53.8 billion) a year, equivalent of 6.4% of India’s GDP in
20061. This means an annual loss of INR 2180 (US$ 48) per person.
1
WSP (2007): The economic impacts of inadequate sanitation in India. WSP/World Bank, Delhi
2
Ref: data.worldbank.org
3
Reasonable access is defined as the availability of at least 20 litres’s a person a day from a source within one kilometre of the
dwelling.
4
Improved source is a household connection, public standpipe, borehole, protected well or spring, and rainwater collection.
5
Progress on Drinking Water and Sanitation, 2012 update, WHO/UNICEF
Page 21 of 455
(626 million) of the global population practicing open defecation live in India,
as of 20106 .
4. The Government of India (GoI) recognizes these challenges and finances
about US$3 billion annually in the Rural Water Supply and Sanitation (RWSS)
sector, to improve access to RWSS services. In addition to access, quality of
services and financial and operational sustainability are the other areas of
concerns for GoI in the sector. To give focus to the efforts in the sector, a new
ministry-Ministry of Drinking Water Supply7 (MoDWS) was created in 2011,
shifting the subject from the Ministry of Rural Development. Building on earlier
experiences, GoI has launched two main programs – National Rural Drinking
Water Program (NRDWP) for water (2009); and the Swachh Bharat Mission
(Gramin) (SBMG) for sanitation (2014). Through these programs, the Ministry
sets the policy directions for the states and also part finances the expenditure in
the sector. The priorities of NRDWP include ensuring drinking water security to
the rural community, meeting acceptable standards of quality, involvement of
Panchayati Raj Institutions8 (PRIs) and communities along with providing
support to capacity building programs, Water Quality Monitoring &
Surveillance Program and M&E systems. The priorities of the SBMG include
achieving complete village level sanitation through a ‘saturation’ approach (i.e.,
focus on accessand usage of household and institutional toilets, effective
handling of solid and liquid waste management, cleanliness and hygiene) and
strengthening demand and supply linkages for achieving clean status in the
villages.
6
Ibid4
7
http://mdws.gov.in/
8
Panchayati Raj is a system of governance in India, encompassing lower tiers of government, in which Gram Panchayats (GPs)
are one of the basic units of governance and administration at the village level and Zilla Parishards (ZPs) are at the district
level.
Page 22 of 455
got a 720 Km. long coastal line. The state is divided into six divisions-Konkan,
Pune, Nashik, Aurangabad, Nagpur and Amravati.
The state is divided into 3 physiographic regions. These are the Western Coastal
Tract (the Konkan), the hill ranges of the Western Ghats, which run in a North-
South direction parallel to the western coast and the Eastern area called the
Deccan Plateau. Nearly 81.5% of the geographical area of the state is occupied
by the geological formation of the Deccan Plateau. The major distribution of
rocks in Deccan Plateau are termed as Basaltic rocks deposited as different
layers of lava flows during the formation of Earth’s crust. By and large the
Deccan Plateau is distributed in most of the districts from Sindhudurg towards
West to Gadchiroli district in the East except Bhandara district. There are 28
States and 5 Union Territories in India
Water Resources
Page 23 of 455
increases from 700 mm. to 1000 mm. The Eastern most parts of the state
receive an annual rainfall between 1000 mm. to 1600 mm. Rainfall is highly
variable between years and droughts are recurrent.
3. Ground Water - Ground water has been the primary source of water
supply for domestic, agricultural and industrial uses in Maharashtra. It is the
single largest and most readily available source of irrigation and more than
50% of the total area under irrigation depends on ground water. Nearly 80% of
rural water supplies are based on ground water. Ground water availability for
drinking water is directly linked to the over all groundwater use in agriculture
as well as its management by the farmers, industries and urban users.
Groundwater over-use by the farmers is the result of declining performance of
surface irrigation projects and the desire of the farmers to have private
irrigation sources. This has led to mushrooming of dug wells/borewells/tube
wells resulting in large declines in groundwater levels, many watersheds
recording deficit water balance and large scale deterioration in groundwater
quality. This is mainly on account of the occurrence of hard rock formations
comprising the main groundwater bearing horizon, which occupy about 93% of
the geographical area of the state. The inherent heterogeneity and
comparatively low water yielding capabilities of hard rock compared to alluvial
aquifers pose the problem of sustainability of ground water resources. The
Konkan region, which receives 40% of the total rainfall in the state, quickly
drainsoff the precipitation received to the Arabian Sea due to high gradient
topographic condition and porous laterite soil formation. The rain shadow
areas, east of the Western Ghats ridge receives scanty and erratic rainfall. The
Vidharbha region even though receives moderate rainfall, is suffering from
water quality problems due to presence of fluoride, nitrate and salinity. The
intensive agricultural practices of growing crops like sugarcane, fruit crops etc.,
which require large quantities of water in the water scarce areas, are heavily
depleting groundwater sources. Thus drinking water sector has become
intricately linked to the happenings in the irrigation sector and many of the
negative consequnces have pronounced impact on the drinking water quantity
and quality. Thus it is incumbent on the rural drinking water sector to work
Page 24 of 455
closely with the irrigation department, groundwater department and other
related agencies.
9
This is more than the area (sq. km) of some countries like New Zealand (268,680), Italy (301230), Syria (185,180), Uganda
(236,040) and Philippines (300,000) etc., and is almost about the size of Vietnam (329,569)
10
There are a total of 36 districts in Maharashtra. Out of these, two districts viz Mumbai and Mumbai-Suburbs ate entirely
urban districts.
11
A GP typically will have 4-5 habitations, each habitation consisting of a group of houses typically varying from 10-100
households.
12
GoM, SBMG Annual Action Plan 2012-2013
13
Nirmal Gram Puraskar is a GoI promoted program to incentivize GPs to achieve ODF status, which involves toilet access
and usage at household, community and institutional level; and achievement of cleanliness at community level.
Page 25 of 455
annual income in the country at INR 87,686 (US$ 1460) while the national
average is INR 54,835 (USD 914)14. The GDP of the state increased fivefold from
the year 2000 (INR 2,386 Billion –US$ 40 Billion) to 2011 (INR 12,076 Billion-
US$ 201 Billion)15
4. Out of the total 100,712 rural habitations in the state, 87,132 are
supplied with 40 lpcd or more water and are officially considered as fully
covered. 13,580 habitations are partially covered with less than 40 lpcd service
levels are facing water quality problem. Even in those habitations, which are
treated as fully covered, the service levels are reduced during summer season.
As per Census 2011, 50.2% households are supplied tap water, 24.3% are
dependent on well water, 22.9% households use hand pumps or tube wells and
2.5% households are using other sources of water.
14
State/ GoI economic survey reports. It is assumed that one US$ is equivalent to 60 INR.
15
Data from Wikipedia report on Maharashtra at http://en.wikipedia.org/wiki/Maharashtra
16
Census of India, 2011
Page 26 of 455
5. Rural Water Supply Organisations - The key players in the rural water
supply scene of Maharashtra are:
Water Supply and Sanitation Department (WSSD)
Water & Sanitation Support Organisation (WSSO)
Maharashtra Jeevan Pradhikaran (MJP)
Ground Water Survey and Development Agency (GSDA)
Zilla Parishads (ZP)
Panchayat Samities (PS)
Gram Panchayats (GP)
Village Water Supply and Sanitation Committee (VWSC)
Maharashtra Environmental Engineering Training & Research
Academy (MEETRA)
6. Past Efforts in Rural Water Supply - GoM’s initiatives in providing
drinking water supply to the rural areas of the state can be summarised as
under:
a) From 1960 to 1970, focus was on providing only dug wells as the
drinking water source. Draw of water was mainly manual.
b) From 1971 to 1985, bore well technology was introduced and it became
possible to extract groundwater available at deep level. Highlights of the
era are as under:
Providing hand pumps and power pumps on bore wells
As on date around 2.2 Lakh hand pumps and 14,000 power pumps/
piped water supply schemes functioning in the state
Large scale digging of bore wells for irrigation purposes (around 20
lakhs bore wells dug) causes drying up of bore wells for drinking
water supply
About 90,000 community dug wells
Piped water supply schemes were not predominant
17
Maharashtra was the first state in India to come out with a White Paper on drinking water supply.
Page 27 of 455
d) Water supply program from the year 1997 to 2000 was implemented
under a state level master plan. Highlights of this era are:
Highest expenditure for regional and single village piped water supply
Schemes
Estimated cost of INR 7,300 crores
Till December 2002 expenditure INR 4,500 crores
As on date 1,907 on going schemes which require INR 1,750 crores for
completion.
e) Policy Reform era started in the year 2000. Highlights of the period since
the year are:
First state in India to adopt a state wide new reform policy in water
supply and sanitation sector
Demand-driven approach to delivery of rural water supply and
sanitation services
Use of participatory processes
Adoption of 10% capital cost sharing and 100% of O&M cost sharing
by beneficiaries
Shifting the role of Government from direct provider of service to that
of policy formulation and capacity support beneficiaries to participate
in planning, implementation and O&M offacilities
Emphasis on women involvement in water and sanitation related
decision making through VWSCs and Mahila Mandals
Introduced norms for social audit of the activities under the new
policy
A three pronged strategy was adopted for water conservation,
preservation and utilisation through increasing water supply,
managing demand and regulating over abstraction of ground water
Well-designed IEC campaigns to precede planning/designing of
schemes
Independent monitoring and evaluation studies by reputed
institutions
Human resource development activities or village level employees
Successful implementation of KfW, Germany assisted Aaple Pani
Projectin 3 districts (Pune, Ahmednagar & Aurangabad).
Successful implementation of World Bank assisted Jalswarajya Project
in 26 districts of the state.
Aligning all water supply programs in the states with National Rural
Drinking Water Program - NRDWP (Govt. of India)
Aligning all sanitation programs in the states with Swachh Bharat
Mission Gramin (SBMG) (Govt. of India)
Devolution of 100% powers to 3-tier PRI system
Page 28 of 455
1.3 Sector Challenges in Maharashtra
1. Despite this progress in the last decade, the state faces significant sector
challenges, mainly related to;
Service Delivery Standards: The service delivery in most cases is seen
to be weak, at best providing water supply for 2-3 hours a day,
breakdowns in services, with more than 50% still accessing water
through stand posts and other means.
Sustainability of Investments and Services: There is a significant
percentage of ‘slippages’ both in the water supply and sanitation sub-
sectors. A large number of GPs that have become Open Defecation Free
are slipping back from this status. Similarly, about 3-5% habitations
have slipped back to a ‘partially covered’ status every year in the water
supply sub-sector.
Sustainability of Groundwater Levels: More than 85% of the rural
water supply in Maharashtra is groundwater based. Groundwater levels
in the state are rapidly declining due to overdraft, triggered by
increased demand from agriculture and industry sectors. The
groundwater assessments18 reveal that out of a total of 1531
watersheds, 76 watersheds are categorized as overexploited i.e. ground
water development is more than 100% of the recharge19 and either pre
or post monsoon ground water levels are declining. 4 watersheds are
critical (GW development is in the range of 90-100% and both pre and
post-monsoon groundwater levels are decling) and 100 watersheds are
semi-critical (GW Development between 70-90% and either pre or post
monsoon or both groundwater level trends are declining). Out of total
353, ten blocks are overexploited, two are critical and 16 are semi-
critical. This is a critical issue and efforts are needed to introduce
demand management models in order to sustain schemes based on
groundwater sources.
Emergence of Large Peri-Urban Villages: With the rapid urbanization
process, a significant number of villages located in close proximity to
urban peripheral areas, are increasingly becoming urban in character.
The aspirations of these citizens are also closer to the urban water
supply and sanitation standards. GoM has come up with an innovative
policy (reflected in the Peri-Urban GR no NISHYO-1413/CR-88/WS-
07 11th Sept, 14) to address these needs.
Solid and Liquid Waste Management: The focus of the sanitation sub-
sector has so far been on achieving total latrine coverage and other
aspects like the Solid Waste Management (SWM) and Liquid Waste
18
Based on the data available from Ground-Water Survey and Development Agency (GSDA), GoM.
19
The over-exploited, critical and semi-critical categories are defined as per the Groundwater Estimation Committee Report,
Ministry of Water Resources, GoI, 1997.
Page 29 of 455
Management (sullage and septage) have been neglected. While these
issues are a concern in all villages, they are of critical concern in large
and peri-urban villages.
Institutional Capacity: GoM has almost fully devolved the RWSS sector
management to Panchayati Raj Institutions (PRIs), supported by state
level technical agencies such as the Maharashtra Jeevan Pardhikarn
(MJP) and Groundwater Surveys and Development Agency (GSDA).
There are significant capacity gaps across these institutions which need
to be addressed in a systematic manner.
M&E Systems: The M&E systems currently focus on monitoring of
inputs and coverage rather than monitoring the actual service levels
standards at household levels i.e., quantity, quality reliability and access
or adequacy of O&M cost recovery.
20
The total annual allocations under NRDWP are about INR 13,500 million (US$ 225 million) including the share of GoI and
GoM.
21
GoI defined household drinking water security as: To provide every rural person with adequate safe water for drinking,
cooking and other basic domestic needs on a sustainable basis. This basic requirement should meet minimum water quality
standards and be readily and conveniently accessible at all times and in all situations.
Page 30 of 455
Objectives and Description Components
dug well, bore holes (iv) source affected habitations
strengthening for sustainability
• O&M support for expenditure on
(iv) decentralized management
running, repair and replacement costs
with community participation
of water supply systems
22
Identified APL includes all SCs/STs, Small and Marginal Farmers, Landless Labourers with Homestead, Physically
Handicapped and Women Headed Households
Page 31 of 455
1.4 GoM and World Bank Partnership
1. The GoM and World Bank have a long standing partnership in rural
water and sanitation sector. This partnership builds on the World Bank’s
previous engagements in the State, most notably the recently concluded
Jalswarajya project (2003-09), which was instrumental in strengthening
decentralization and demand-responsive approaches in the sector. The
Jalswarajya Iimplemented by GoM with assistance from the World Bankhas
achieved good outcomes and the project has won “Peoples First” Award for the
global first position within the Bank in 2010. This project is the first one in India
in the RWSS sector to have conducted a scientific impact assessment study. The
study conducted midway through project implementation in 2005 and 2007
pointed to the positive impacts of increased access to water supply, increased
toilet usage, and reduced coping costs for village communities. Capital cost per
capita for The Jalswarajya-1 schemes was lower than that of other schemes in
Maharashtra (INR 1,043 in the Jalswarajya schemes as compared to INR 2,116–
2,346 in other schemes, resulting in a saving of about INR 1,188 per capital).
Page 32 of 455
Need for Jalswarajya-II
3. Building on the success of Jalswarajya I, a state wide initiative is needed
to scale up the learnings and address the emerging challenges including the
issues of peri-urban and water stressed areas. The initiative through
Jalswarajya II is needed for the following;
Scaling up of Aquifer Water Management pilot project
Provision of safe drinking water to water quality affected habitations
Community Secure Water Systems in small water scarce habitations
Provision of higher level of services to Peri-urban areas
Need for improvement in the efficiency of sector institutions
Creation of large network for water sample testing
The available lending instruments of the Bank so far are designed for specific,
transaction-based projects (such as reimbursement of expenditures as under
Specific Investment Loan (SIL)), or general budget support (such as under
Development Policy Loan (DPL)). After careful consideration of the
representations from client countries, the Bank has developed PforR, to support
governments more at programmatic level than at specific project level or at a
very broad policy level.
Page 33 of 455
strengthening the focus on the government’s own results and linking funds to
their achievements.
Apart from the DLIs, the program design will also include an over arching
results framework, to measure the program’s success; strengthening the
institutional capacity that countries need to achieve results and sustain
programs; and monitoring and evaluation mechanisms and building such
capacity.
Thus the entire shift in perspective from Jalswarajya-I to Jalswarajya-II is from
transaction level to overarching results and institutional capacity building at
the sector level.
4. This Program Manual is consistent with, and has to be read and applied
in conjunction with the other detailed manuals such as Procurement and
Financial Management Manual, Environmental Management Manual, Social
Management Rules and Procedures and the Legal Agreements (Program
Agreement and Financing Agreement) of JS II Program and other relevant
Government Orders (GOs). It shall be considered a ‘living document’ with room
for improvements and additions, with mutual consent of the Government of
Maharashtra and the World Bank. The Manual will be available online at
WSSD’s website https://water.maharashtra.gov.in/ and the latest version
shall be referred. The version control information is given in page 2,
immediately after the cover page.
Page 34 of 455
CHAPTER 2: PROGRAM SCOPE
1. GoM has an existing RWSS program that is fully aligned with and driven
by GoI’s National Rural Drinking Water Program (NRDWP) for water supply,
and Swachh Bharat Mission (Gramin) (SBMG) for sanitation. The overall
objective of GoM’s RWSS program is to increase access to safe drinking water
and sanitation services to rural communities at an affordable cost and in an
environmentally sustainable manner. GoM’s RWSS program is in line with the
national vision and goals, and also supports the constitutional mandate of
strengthening devolution. GoM has demonstrated its commitment to the
objectives of its own program by developing policies and guidelines to support
execution of the program, allocating requisite financial resources and putting in
place mechanisms to strengthen decentralized sector governance structures.
The time horizon of GoM’s RWSS program is 10 years (2012-2022), with a total
resource commitment of US$ 3.55 billion over 10 years (equivalent to US$
35523 million or INR 2130 Cr per year).
2. The Bank will support a portion of the above GoM program over a 6-year
period (2014-2020) focusing on two primary activities: (i) State wide
institutional capacity building; and (ii) Developing implementation models for
the remaining and new challenge areas through physical investments for water
supply schemes in large peri-urban areas, and water supply schemes in water-
stressed and water-quality affected areas, in selected representative districts
across the state, based on transparent, pre-defined, and demand-driven criteria.
The geographic coverage for physical investments is depicted in the Map in
Annexure 1; GoM has named the Bank assisted part of its RWSS Program as
Jalswarajya II or the JS II Program.
3. Program Exclusions: The Program will exclude activities that, in the opinion
of the Bank, are likely to have significant adverse impacts that are sensitive,
diverse, or unprecedented on the environment and/or affect people; or involve
procurement of: (i) works, estimated to cost INR 300 Cr (US$ 50 Million)
equivalent or more per contract; (ii) goods, estimated to cost INR 180 Cr
(US$30 Million) equivalent or more per contract; (iii) non-consulting services,
estimated to cost INR 120 Cr (US$ 20 Million) equivalent or more per contract;
and (iv) consultant services, estimated to cost INR 90 Cr (US$ 15 Million)
equivalent or more per contract. Physical investments that are excluded from
the Program due to their high environmental risks include: (i) schemes that
involve construction or rehabilitation of dams which are greater or equal to 10
23
In this report it is assumed that one US$ is equivalent to INR 60.
Page 35 of 455
meters in height; (ii) groundwater–based schemes in overexploited and critical
basins that do not integrate source sustainability measures; and (iii) schemes
involving highly polluted surface water sources.
The overall Program Development Objective (PDO) is; “to improve the
performance of Maharashtra’s sector institutions in planning, implementation
and monitoring of its Rural Water Supply and Sanitation program and to improve
access to quality and sustainable services in peri-urban villages, and in water–
stressed and water quality-affected areas.
1. Key Result Areas: GoM and the World Bank have agreed to use the PforR
lending instrument to concentrate World Bank financing in four key result
areas that contribute to the achievement of the PDO:
a. Result Area 1: Strengthened planning and monitoring in the RWSS
sector;
b. Result Area 2: Improved institutional capacity for RWSS program
implementation;
c. Result Area 3: Improved access to quality and sustainable water and
sanitation services in peri-urban villages; and
d. Result Area 4: Improved access to safe drinking water in water-stressed
and water quality-affected areas.
2. PDO Indicators: GoM and the World Bank have also agreed on a set of
outcome indicators that will be used to measure the achievement of the PDO:
Page 36 of 455
2.4 Program Scope and Activities
The scope of the program consists of two main categories. The details of these
categories are explained in Chapter 3.
The Key activities/groups of activities under the above categories are listed in
2.6 Table-4 below. A detailed description of each of the activities is given in
Chapter 3.
The WSSD will be the nodal department for the program. The Principal
Secretary, WSSD will be responsible for directing and monitoring
implementation of the JS II program and will ensure that the Program
Development Objectives are met in a timely manner. The program will be
delivered through existing water sector institutions and PRIs-WSSD, RSPMU,
WSSO, ZPs, DWSM Cells, BRCs, and GPs supported by MJP and GSDA (See
Chapter 4 for Institutional and Implementation arrangements). A Water and
Sanitation Support Organization (WSSO) was recently established under WSSD
for capacity building support in the sector, IEC and M&E activities, based on GoI
guidelines. WSSO will be effectively involved to support the program. GoM has
developed a range of manuals, guidelines and issued GRs which will be used by
the implementing agencies. References to them are covered in other sections of
this Program Manual.
Page 37 of 455
2.6 Program Cost Estimate
1. The overall cost of the JS-II Program and its breakup is given in the table
4 below. Details of these investments are captured in the Annexure 4.
Page 38 of 455
Category Activity / Intervention Quantity Cost Cost in INR
in Cr
US$ M
2 Water supply and Sanitation Service Improvement Investments in
selected districts
1 RWSS (Drinking water 39 GPs 104.9 545.18
supply and Sullage
Management) Service
Improvements in peri-
urban villages
2 Interventions in Water 330 16.8 83.00
Quality affected areas GPs/Habitations
(Community Safe Water
Systems)
3 Interventions in Water 250 16.3 100.00
Stressed areas GPs/Habitations
(Community Secure
Water Systems)
4 Aquifer Level Ground 30 Aquifers 16.3 100.27
Water Management
initiatives
Sub-total 154.3 828.45
Total Base Cost 203.9 1123.21
Physical and Price 31.4 161.10
Contingencies (@7.5%
per annum)
Total Cost including 235.3 1284.31
Contingencies
2. Financing Plan: The bank will finance 70% of the costs whereas GoM
and the communities together will finance the remaining 30%. The proposed
cost sharing is given in Table-5 below.
Page 39 of 455
Item Amount % of
(US$ Million) Total
1. The Bank and GoM have agreed to use the Bank’s new lending instrument
called PforR for the following reasons:
The development challenges in the RWSS sector outlined above can no
longer be addressed only through another discrete investment
operation, but require broader thinking and concerted actions at the
sector level,
Achievement of the program results requires building capacity of the
government systems including fiduciary, environmental and social
systems;
The objective, therefore, is to support the performance of the
government program using the government’s own systems to affect
changes in management practices.
Page 40 of 455
Bank’s finances would be used in JS-II Program have been agreed
between the Bank and the GoM.
b. Disburses upon achievement of program results: World Bank’s
disbursements will be determined by the achievement of verifiable
indicators, rather than by inputs. Such indicators are called as
Disbursement Linked Indicators (DLIs). An Independent Verification
Agency (IVA) hired by GoM will verify the achievements of results of
DLIs.
c. Focus on strengthening the institutional capacity: A priority area for
support will be to strengthen the capacity of the institutions to
implement the entire GoM’s program, hereby enhancing development
impact and sustainability. Program governance will be strengthened by
focusing on transparency, accountability, and participation. The idea is
to support the existing institutional and governance framework rather
than creating new institutions. These issues have been well addressed in
JS-II Program.
d. Provides assurance that Bank financing is used appropriately and
that the environmental and social impacts of the program are
adequately addressed. Such measures have been highlighted in this
Program Manual (Chapter 8).
Page 41 of 455
Page 42 of 455
CHAPTER 3: PROGRAM CATEGORIES DESCRIPTION
2. Capacity Building: The JS-II Program will strive to optimally utilize the
capacity of all the human resource available to the fullest and will undertake
activities to bridge gaps in knowledge and capacity building of human resources
available at Village Panchayat Level, Block Level, Zilla Parishad Level, Regional
Level and State Level (functionaries/Stake holders). The following Table 6
indicates the capacity development activities for different stakeholders:
Page 43 of 455
Table 6: Capacity Building Activities
Stakeholder Group Capacity Building Activities Responsibility
A. Developing and Strengthening Supply Side
I. RSPMU at state Specialized training in functional RSPMU, WSSO
level, MJP, GSDA, areas and MEETRA,
PHD (PH Labs), Identifying national and YASHADA
RCMU, Master international institutions and
Trainers at state networking
and district level Orientation workshops and field
visits
Page 44 of 455
Stakeholder Group Capacity Building Activities Responsibility
II. Gram Sabha Orientation on constitutional
importance of Gram Sabha, calling
and conducting meetings, relevance
of attendance etc.
Orientation on information sharing,
developing partnership, decision-
making etc.
Workshops/ training programs on
participatory techniques, appraisal,
consultation process,
documentation etc.
Orientation on inclusion, equity,
transparency etc.
Orientation workshops on Project
approaches and philosophy
Programs on working in
partnership with VP, VWSC etc.
Page 45 of 455
enable each agency/unit to perform their functions effectively, efficiently and in
a sustainable manner. This would also entail the following:
a) Establishing and operationalizing the existing Maharashtra
Environmental Engineering Training and Research Academy (MEETRA)
as a premier training institute for the sector. MEETRA will undertake
training and capacity building for all major sector stakeholders in the
following areas-modern planning, designing, engineering and O&M
management practices, contract management, related technical,
procurement, financial management, project management aspects,
adopting PPP models, leadership and teamwork, developing change
management approaches, improving organizational, operational and
financial performance of the PRIs and rural local bodies and, of the
service providers. The training programs could also cover: offering
distance learning courses, conducting ITI level diploma courses for key
areas such as water supply operators; one year diploma course on
Water, Sanitation and Hygiene (WASH), offering post graduate and
doctoral level programs in collaboration with reputed universities.
MEETRA will also explore identification of avenues for technology
promotion and upgradation, such as:(i) identifying requirements for
testing various elements in the RWSS sector (ii) mapping existing testing
infrastructure and gaps (iii) establishing state of the art laboratories for
undertaking necessary tests within MEETRA (either at Nashik or
elsewhere) (iv) identifying feasibility and developing a plan to make the
key existing labs accredited under National Accreditation Board for
Laboratories (NABL) certification and/or ISO certification (v) need and
feasibility for innovative product development and patenting;
b) Strengthening Groundwater Surveys and Development Agency’s (GSDA)
capacities for comprehensive monitoring of ground water quantity and
quality to enable better water security planning;
Page 46 of 455
include-safe handling of water, water conservation, cost of water, need for
good O&M for water supply schemes, benefits of good water supply, hygiene
seeking behaviour, benefits of maintaining and using latrines, benefits of
achieving and maintaining ODF status, benefits of active community
participation in all aspects of the program, systems available for complaint
redressal, systems available for seeking information on the program, project
cycles of the planned activities, social protection mechanisms, environment
protection mechanisms etc. Appropriate media such as-interpersonal
communications, print media, electronic media etc. will be used for these
campaigns. RSPMU will develop annual action plans for undertaking necessary
communication campaigns and implement them in collaboration with key
institutions like DWSM cells in ZPs, BRCs, SOs, print and electronic media, local
folk media etc.
Page 47 of 455
iv. Strengthening sustainable sanitation initiatives by improving SBMG
program implementation across the State, and addressing issues of
demand including behaviour change and supply chain for various
categories. Under the Program, SBMG will be particularly prioritized in
peri-urban villages where improved drinking water supply services are
planned for better sanitation outcomes as well.
1. Civil structure improvements for district and sub division level laboratories
of Public Health Department, for strengthening water quality monitoring and
surveillance capacity: The objective of this sub-category is to strengthen the
capacity of Public Health Department laboratories, by providing them
laboratory buildings (mostly as an extension of existing buildings), to house the
lab equipment and computer facilities (for water quality monitoring and
surveillance ), and provide for furniture.This will be done at state, district and
sub-divisional levels, for undertaking water quality testings as per GoI/GoM
defined protocols, thereby enabling effective control measures.
Page 48 of 455
4. GoM has recently expanded the existing Water Quality testing facilities
under NRDWQM&S by providing instruments and manpower support to Public
Health Department in the 138 SDPHLs. With these 138 SDPH Laboratories,
sufficient numbers of water testing labs are in place for regular testing of the
water samples from drinking water sources. Presently the operation of these
newly created 138 SDPH Laboratories are running from old structures in the
premises of Rural Hospitals. Under the sub- category, substantial amount has
been provided to these 138 laboratories so that a sufficient and comfortable
place will be available for regular testing of water samples. The construction
area is about 80 sq.m (Total area 100 sq.m) which is as per the standard norms
proposed under NRDWQ M&S protocol for establishing the Taluka level
laboratory by GoI. These laboratories will be built within the first two years of
the program. Contractual staffs for these laboratories have already been
recruited by PHD with the funding under NRDWQM&S. With the addition of
these labs the PHD will be able to meet the target set out in the water quality
monitoring protocols for the entire state.
5. A special cell under the PHD with financial support of the JS II program
has been created for monitoring the progress of these laboratories. An
estimated budget requirement of INR 21.07 Cr (base cost) and INR 22.54 Cr
with escalation, is necessary to implement the sub category. This will include
infrastructure cost including the civil construction at state level and Sub
divisional level and furniture at State, District and Sub divisional level
laboratories.
6. The methods which will be used in the program for Civil structure
improvement for district and sub district level laboratories of PHD are outlined
in Annexure 5 and Annexure 5A.
Page 49 of 455
operate all these instruments are being provided under NRDWP support funds.
The water samples which are having a higher degree of contamination, various
other pollutants, pesticides, heavy metals and those requiring highly precise
testing will be tested at the GSDA Pune Regional Laboratory. In spite of all the
instrumentation and manpower availability in these laboratories, a suitable
working environment is not available due to lack of infrastructure support.
These laboratories are also planned for NABL accreditation. Hence, proper
infrastructure facilities are needed. Under the JS II program, infrastructure
support for six regional laboratories is proposed.
Page 50 of 455
6. It is proposed to carry out strengthening of five existing Hydro-
meteorological stations by incorporating state of art instrumentation and up
scaling the facilities thereof to yield quality data that can be used especially in
Groundwater estimation, scarcity prediction and water balance studies.
Automatic weather stations also will be provided in all 10 HMS stations along
with conventional equipments. Basic infrastructure and equipments will be up
scaled to generate accurate and high frequency data at all 10 HMS.
7. The estimated budget requirement will be INR 2.74 Cr (base cost). The
activities planned under this sub category are:
i. Replacement of old Instruments
ii. Installation of new Instruments & Automatic weather stations
iii. Infrastructure development at existing or newly replaced HMS - Civil
Works
iv. Automation of data gathering set up &
v. Real time data sharing
Page 51 of 455
b) Design a low cost, sustainable mechanism for periodical monitoring of
Observation wells.
12. The proposed budgetary requirement of this sub-category is INR 4.66 Cr.
The activities proposed under this sub-category are:
a) Establishment of village wise observation well network. Rain gauges and
water quality monitoring arrangements preferably at village scale.
b) Manual and pilot level machine monitoring of groundwater levels,
rainfall and water quality by the assigned village representative followed
by direct submission to central server through web or SMS.
c) Establishing central server for data collection, compilation and analyses.
d) Developing a program/software/application for transmission, collection,
analysis, interpretation and periodic publishing of the data on website.
e) Designing a low cost sustainable mechanism for real time groundwater
level monitoring.
Page 52 of 455
13. The methods which will be used in the Program for Civil structure
improvement for district and sub district level laboratories under the PHD are
outlined in Annexure 5. The outlines of methods, which will be used in the
other activities proposed for strengthening of better handling the groundwater
management /monitoring is attached separately in Annexure 7.
1. Civil works and facilities for Strengthening of the state level training
institute in the sector Maharashtra Environmental Engineering Training
and Research Academy (MEETRA), Nasik -The objective of this sub-category is
to make MEETRA a premier training institute in the state in the RWSS sector, by
strengthening its infrastructure and other facilities. In parallel under the
technical assistance activities, the vision and strategy for developing MEETRA
into a Centre of Excellence will be prepared and implemented. MEETRA is an
autonomous sector training agency set up by the GoM. The GoM aims to
strengthen MEETRA to make it a Center of Excellence in training and applied
research. MJP and WSSO will support MEETRA in these efforts. Consultants and
architects will be appointed to chalk-out detailed strategy for strengthening
MEETRA and plan of action will be developed in the first six months and the
plan will be implemented in the first two years of the Program. A strengthened
MEETRA will be able to offer crucial capacity building support for the key
stakeholders, across the state.
Page 53 of 455
offices under 33 RWS Divisions in the State. It is proposed to provide assistance
for up-gradation of infrastructure in these offices, so as to make them better
equipped for handling water supply & sanitation issues. For implementation of
this category, the prevailing procedures in ZPs will be followed.
The EE, RWS Division will prepare the estimates for the up-
gradation of sub-division offices and accord Technical Sanction.
ZP will accord Administrative Approval
2. Detailed instructions regarding Implemention in the form of a Govt.
Circular have been issued vide No. JSP-02/CR-57/WS-11 dated 4th March,
2014.
Page 54 of 455
monitoring the groundwater management activities within the
aquifer/s.
Institutional capacity of the GPs will be enhanced to undertake the
coordination and facilitation roles for program implementation.
Gram Sabhas will be strengthened as platform for transparent
community level decision-making
The ZPs will be strengthened to undertake program implementation at
the district level.
The capacity of VWSC members on all aspects of source and technology
selection demand and supply side groundwater management
interventions will be strengthened.
The O&M aspects of the technology will be evaluated thoroughly before
choosing a particular option.
Gram Sabha attended by majority of the Benefiting Households will be
entrusted with the responsibility of deciding on the technological
options, capital contribution and O&M charges.
Inclusion of groundwater recharge and source strengthening measures
are expected to enhance the sustainability of the drinking water sources.
Water quality monitoring is an important sub-category of the program.
While preparing the VAP and later during implementation and operation
of the facility, the community will consider environmental issues and
will implement the mitigation measures for any adverse environmental
impacts.
Page 55 of 455
3.2.1 RWSS in Peri-Urban Villages
Page 56 of 455
generate revenues to meet the cost. A detailed note on implementation of liquid
waste management by sullage collection and treatment is contained in
Annexure 10.
5. Selection of GPs: Applications will be invited from eligible GPs and will be
evaluated on the basis of pre-defined criteria. A merit list will be prepared and
appropriate number of GPs will be selected for participation in the Program.
Although the Program will be implemented in the Peri-Urban areas, the actual
implementation will be done through the concerned VWSCs/ GPs with technical
assistance of ZP/MJP. The criteria for selection of GPs have been attached
separately (Annexure 2). The formats for the Certificate from Block
Development Officer are attached as Annexure 3. The District Technical
Committee will suggest formation of technically/ financially feasible clusters
out of selected GPs. This committee will work under the supervision of District
Program Co-ordination Committee. The final list of GPs will be approved by
District Program Co-ordination Committee and will be submitted for perusal to
the District Water Management and Sanitation Committee of Zilla parishad.
Page 57 of 455
7. Improved Service Levels-Improvements in service levels shall be
considered based on the following guidelines in Table 7. The expected
improvements in services can be explained to the community, during
community interactions.
Page 58 of 455
10. After a reconnaissance survey, preliminary technical assessment, initial
community interaction as per the Project Cycle and secondary data review,
prepare a ‘Scheme Planning Options’ with the following information:
Page 59 of 455
Table 8: Scheme Analyses
Page 60 of 455
Aspect What to analyze Remarks
4) Preparation of Computerized Item (4) will run parallel
database for each house and to to implementation of the
keep it updated. schemes, for which the
strategy and estimated
cost shall be presented
in the Reforms Strategy
Report.
Page 61 of 455
Sanitation The GP need not have sewerage system due Sullage
Action Plan to: a) non-availability of similar facilities in Management
the neighboring urban area; b) high capital scheme shall be
and operational cost of such schemes; and c) prepared
the technical skills required for O&M of such separately.
schemes.
But the GPs may have sullage management
facilities, with appropriate technical options.
In parallel, it is expected that sanitation
access in the form of improved toilet
coverage and Solid and Liquid Waste
Management are going to be covered under
SBMG program of the GoM. An integrated
action plan shall be presented in the Reform
Strategy Report, combining all efforts.
12. Once the reform strategies are clear as per the analysis, the costs of
various activities, and their implementation plans and timelines along with
costs shall be prepared as part of Reforms Strategy Report to be included in the
DPR. At this stage, a clear agreement shall be confirmed (see Social
Management Rules and Procedures for format) with the community on the
following aspects:
Preferred option, scheme layout and service levels,
Agreement for multi-GP scheme if any;
Standards-100% house connections with meters;
Agreement with urban area for sharing of water and payment for bulk
water;
Estimated cost of scheme including O&M costs;
Community contribution for capital, tariffs;
Confirmation and modalities for getting land during implementation;
Implementation timelines, implementation arrangements, community
obligations during implementation; and
Options for O&M management, community obligations during O&M.
13. Prepare a Detailed Project Report and Bid Documents- After the
above step, necessary detailed technical designs, financial analysis,
Environmental Due Diligence Plans and Social assessments shall be taken up.
Each aspect is detailed below:
a. Technical Designs: For the top ranked option, detailed engineering shall
be taken up along with the implementation of reform actions as per the
Reform Strategy Report. The detailed technical information of the scheme,
cost estimates, procurement and implementation plans (as revised from
Page 62 of 455
Step-1), and final O&M arrangements shall be presented in the DPR. Along
with the DPR, necessary bid documents shall be prepared.
Page 63 of 455
Sanction and then Administrative Approval will be given by Competent
Authority.
16. Agency for Implementation of DPRs- Actual implementation of
hardware category will be as per prevailing delegation of powers. The designs
shall be based on NRDWP guidelines and the suggestive list of design norms
given as Annexure 12. A responsibility matrix of all engineering activities for all
project categories is attached as Annexure 31.
RSPMU will have (a) a Special Monitoring Cell (Technical) to review the DPRs
and all other planning and implementation issues concerning the project works;
(b) an Independent construction quality surveillance consultancy reporting
directly to the Project to monitor all works including crucial items like hydro
testing, performance of pumps and WTP etc.
General Conditions
Efforts will be made for convergence with SBMG for solid waste
management (SWM) and construction of toilets.
Popular contribution will be paid by the GPs as per the prevailing
policy.
GP will be responsible for obtaining relevant permissions from
Forest Department, MSEDC, Water Lifting Permission, etc. The
implementing agency will facilitate this.
Operation and Maintenance
After the completion of the scheme, the responsibility of O&M will
rest with the concerned GPs. The GPs will meet the expenditure of
O&M through water tariff collections and any subsidies from Central
and State Government.
Initially the construction contractors who are implementing the
scheme will be responsible for O&M for five years after completion
of the scheme. Provision for O&M cost for 1st year will be made in the
DPR. For remaining 4 years, the cost will be recovered through
water tariff.
The GP will be responsible to charge water tariff as proposed in DPR
or a tariff sufficient to meet the O&M costs, whichever is higher. GPs
failing to do this will not be eligible for O&M Incentive Fund.
Budget: The estimation for this category is INR 588.0 Cr. (Net) and 617.84 Cr
(Gross- including provision for price escalations due to various reasons). The
costs for preparation of DPRs for Reforms, Implementation of Reforms,
preparation of DPRs for Water Supply & Sanitation services, charges payable to
preparation/implementation agencies etc. are included in this provision.
17. Detailed instructions regarding Implementing Agency (District Program
Coordination Committee, District Technical Committee), Planning (Selection
Criteria, Selection Process), DPR Preparation, Pre-Appraisal, Approvals,
Tendering, Implementation, O&M, Fund Flow, DLIs etc. in the form of a Govt.
Page 64 of 455
Circular have been issued vide No. JSP-0214/CR-55/WS-11 dated 11th June,
2014.
Page 65 of 455
Based on such a trend Analysis critical water quality contaminants shall
be identified along with other associated parameters showing rising
trends (fluoride, chloride, iron, nitrate, bacteriological, pesticide residue,
heavy metals etc). The effort will be assess the causative factors for the
increasing trend as well as to locate all the various aquifers that are
exposed to contamination. The regional extent of the contamination also
understood.
6. Implementation of DPRs
In case of Non-Conventional measures, GSDA will plan, approve and
implement these measures as per prevalent guidelines.
In case of Conventional measures, GSDA will facilitate preparation,
approval, and implementation, supervision of works through the
respective Zilla Parishad level agencies like Rural Water Supply
Page 66 of 455
Division, Minor Irrigation Division and Agriculture Department, as per
the prevalent guidelines.
For technological options, RSPMU will constitute a committee for
development of guidelines for implementation & Procurement.
Popular contribution will be paid by the GPs as per the prevailing
policy.
7. Other activities
Raising the awareness of the communities in water management
practices through PRA/IEC activities and during the preparation of the
Detail Project Report (DPR).
The Direct Measures of artificial groundwater recharge i.e. Non-
Conventional measures will be implemented through GSDA and other
Conventional measures will be implemented through by the RWSD
Zilla Parishad.
NRDWP Guidelines will be followed for the implementation of this
category
In case if other habitations in the same GP are likely to get affected by
the same water quality problems, the same will be tackled under
NRDWP. Since, DLI’s are proposed on safe and secure Water Supply
System hence under JS-II only those habitations will be tackled, which
are selected on the predetermined criteria. The remaining habitations
if any, under same GP which are suffering with the same water quality
problem, will be tackled on priority under the National Rural Drinking
Water Program.
9. Budget: The estimated allocation for this sub-category is INR 83.0 Cr.
(Net) and INR 95.07 Cr (Gross- including provision for price escalations due to
various reasons). The costs for preparation of DPRs for short term and long
term are included in this provision.
10. The outlines of methods, which will be used in the project for
Interventions in Water Quality affected area (Community safe Water system are
outlined in Annexure 15.
Page 67 of 455
3.2.3 Water Scarcity Villages
Applications will be invited from the GPs having habitations with current
population less than 500 through open advertisement
DPCC will evaluate the applications on the basis of predetermined
criteria.
The list will be approved by the DWSM (DWMSC) of the district.
Top GPs from the Merit List will be selected for inclusion in the program.
The No. of GPs will be as per the directives of WSSD from time to time.
The likely GPs will be requested to enter into an agreement (OFA) with
the ZP.
Page 68 of 455
Increase locally available source by recharge through Rain Water
Harvesting,
Assess non-rainy days and rainfall pattern,
Decide storage capacity based on non-rainy days and existing source
capacity,
Where land is available, a separate RCC storage reservoir will be
constructed
A small tank will be constructed on the downstream side of main storage
tank for supplying water equal to daily demand of water at 20 lpcd. GP
will ensure that the small tank is filled only once a day, so as to supply
water for non-rainy days as designed.
Provide disinfection for the daily drawn quantity,
Wherever feasible and based on community demand the existing PWS, if
any, will be rehabilitated to provide for the community with service level
of 40 lpcd in rainy days.
Senior Geologist, GSDA will issue a separate certificate for each
habitation/GP, which will contain the information about the points
mentioned above.
Priority No. 3-Pumping water from bore/dug well: In case there is no year
round source, then water from the local neighbourhood bore well / dug well
may be used to pump into the storage tank during scaricty periods. Alternative
energy sources for pumping water should be ecplosted as part of the solution.
Page 69 of 455
General Conditions
Efforts will be made for convergence with SBMG for solid waste
management (SWM) and construction of toilets.
Popular contribution will be paid by the GPs as per the prevailing policy.
GP will be responsible for obtaining relevant permissions from Forest
Department, MSEDC, Water Lifting Permission, etc. The implementing
agency will facilitate.
VWSC/ GP will be responsible for 100% O&M after completion of the
Tank
7. Detailed instructions regarding Implementing Agency (District Program
Coordination Committee, District Technical Committee), Planning (Selection
Criteria, Selection Process), DPR Preparation, Technical Options, Approvals,
Tendering, Implementation, O&M, Fund Flow, DLIs etc. in the form of a Govt.
Circular have been issued vide No. JSP-02/CR-56/WS-11 dated 4th March,
2014.
Page 70 of 455
4. All the data gathered shall be used in the development of Aquifer
Sections on 1:10000 scale. Based on the section specific wells shall be used to
conduct Aquifer Performance Tests, depth sampling of water. The Groundwater
Level Data shall be analysed aquiferwise and the data systematically analysed
to study the characteristics of individual aquifers.
5. In order to implement PGM as part of JS II, number of installtions shall
be carried out including watershed level rain gauges, new Community
observation wells (belonging to private farmers), stream flow discharge sites
shall be installed under the supervision of GSDA. All the measuring stations
shall be monitored and maintained by the GP and the construction made by ZP.
6. GP level groundwater monitoring institution shall be federated at the
aquifer level as a legal body to manage PGM, conduct annual water budgeting
workshops as well as implement ground water governance in accordance with
the latest ground water development and management act.
7. All GP’s shall be provided with data recording equipments such as water
level indicator, water quality probes, Pumping discharge measurement units,
record books.
8. All data shall be entered on a public view notice board at the village
centre and the data computerised by the SO. The data shall be the property of
the GP and commercially shared with agencies with whom agreement shall be
entered into.
9. Data collection volunteers (women, youth) shall not expect any
remuneration and will be responsible for collection of rainfall, groundwater
level, groundwater pumping, crop water use, crop adoption and drinking water
related data gathering.
10. Rabi and Kharif Crop adoption shall be gathered for the entire GP and
the crop water demand measured.
11. Annual water budget shall be conducted as a workshop and the
groundwater situation understood at the aquifer and GP level.
12. GP and Aquifer Federation shall be responsible for managing the
available groundwater in the most efficient fashion without sacrificing on the
economic needs and environmental concerns of the community.
13. Physiacal interventions such as Recharge, hydrofracuring, catchment
management shall be carried out based on systematic technical appraisal by
GSDA. IEC & Capacity Building: DWSM units will help GSDA in sensitization of
the community. A Support Organization will be appointed by DWSM to help
DWSM and GSDA in the activities.
14. Technical Investigations: GSDA will carry out necessary
technical/hydro-geological investigations in order to delineate the aquifers.
15. Grampanchayat Level Committee: After delineation of the aquifer, in
all the villages included within the aquifer, the VWSC constituted by the
Gramsabha, will be responsible for all the project interventions.
Page 71 of 455
16. Aquifer Fedration Level Groundwater management Association
(GWMA): Aquifer federation shall be formed after the aquifers are dlineated by
forming federation of GP part of the aquifer. Aquifer shall be registered as a
legal entity and will co-ordinate with line daprtments, government programs
and shall be eligible to receive government grants/funds. Once the aquifers
have been delineated, an aquifer level committee will be formed from the
VWSCs and will be strengthened to manage the available groundwater. GSDA
will facilitate formation, registration and functioning of this committee as per
the provisions in the proposed Maharashtra Groundwater (Development and
Management) Act 2009. (Details as in Annexure: 16 for Aquifer Management)
17. Physical interventions: GSDA and Rural Water Supply Division, Zilla
Parishad will prepare DPRs based on groundwater management action plan for
each GP in consultation with GWMA & VWSC, so as to achieve requisite
recharge of the aquifers. Actual implementation of works will be as per
prevalent GoM policies.
Page 72 of 455
Timeline Schedule of JS-II
2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Component Batch GP
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Peri-Urban GP 39 1 2 3 4 5 7
Aquifer 30 1 6 3 4 5 7
1 165 1 6 2 3 4 5 7
WQ Interventions
2 165 1 6 2 3 4 5 7
SPHL 1 1 1 3 4 5
DPHL 1 29 1 3 4 5
PH Labs
SDPHL 1 138 1 3 4 5
GSDA Labs 1 6 1 3 4 5
LEGEND
Selection 1
Reforms 2
Tendering/DPR 3
Implementation 4
O&M and Exit 5
Hydro-geological Investigations 6
Impact Evaluation 7
M&E system plan 8
Design and Teasting 9
Development of M&E system 10
Page 73 of 455
Page 74 of 455
Page 75 of 455
CHAPTER 4: INSTITUTIONAL ARRANGEMENTS
R
S
Page 76 of 455
2. The RWSS sector is managed by WSSD at the State level. Maharashtra’s
institutional structure is largely decentralized with responsibility delegated
from the state, to the district Zilla Panchayats (ZPs) and to Gram Panchayats at
the village level. The JS-II program will follow the existing institutional
structure, with additional capacity building where needed. Also, the JS-II
program aims to strengthen the existing institutional structure across the state
to enhance the state wide RWSS sector management capacity. The Table 10
below summarizes the key institutional responsibilities for the program
implementation.
Page 77 of 455
Maharashtra Jeevan Design and execute water supply and sullage
Pradhikaran (MJP) projects in peri-urban villages, as per GoM
norms, through district offices.
Implement and monitor institutional capacity
building activities in Maharashtra
Environmental Engineering Training and
Research Academy (MEETRA) and within
MJP.
Identify and address environmental issues
based on environmental and social
management rules and procedure adopted by
GoM under JS-II program
Ground Water Manage GSDA institutional and technical
Surveys and capacity building activities, agreed under JS-
Development II program.
Agency (GSDA) Design and execute the Aquifer Level
Groundwater Management Initiatives,
various measures for improving water
quality.
Be a part of the overall program
management through active participation in
various committees at state, region and
district levels.
Public Health Manage construction of Sub-Division
Department (PHD) Laboratories and renovation of conference
hall at State Public Health Laboratory, Pune,
furnish all the 29 District Public Health
Laboratories
State Level Program Headed by Principal Secretary, WSSD.
Coordination Monitor and guide activities of the above
Committee agencies
Page 78 of 455
Regional Headed by the Divisional Commissioner
Coordination Monitor the progress of all RWSS programs
Committee (RCC) within the region and provide guidance and
support as required
REGIONAL LEVEL
Page 79 of 455
Support Implement capacity building of GPs/ VWSCs/
Organizations (SOs) GWMAs and undertake IEC activities in peri-
urban villages and villages where aquifer
water management activities are undertaken.
District level Headed by the Chief Executive Officer, ZP.
Program Monitor and guide planning and
Coordination implementation activities of the above
Committee organizations at district level, coordination
and according approvals wherever
necessary.
Block Resource Provide technical support to GPs, VWSCs
Centers (BRCs) BLSCs and GWMAs for organizing capacity
BLOCK LEVEL
Page 80 of 455
4.2 Implementation Responsibilities
1. The following Table 11 summarizes the program category wise
implementation responsibilities of the various institutions:
Table 11: Implementation responsibility
Sl Category Implementing Support Monitoring
No Description Agency Agency Agency
A Physical investments for RWSS service improvement and ground water
strengthening (called Hardware Category)
(1) In peri-urban MJP District DWSM Cell Special
villages to offices / RWS will provide Monitoring cell
demonstrate Div, ZP in support for (Tech) will
higher service coordination software coordinate and
levels with ZPs; activities. SOs report to
will be hired RSPMU, MS MJP
for Social and PD
aspects as per
requirement
PMCS Div. of
MJP or
Independent
Consultancy
firm will
support for
reform
activities.
(2) Community safe water supply schemes
(a) Mitigation ZP, RWS GSDA will RSPMU will
measures to Division and work on monitor on
address water GSDA groundwater progress
quality issues in recharge WSSO will
water quality methods monitor
affected areas, issues and implementation
along with service citing of civil of software
improvements; structures. activities
GSDA will
implement all
non-
conventional
measures as
required.
RWS
divisions/ sub-
divisions will
work on civil
Page 81 of 455
Sl Category Implementing Support Monitoring
No Description Agency Agency Agency
works design
and execution,
as required.
DWSM Cell
and BRCs will
support on
software
activities
(b) Measures to ZP, RWS Water RSPMU will
address water Division Resources monitor on
scarcity in Department progress
summer months, will advise on WSSO will
particularly in rainfall and monitor
remote GSDA will implementation
habitations, along advise on of software
with service groundwater activities
improvements. availability
and scarcity
issues
RWS
divisions/
subdivisions
will work on
civil works
design and
execution
DWSM Cell
and BRCs will
support on
software
activities
(3) Community based GSDA district DWSM Cell and RSPMU will
Aquifer Level offices SOs will be monitor on
Groundwater support for progress
Management software WSSO will
initiatives activities. monitor
RWS, Div. and implementation
line of software
departments activities
will provide
technical
guidance.
Page 82 of 455
Page 83 of 455
B Physical investments against the following activities, to strengthen the
capacity of existing institutions (called Other Hardware Category):
(1) Construction of DPHLs Infrastructure RSPMU will
buildings for Sub- Development Wing monitor on
Divisional under National progress
Laboratories. Rural Health
Renovation of Mission.
Conference hall at SPHL
State Public Health -------“--------
Laboratory. SPHL
Procurement of Procurement Cell,
Modular Type Directorate of
Furniture for SDL and Health Services,
DPHL Mumbai
(2) Civil works for labs, GSDA PWD RSPMU will
HMS, Equipment and State monitor on
facilities for office/ progress
strengthening of GSDA Cell
laboratories and GSDA
strengthening
(3) Civil works and facilities MJP Consultancy firms Special
for Strengthening of Statemay be hired as Monitoring Cell
MEETRA office/
needed. (Tech.) will
coordinate and
report to both MS
MJP and RSPMU
C Technical Assistance and Capacity Building of sector institutions (called
Software Category)
(1) All software activities, WSSO/ Consultancy firms RSPMU will
including M&E, RSPMU to be hired as monitor on
Institutional needed progress
Strengthening, Water
Quality Monitoring and
Surveillance
Page 84 of 455
4.3 Institutional Arrangements: Roles and Responsibilities
1. Gram Panchayats (GPs) are the lowest tier in PRIs and are responsible
for implementing different development schemes at the village level. The GPs
are constituted through election of its members and are headed by a Sarpanch.
Gram Sevak, a Government official, carries the administrative duties of the
Village Panchayats. Gram Sabha is the General Body constituted by all the voters
in the village. The Village Health Nutrition Water supply and Sanitation
Committee (VWSC) is a sub-committee of the GP and is elected by the Gram
Sabha, as per provisions in the Bombay Village Panchayats Act. The Act also
provides for the formation of a Beneficiary Level Sub-Committee (BLSC) as and
when required. Water Supply schemes under the JS-II Program will be
implemented at the village level through the VWSCs and GPs.
2. Considering the scale of activities under the JS-II Program, an Assistant
to Gram Sevak will be locally hired on contract. It will assist Gram Sevak, Gram
Panchayat and VWSC for organizing all project related activities and
maintaining all records of the JS-II projects in their respective villages.
Page 85 of 455
3. The following are the specific roles and responsibilities of the
institutions at the village level:
24
Bombay Village Panchayats (amendment) Act 2002
Page 86 of 455
6. The Gram Panchayat:-It is a constitutional body incorporated as the
Local Self Government under the Constitution of India and the Bombay Village
Panchayats Act, 1958. It will be the focal point in the implementation of the
program at the village level.
Page 87 of 455
Inform Gram Sabha, Panchayat Samiti and ZP about the important
activities taken up by VWSC and other committees.
Liaise and maintain communication with BRC, DWSM Cell, Panchayat
Samiti, ZP, MJP, GSDA and other agencies as per requirements.
Take up the role of VWSC under extraordinary situation on the directives
of Gram Sabha.
Coordinating all activities necessary for maintaining Water Quality and
also mitigation measures.
Page 88 of 455
progress report on all aspects covering project implementation for the
information, review and approval of the Gram Sabha through GP.
To supervise and monitor activities of SOs, consultants and contractors
engaged for project implementation in the village on behalf of the GP.
To plan and implement institutional and behaviour change IEC activities
in collaboration with the BRC & DWSM Cell.
To collect the capital contribution from among the beneficiary members
as approved by the Gram Sabha.
To maintain and operate the Bank accounts on behalf of the GP through
persons authorised the Gram Sabha from amongst the VWSC members.
Such accounts shall be maintained in formats prescribed by WSSD from
time to time.
To prepare documentations, with the help of implementing agencies, on
completed water supply and sanitation facilities, preparing expenditure
statements, completing books of accounts and other records on behalf of
the GP and submit to the Gram Sabha for approval.
To operate and maintain, or facilitate operations and maintenance of the
water supply and sanitation facilities and collect user fees from the
beneficiary members as approved by the Gram Sabha.
To recommend to the Gram Sabha water resources management and
Water Quality measures; including conserving and regulating water
resources and implement such measures with the approval of the Gram
Sabha.
To constitute with the approval of GP different sub committees required
to undertake various functions (e.g. Finance Sub-committee,
Procurement Sub-committee etc.) for smoothening project
implementation. The membership of such a working group/sub-
committees will not be more than 4 members, out of which at least 1
must be a GP member. At least 50% of the members shall be women and
each working group can select a coordinator. The working groups will
report to the VWSC and work under their direction.
To execute contracts and procure materials and services on behalf of the
GP as approved by the Gram Sabha.
Page 89 of 455
11. Social Audit Committee (SAC):-The GP and VWSC have the necessary
freedom to execute the decisions of the Gram Sabha; the same will be
monitored by Social Audit Committee (SAC) appointed by the Gram Sabha, as
per WSSD guidelines.
12. Roles and Responsibilities of SAC: The SAC is a self-check and internal
monitoring mechanism for the Gram Sabha and the GP on the activities of the
VWSC and other sub-committees. It carries out its monitoring and social audit
activities continuously along with project implementation with an objective of
timely correction of mistakes. The social audit covers all aspects of the project
and service delivery, including social, economic, financial, technical, process-
related etc. The specific roles are:
To oversee the functioning of the VWSC and its various sub-committees
in order to ensure that they carry out their roles and responsibilities in a
just and fair manner and not violate the core principles of the project-
inclusion, equity, cost-effectiveness, transparency, environmental
soundness.
To conduct a detailed scrutiny of discrepancies or deviations observed
(in actions or decisions) and report the findings along with
recommended remedial measures to the Gram Sabha.
To request GP to convene special Gram Sabhas to discuss findings of the
social audit, which are of very serious nature. The report of the SAC, as
approved by the Gram Sabha will be forwarded by the GP to the DWSM
Cell. Such reports will be uploaded on WSSD Website and will be made
available to any member of the Gram Sabha on request and on payment
of a fee. The important findings in the report will be prominently
displayed on notice board of the GP at least seven days in advance of the
Gram Sabha.
The Gram Sabha’s discussing the social audit report shall not be chaired
by the Sarpanch, if he/she is a member in VWSC or any of its sub-
committees. In such cases the Gram Sabhas shall be chaired by the
Chairperson of the SAC, as per VP Act/WSSD.
To assist the Gram Sabha in settling disputes and resolving conflicts at
the village level.
Page 90 of 455
14. Roles and Responsibilities of GWMA: The GWMA is solely responsible
for the all the activities to be carried out under the Aquifer Level Groundwater
Management initiatives. The specific roles are;
a. Organize group/s of the members of GWMA for collection and
compilation of basic data and monitoring groundwater conditions in
each village.
b. Collect rainfall data.
c. Identify a member of VWSC or a volunteer group within the Gram
Panchayat for measuring and recording daily rainfall every year.
d. Identify a member of VWSC or a volunteer group for measurement of
water levels in observation wells in the aquifer and monitor changes in
water levels.
e. Estimate demand for groundwater for drinking and domestic use in each
Gram Panchayat.
f. Facilitate and assist VWSC in estimation of groundwater recharge and
groundwater availability for Kharif and Rabi seasons.
g. Allocate available groundwater for different uses like agriculture,
domestic and industries, in consultation with GSDA.
h. Organize workshop for VWSC members on crop water budgeting using
basic data on groundwater, irrigation requirement of different crops and
other secondary data.
i. Surveillance against high water consuming crops and control
groundwater overuse.
j. Facilitate the farmers in analyzing the soil samples, water quality etc.
k. Networking with VWSCs and GSDA.
l. Decide and collect O&M charges from the community.
m. Support VWSCs to enhance its management capacity and assist them in
book keeping and maintaining other registers.
n. Mobilize community contribution for O&M of the groundwater recharge
structures executed by the community including those constructed by
other agencies for water conservation and artificial groundwater
recharge.
o. Supervise and actively participate in the community based aquifer level
groundwater management in the aquifer.
p. Undertake management and O&M of the groundwater recharge
structures executed by the community from the charges collected from
the community as per the rates decided jointly by GWMA and VWSC &
accepted by the community in the Gram Sabha.
q. Assist VWSCs in preparation of Groundwater Use plan and crop plan
every year.
r. Prevent encroachment on and near the groundwater recharge
structures.
s. Perform any other functions to accomplish the objective of the project.
t. Conduct election of office bearers of GWMA.
Page 91 of 455
4.3.2. Institutional Arrangements at Block Level
1. The Panchayat Samiti (PS) is the 2nd or middle tier of PRIs. The PSis
constituted through elections and is chaired by the Sabhapati (Chairman). Block
Development Officer (BDO) is the Administrative head of a PS.
2. The Block is the closest unit to the GPs and provides support through the
following institutions.
Panchayat Samiti
Block Resource Centre (BRC)
RWS Sub-division Office
MJP Sub-Division Office
Sub-Divisional Laboratory, PHD
Primary Health Centre (PHC)
Page 92 of 455
5. Block Resource Centers (BRCs):-BRCs were formed in 2011 to offer
greater support to GPs/VWSCs for implementation of WATSAN Programs at
Village levels. The BDO is the head of the BRCs and consists of one Block
Coordinator and 2-3 Cluster Coordinators. One of the Extension Officers in the
Panchayat Samiti will function as administrative head of the BRCs.
7. Rural Water Supply (RWS) Sub-Division: There are about 173 RWS
sub-divisions for the 351 blocks in the state. Each sub-division looks after
technical aspects of the RWSS programs in 2-3 blocks. The RWS Sub-division
works under the supervision of the RWS division office in the ZP. Their main
role is to support VWSCs/GPs in technical aspects such as; need identification,
identifying options, developing a plan and estimate based on the option selected
by Gram Sabha, supervise civil works, check running bills of contractors. The
RWS Sub-division also supports VWSC/GPs on technical issues related to solid
waste management, liquid waste management and water quality aspects. In JS-
II Program, the sub-divisions will continue to play the same role for the projects
that fall under their jurisdiction, i.e. projects costing less than INR 7.5 crores, or
any other amount as may be decided by WSSD. RWS Sub-division is headed by a
Page 93 of 455
Deputy Engineer and has other technical staff and support staff. The sub-
division while directly reports to Executive Engineer at the division office in the
ZP, coordinates all the activities with BDO and BRC at the block level.
10. Primary Health Centers (PHCs): While PHCs are primarily responsible
for providing medical care to the village residents under their jurisdiction they
also play an important role in WATSAN sector. PHCs are responsible for
conducting annual ‘Sanitation Surveys’ in all villages and check if water sources
Page 94 of 455
are properly and sanitarily protected. The PHCs, based on the sanitation
surveys, issues cards of different color codes to GPs; (i) Green card implies a
satisfactory status (ii) yellow card implies scope for improvement, and (iii) red
card implies a not-acceptable situation and immediate action for improving
sanitary conditions near water sources. This is a statewide arrangement and the
same will be continued under JS-II Program.
Page 95 of 455
5. DWSM Cell: DWSM cells are already formed in all ZPs to assist the CEO,
ZP for implementing software activities related to WATSAN programs.The
DWSM cell will be headed by the Dy. CEO (WATSAN) in ZPs. These cells have
specialists in IEC, HRD/Social a Mnagement, WQ, Accounts & Procurement and
M&E (Relevant ToR is attached in Annexure 36). Services of all these
specialists will be available for implementing and monitoring different software
activities under various sector programs and JS-II Program.These cells are
strengthened by providing additional manpower under JS-II Program.
6. Roles and responsibilities of the DWSM cell: The detailed roles and
responsibilities of DWSM cell are outlined in the WSSD GR No. MISC-2012/CR-
72/WS-7 date 01/11/2012. The key responsibilities are;
Page 96 of 455
category and the Water Quality categories under JS-II. As explained earlier, the
RWS Sub-divisionoffices support the RWS division offices in the design and
execution of technical aspects of projects.
10. GSDA District Office: The GSDA district office is responsible for
implementation of groundwater based source strengthening measures and
aquifer management activities. GSDA has expertise on issues related to
groundwater surveys, delineation of watersheds/ aquifers, water quality issues
and measures to strengthen groundwater based drinking water sources and
aquifer management. However, GSDA depends on RWS division office (and sub-
division offices) for design of civil works and its monitoring and
implementation (also see Annexure 32 which provides a Scope of work for
preparation of a GP wise SLWM PLAN (Environmental Sanitation Plan)
andwater quality monitoring). GSDA also works closely with VWSC/GPs to
make best use of local knowledge and also build capacity of VWSCs on source
strengthening aspects. The GSDA district office is headed by a Senior Geologist,
who reports to the Deputy Director of GSDA at regional level. Their core role is;
Page 97 of 455
Coordinate with RWS division/sub-division offices, agriculture or Minor
Irrigation Division for design and execution of civil works, required for
drinking water source strengthening.
The Senior Geologist, GSDA will be supported by two Hydrogeologists, one GIS
Expert, one Data Entry Operator/Paraprofessional and a Khalasi for dilineating
aquifers in the seven districts selected for aquifer water management.
11. District Public Health Laboratory (DPHL): The key role of the DPHL is
to test water quality samples, received by it, for chemical contamination and
bacteriological contamination and advise the status to VWSC/GPs, RWS division
in ZP, DHO, BDO, for further action, as required. DPHL also maintains records of
the tests carried out.
13. The role of SOs in various activities will be tapered-off as the project
processes advance and the project is on the verge of completion. After ensuring
completion of capacity building activities for O&M, services of SOs will be
withdrawn.
Page 98 of 455
Geologist, GSDA will be the members of this committee and Deputy CEO (Water
and Sanitation), ZP will be the Member Secretary of this committee.
Page 99 of 455
4.3.4. Institutional Arrangements at Regional level:
1. Regional Coordination and Monitoring Units (RCMU): The WSSD will
set up RCMUs in all the six Revenue Divisions in the state under the supervision
and control of the Divisional Commissioners. The main aim is to provide timely
support and monitoring the performance of institutions at the District level. It
will also assist in bridging the gap between the State and Districts. The RCMUs
will be attached administratively in the development Branch under Dy.
Commissioner (Dev.).
10. Reform Support and Project Management Unit (RSPMU): The RSPMU
will be headed by the Project Manager and reports to the Dy. Secy. &PD at
WSSD. The RSPMU will be mainly responsible for implementation and
monitoring of JS-II components, for coordinating with various implementing
units, assist them in planning activities, implementing plans, monitoring the
same and reporting to WSSD. The RSPMU consists of specialists and support
staff, most of them drawn from various government units and recruited on
contract basis, having expertise in the sector. Details of RSPMU staffing are
given in Annexure 18.
14. Special Monitoring Cell in the GSDA: The RSPMU will establish a
special cell in the head office of GSDA for coordination and monitoring of
aquifer level ground water management projects, improvement in water quality
through various measures, strengthening their own 6 regional laboratories,
strengthening their groundwater monitoring and analysis capabilities
categories under JS-II Program. This cell will be headed by a Deputy Director,
GSDA and supported by one Hydro-geologist, one GIS expert, one M&E Assistant
and one Data Entry Operator/ paraprofessional.
18. Special Monitoring Cell (Technical)–A state level Technical Cell will be
created under the leadership of a Superintending Engineer, who will be assisted
by Executive Engineer, Deputy Engineer and Sectional/Assistant Engineer,
Assistant Account Officer, Data Entry Operators.
components.
To coordinate with auditors to ensure regular
and timely audit for division,
Maintenance of accounts by Dy. CEO (VP/
District DWSM Cells WATSAN) at the level ZPs.
Level To compile annual budget for the GPs including
budget requirement for ZP level (DWSM and
RWS Div.) also and submit the same to the
RSPMU in time.
To prepare, compile & submit the statement of
outstanding advances, trial balance, GP wise
fund release details on quarterly basis to
RSPMU of all program components.
To submit requests to RSPMU for release of
funds.
To track fund releases of GPs and timely
submission of utilization certificate for the
same to RSPMU.
To coordinate with auditors to ensure regular
and timely audit at ZP and GP level activities.
To prepare, compile & submit the Financial
Monitoring report, statement of fund position,
statement of expenditure, accounts
reconciliation statement of DWSM cell and RWS
division to RSPMU on monthly basis.
To facilitate preparation of Village level
accounts and release of funds based on
predefined conditions laid down by WSSD from
time to time for various components under JS-
II.
Compile the accounts of all VWSCs of the
district for all program components
To verify utilization certificates submitted by
GPs on sample basis.
Maintenance of accounts in the office of Sr.
District Senior Geologist
Level Geologist To Prepare & Compile Annual budget of
program components implemented by his office
and submit the same to the RSPMU in time.
To submit requests to the office of Director,
GSDA for release of funds.
records.
To submit monthly, quarterly, half yearly and
annual financial & expenditure reports to ZP.
To enter data for the activities related to JS-II
funds in the online accounting system
SANGRAM software.(OR on M&E system, jointly
developed by RSPMU and WSSO)
To facilitate preparation of Village Action Plans
At for various activities under JS-II and to get the
VWSC
Village plan approved by the Gram Sabha.
Level To plan, implement and supervise program
activities at GP level.
To submit requests for release of funds to the
ZP through GP.
To ensure that all decisions related to finances
are duly documented.
To submit Annual Action Plan to GP.
To report to the GP about all unutilized scheme
funds within specified time limit as stated in
the terms of agreement.
To exercise adequate control over all the
expenditure and assets acquired.
To be responsible for correct recording of
financial transaction in the appropriate books
and records.
To be responsible for preparation of monthly,
quarterly, half yearly and annual financial &
expenditure reports to ZP.
To enter data for the activities related to JS-II
funds in the online accounting system
SANGRAM software.(OR on M&E system, jointly
developed by RSPMU and WSSO)
5.2.1 Budgeting
Budget process involves identifying specific tasks and allocating funds needed
for accomplishing the objectives of the program within a time frame. The
budget shall be prepared following government system of budgeting as per the
state budget manual, government policies issued by Finance Department of
Government of Maharashtra.
The planning process will follow a “bottom-up” approach i.e. it will grow out of
village level plans (Village Action Plan) containing the Budget Estimates and
Revised Estimates with respect to the transactions connected with the program
along with Physical targets for various phases of the program, and get
consolidated into district/division and finally at State level Annual Action Plan.
At State level RSPMU will be responsible for preparing annual budget estimates
for activities proposed under JS-II. It will be based on consolidation of budget
estimates and revised estimates received by MJP/GSDA /WSSO/PHD/ZPs.
Budget for JS-II will be provided under separate budget Head in the state
budget and budgeted funds will be released to the State in line with Standard
Financial Procedure.
The Program AAP process will follow the budgeting cycle of the state and will
be completed when the program estimates are included in the state budget,
presented and approved by the State Legislature.
All the implementing agencies will prepare AAP for every financial year. RSPMU
will prepare estimates for RSPMU level activities, as being done for the regular
Government grants.
vi. Funds required by ZP at district level for it’s for operational expenses &
program expenses such as for studies, training. Consultancy services apart
from procurement of goods and equipments, and other software activities.
(DWSM and RWS Div.)
A. GoI Level: The World Bank shall transfer funds into a Special Account
opened for the JS-II with the Reserve Bank of India. This account will be
operated by the Controller of Aid, Accounts and Audit (CAAA),
Department of Economic Affairs (MoF), GoI. The DEA in the Ministry of
Finance acts as the administrative authority in respect of all fund flows
originating under an externally aided Program (EAP) like JS-II. Under the
proposed arrangements there shall be back to back transfer of funds
from the GoI to the State Government on receipt of funds from the World
Bank.
Rules for accounting will be guided by the Bombay Village Panchayat Act 1958,
Bombay Financial Rules 1959, and Maharashtra Treasury Rules 1968 as
applicable to all transactions under JS-II. A Financial Management Manual
(FMM) has been prepared by RSPMU. The FMM clarifies and documents the
procedure relating to budgeting, funds flow, reporting, auditing, etc. The FMM
will be used for the purposes of monitoring as well as for capacity building of
staff.
The audit report would consist of (a) financial statements and (b) and
audit opinion confirming whether the program financial statements have been
prepared in accordance with consistently applied Accounting Standards and
give a true and fair view of the operations of the program during the year, and
that Financial Management Reports (FMRs) together with the procedures and
internal controls involved in their preparation, can be relied on. Additionally,
the auditor will be required to provide a management letter to program
management, highlighting findings during the audit.
Statutory and social Audit will be carried out to confirm that moneys
have been spent for the purposes intended, with the appropriate authorizations
supported with requisite documentation, and those adequate checks and
balances are in place to prevent any impropriety.
If for any reason, the audit report of the Local Fund Auditor is delayed, a
firm of Chartered Accountants may also carry out audit.
The VPs will also have the option of engaging firms of chartered
accountants from the empanelment list prepared by ZP. The ZP will maintain a
panel of chartered accountant firms at the district level based on the general list
The Term of Reference has been developed for the audit at the GP level
and is documented in the Financial Management Manual.
Financial Statement of
GSDA / Monitoring outstanding UC (Audited)
MJP/ PHD/ Report advances Statement of
WSSO /ZP Trial Balance Trial Balance Interest Earned
to RSPMU Accounts GP wise fund Audit Report
Reconciliation release details
GP to UC (Audited)
Trial Balance
Block/ Statement of
Accounts
District Interest Earned
Reconciliation
Audit Report
Finance and accounting staff at the district level (DWSM) would be trained for
financial management system adopted for JS-II and requirements of accounting
and reporting under the program and to operate the computerized financial
management system, once it is ready. These trainings will be arranged at
YASHADA/MEETRA and will draw on internal and external expertise for the
purpose.
Training for BRC & GP level finance & accounts staff will be arranged at district
by DWSM with the help of state level RSPMU.
BRCs and SOs will play a key role in facilitating the village level institutions in
book keeping, accounting, reporting functions and will need to understand the
requirements/formats of village level accounting. Training programs, manuals
etc. will be arranged to provide the BRC/SO staff with the requisite skills to
impart the knowledge.
2. MJP and GSDA are the State Technical Agencies (STAs) for Maharashtra
with its separate mandate. MJP implements the rural water supply schemes
which are complex in nature and multi village rural water supply schemes,
especially around the peri-Urban areas. MJP implements the Independent water
schemes above Rs. 7.5 Cr. and the Regional schemes above Rs. 7.5 Cr.
3. The district level agency i.e. Zilla Parishad implements the RWS schemes
up to Rs. 7.5 Cr. and Regional schemes up to Rs. 7.5 Cr.
10. Bidding document: Standard bidding document i.e. B-1 document shall
be used for procurement of Works and ‘D’ Tender used by the MJP for
procurement of Cast Iron (CI) and Ductile Iron (DI) pipes under Rate Contract
Method. The bidding documents for selection of consultants i.e. Request for
Proposal (RFP) has been prepared and kept ready.
A) Procurement of Goods
i) E-tendering: To have a transparency in procurement process the
Govt. of Maharashtra has decided to follow the e-tendering, for
procurement of Goods costing above Rs.1, 00, 000/- (Rs One Lakh).
Under this system all the procurement activities i.e. notice inviting
tenders, supply of tender documents, receipt of bids, evaluation of bids,
and award of contract, are being carried out electronically on line.
B) Procurement of Works
i) E-tendering: The Govt. of Maharashtra, as a policy matter, has
decided to develop and deployed e-procurement system and made it
mandatory for the state to follow e-tendering process for procurement
of Works costing above Rs 5, 00,000/- (Rs. Five Lakhs).
1. Program procurement plan records and describes the purchases made from
suppliers that are necessary for the completion of the Program; engage
consultants and works contracts to create a budget and a proper annual
plan. A procurement plan typically includes the project requirements, the
justification for the procurement, a time line and an explanation of the
selection process. The important aspects of APP are:
2. Identify the services, goods and works that are needed from external
agencies.
3. Draw up detailed specifications and delivery schedules based on the master
plan for the project.
4. Get approval of these specifications and delivery schedules from the
designated authority.
5. Identify process of procurement
2. Third Party Inspection: The division and the sub division officials of
the ZP and MJP district offices, as the case may be, supervise the ongoing works
and keep a check on physical progress and quality of work as per GR dated 9th
July 2014. However, third party audit through Independent Works Quality
Supervision Agency of the contracts shall be conducted as per protocols of GoM.
2. All the procuring entities would cross check, prior to award, that no
contracts are awarded to any firms which are on the debarment list of the Bank
by checking the list available on the World Bank website
http://www.worldbank.org/debarr.
2. Objectives of the M&E System: The objectives of the M&E system for
the program will be to monitor project implementation and to evaluate the
program’s progress and transparency during implementation. An effective M&E
system assists in effective decision making at all levels of the project. M&E
systems provide accurate and timely information regarding various indicators
so that decision making and policy formulation becomes easy. Efforts will be
made to combine the JS-2 program M&E system with the overall sector M&E
system which would be improved through the project.
25
This does not mean that other indicators are not important. All intermediate results indicators are critical to the achievement
of the PDO, and will be measured and monitored throughout the PforR operation.
4. DLI#1 and DLI#2 signal critical actions along the results chain without
which the PDO cannot be achieved. DLI#3, DLI#4 and DLI#5 provide funds
against performance (achievement of priority outputs) to encourage the practice
of managing for results, and a stronger focus on actual service improvement.
Detailed descriptions/definitions of the achievement of each DLI are provided in
Annexure 23.
1. Data collection for M&E will be done through a careful and methodically
well-defined structure. Stakeholders responsible for generating, collecting and
feeding/uploading accurate data will be identified. Data collection formats will
be simple and user friendly, for effective management of information MIS will be
designed that can support 200 concurrent users. Requirements of data analysis,
design of information flow, software, production, testing/piloting and
implementation in phased manner will be taken into consideration for designing
Village All the sector action happens at This is the basic information
this level and hence most of the for all the sector planning
sector information originates at and implementation. The
this level. The broad indicators baselines data will provide a
are captured below. However, the holistic sector status and
collection and entry of helps in planning and policy
information could be spread formulation.
across village, block and district The planning and project
teams. execution phases will provide
Base line information information of progress of
Planning information, in case of bridging gaps identified in
new projects (scheme details, the baseline information and
estimated costs, various will update the baseline from
approvals, community time to time
contribution, VWSC and sub-
committees details, capacity
The O&M and service
building and awareness
delivery information will
generation activities)
provide regular feedback to
Project execution information
sector managers for timely
(contract details, project
and corrective actions. It will
progress, financial progress etc.)
also help in refining sector
O&M information (tariff agreed,
policy and financing
% of tariffs collected,
framework, from time to
breakdowns, expansions, status
time.
of metering, etc.)
Service delivery information
(regularity, number of hours of
supply, water quality, Non-
Revenue water etc.)
Sanitation coverage and use data
Status of ODF/NGP related data
Status of solid waste
1. The RSPMU and WSSO will be the key organisations for developing and
strengthening M&E systems for the sector. Regional Coordination and
Monitoring Units (RCMUs) will be created in all the six administrative regions
to closely monitor the sector and program activities.
2. The RSPMU will have an M&E Cell. This cell will be responsible for
effective and efficient monitoring and evaluation of sector programs and also
for giving feedback for policy support, along with the M&E cell in WSSO.
5. Capacity Building for M&E: All users and stakeholders in the Program
right from GP level to State level will be trained for using M&E system. All
personnel in the DWSM cell and BRCs will be trained thoroughly for using the
system and softwares as well as for trouble shooting. Members of GPs, VWSCs,
SACs and CBOs will be trained for participatory M&E. Senior officers at district/
regional/state levels will be trained at MEETRA or YASHADA or any other
selected institute. Quarterly Review Meetings will ensure usage of M&E system
at all levels.
The activities that are prohibited and are not to be included in the
proposed intervention.
The activities for which prior permission from the designated
authority/department is to be taken.
8. Based on the status of rainfall, surface and ground water availability and
quality, the severely affected areas as well as areas that harbor sites of natural
or cultural heritage significance have been identified as hot spots that need
special attention and actions for environmental management under the
Program. These include talukas identified on the basis of water scare (rainfall),
11. GSDA and ZP/MJP already have staff with relevant experince to manage
responsibility of environmental management at the state and district level
units. Such staff will be identified and trained for managing environmental
aspects under the program which include:
a. Environmental Management Specialist at the state level in Reform
Support and Project Management Unit
b. Deputy Director and Ex-officio Environmental Management Specialist at
Special Monitoring Cell at GSDA
c. Executive Engineer RWS/MJP and Ex-officio Environmental Management
Specialist at District Level
d. Sr. Geologist and Ex-officio Environmental Management Specialist at
GSDA District Level
e. Environmental Management Specialists Resource Person at the state level
in MEETRA
12. The description of roles and responsibilities for these positions is given
below:
a) Reform Support and Project Management Unit (RSPMU)
Jalswarajya II: The Environmental Management Specialist in the RSPMU
is responsible for facilitating and ensuring the implementation of
Ground Water Deputy Director To ensure that all JS-II aquifer level
Survey and and Ex-officio groundwater management and ground
Development Environmental water quality affected area
Agency Management interventions are in compliance with
(GSDA) Specialist at the relevant environmental laws and
Special regulations.
Monitoring Cell at To ensure that Environmental Due
GSDA Diligence Plans (EDDPs) are prepared
for all JS-II aquifer level groundwater
management interventions requiring
the same by qualified personnel.
To ensure that the EDDPs are
integrated into detailed scheme
plan/report and bid documents and are
implemented.
Sr. Geologist and To ensure that all JS-II aquifer level
Ex-officio groundwater management
Environmental interventions and ground water quality
Management affected area interventions in the
Specialist at district are in compliance with the
GSDA District relevant Environmental laws and
Level regulations.
To ensure that the EDDPs are
integrated into detailed scheme
plan/report and bid documents and are
implemented.
MEETRA Environment To design and coordinate delivery of
Management training modules on Environmental
Resource Person management in RWSS for WSSO
–(designated specialists, MJP engineers, GSDA
officer) Geologists/ Hydrogeologists, ZP’s
RWSD and DWSM specialists.
Zilla Executive To ensure that all schemes are in
Parishad/ MJP Engineer compliance with the relevant
RWS/MJP Environmental laws and regulations.
Ex-officio To liaison with forest department,
Environmental MPCB and other related departments
Twice during the program period in year 2 and year 4, WSSD will appoint an
external agency (Government agency or independent consulting agency) to
undertake an independent audit of the environmental performance of all JS- II
Program activities with sample covering adequate no. of schemes in the
environmental hotspot areas.
27
Bi-lateral government organization providing funding throughout the major regions of the world
2. However, land owned by SC, ST, BPL and other weaker groups will be
considered in exceptional circumstances if no other suitable land is available.
Land for Water Supply schemes is generally required for Source works, Summer
Storage Reservoirs (if source is not perennial), Treatment Plants, Transmission,
Storage Reservoirs, Distribution Systems, etc. The necessity of land for various
types of rural/peri-urban water supply schemes is given in Table 22 below:
Table 22: Land Requirements
S.No. Component Land Requirement
Surface water Ground Water
1 Source works Land is required for Land is required for bore
head works and pump wells and pump houses.
houses.
2 Treatment Generally, for surface Generally, groundwater is
water based schemes, treated with chlorination for
slow sand filters are bacteriological
used for treatment contamination. Land is not
followed by required for this purpose as
chlorination for the chlorinator can be fitted
bacteriological into the pump house.
contamination. Land is
required for this.
3 Transmission Transmission lines will Transmission lines will be
be laid along the public laid along the public roads
roads and hence no and hence no lands are
lands are required required.
4 Storage Land is required for Land is required for storage.
storage. Generally, Generally, storage is built in
storage is built in public public places in the villages.
places in the villages.
Sometimes land is
required for summer
storage.
5 Distribution Land required, but Land is required, but pipes
pipes are laid along are laid along roads and
roads and public places public places are used for
are used for stand stand posts.
posts.
a) Sub-project Cycle: The broad elements of the sub-project cycle are (Activity
wise details in Annexure 27 to 30):
Orientation of implementing partners on the ‘guiding principles’-
inclusion, participation, transparency, and accountability and on their
roles and responsibilities;
Rapport building and awareness through communication program;
Social mobilization to strengthen ward level planning;
Social mobilization of women to facilitate prioritization of their needs to
be reflected in ward plans;
Facilitating Gram Sabha meetings to consolidate ward plans and
prepare GP level plan and approval;
1. The success of the program depends on effective and meaningful IEC and
communication strategy. Strategic communications approach is a social process
of dialog, negotiation, and consensus building through the use of a variety of
methods. Based on principles of inclusion, transparency and accountability, the
IEC and communication strategy aims to enhance the ability of stakeholders to
engage, influence local level institutions and hold them accountable for their
work.
2. The communications model advocated is a community owned
communication strategy that encourages civic engagement, where the
community is part of the planning and monitoring process of the schemes. This
is a long term process of continued dialogue, clarifying issues under discussions
and finding solutions to matters of common concern. Through engagement, a
space is created where issues can be openly discussed, compromises negotiated
and solutions acceptable to the majority accepted and ratified. This strategy
seeks to foster social, political and institutional changes at different levels by
building trust among implementers and the users, promoting a two-way
communication, exchanging knowledge and skills for a sustainable change in
both availability of services and behavior that is consistent with facts on the
ground. The best technically designed infrastructure projects can fail or have
weak results if decision makers and the beneficiaries are not duly consulted,
informed and mobilized.
Primary
o Beneficiary Households
o Schools
o Anganwadis
Secondary
o Village, block and district level functionaries of RWS/ ZP/ DWSM
o Panchayat Raj Institutions (PRI)
1. The objective is to ensure that the assets created during the program
implementation phase are sustained and continue to yield benefits in the years
to come.
i. Ensure that the GP/VWSCs are aware of the O&M responsibilities. Start
building capacity of the VWSC for taking up O&M responsibilities right
from the start of the project.
ii. Enable the SAC to match the planned programs with actually completed
programs. Ensure that all operations are completed and that the
communities are aware of this fact.
iii. Conduct a vision building on water management separately to help them
see the larger picture and their critical role in O&M as the basis for
formulating their visions and plans.
iv. Enable the GP/Gram Sabha to draft clear agreements on how each asset
will be maintained, responsibility sharing between members, cost
implications and how they will be managed based on equity
considerations.
v. Prepare a full inventory of assets created under the project with the
participation of VWSC. At the time of withdrawal, obtain a signed
statement on the above inventory. Assets will continue to be maintained
and managed by them.
2. Existing GoM Systems: There are three existing GAC systems that are
applicable to the JS-II Programs given below. Efforts will be made to make the
stakeholders aware of these systems and also improve effectiveness of
monitoring of these systems, where necessary.
1. The Right to Information Act (RTI) and rules there under are applicable in
Maharashtra. The following is the existing structure and process for
implementing the RTI Act in the state, with respect to the RWSS sector,
3. At the state level; the Chief Information Commissioner (CIC) is the Apex
authority. CIC nominates full time representatives – Regional Information
Commissioners- at regional level (in all six administrative regions) who are
responsible for dealing with the second level of appeals.
28
The General Administration Department, GoM, notified the process and formats for making requests and appeals through a
Government Notification dated October 11, 2005.
6. 1st Appeal: If the applicant is not satisfied with the information and/or
does not get the information within the stipulated time, s/he can approach the
designated ‘First Appellate Authority (FAA)’ within the department. The FAA
has to provide satisfactory information and/or resolve any grievances within
30 days.
7. 2nd Appeal: If the applicant is not satisfied with this process s/he can
approach the next level of Appellate Authority (AA) appointed by the Chief
Information Commissioner in each division (6 divisions in the state). The RIC
can hear the petition either in person and/or through video conference facility
available at the District Collector’s office in each district.
8. Final judgement: Those appeals which could not be resolved by the RIC
are referred to CIC for final resolution.
9. The CIC publishes an annual report on all the appeals received and resolved
at various levels.
1. GoM has an established system at the Zilla Parishad level called ‘Lok Shahi’
divas (People’s day) wherein the grieved citizens can approach the CEO of ZPs
and District Collectors and complaint against issues of fraud and corruption
and/ or record their grievances. There is an established process wherein these
grievances and complaints are addressed through respective Heads of
Departments and Block Development Officers. The CEO, ZP has powers to
launch First Information Report (FIR) with the police for cases that involve
corruption (please see Annexure 35 for reporting format of complaints).
1. As per GoM’s policy (dated 9th July 2014), GPs/ VWSCs are responsible to
manage projects costing up to INR 50 million. However, as GPs do not possess
required technical expertise, WSSD designed a system where ZPs (mainly the
RWS Division and Sub-Division offices) support GPs/ VWSCs in the entire
1. SACs will be formed in all project villages and trained to perform their
roles related to social audits. The details of stages where social audits will be
conducted and processes of conducting and using the information are described
in chapter-8 (Environment and Social Management Rules and Procedures).
1. In WSSD office, at state level, all the Desk Officers are recognized as
‘vigilance officers’ and have authority to receive complaints and seek
investigations through the Regional offices and/or ZPs. Only cases of serious
nature are referred to the Principal Secretary, WSSD, for further action/
directions. However, these complaints will be codified and tracked effectively
under one system. As the WSSD as well as the RSPMU is heading towards ‘e-
office’ system, such a centralized tracking system for complaints and grievances
system will become possible.
2. Under JS-II Program, the WSSD will notify one officer in the Secreterait
of WSSD as ‘vigilance coordinator’. The WSSD will develop a system of
classifying and codifying complaints received under the JS-II program and other
sector programs. Such system will be developed as an integral part of a robust,
web-based M&E System.
3. The WSSD Vigilance officer will be responsible for monitoring all types
of complaints entered into the system and will prepare a quarterly monitoring
report for the consideration of Principal Secretary, WSSD and other concerned
officers (SEs, CEOs and others). All such cases that need legal/ police scrutiny
will be referred to respective agencies (Police, Anti-Corruption Bureau, etc.)
and centrally tracked. Provisions of Maharashtra Civil Services (Discipline and
Appeal) Rules, provisions of state Anti-Corruption Act, provisions of Indian
Penal Code (IPC) and provisions of Criminal Procedure Code (CrPC) will be
applicable in condcuting inquiries for the above cases. The WSSD shall report to
World Bank information on such cases within JS-II program every six months
(format attached as Annexure-35) and also publish an annual report on the
status of complaints.
Cross-cutting Actions
1. Strengthen existing Establish WSSD Database is maintained on
complaint and grievance system by complaints and actions taken.
redress and vigilance Year 2, Report on complaints and
mechanisms within WSSD then actions taken is prepared
at the state level to handle monitor annually and publicly disclosed.
complaints related to annually. WSSD’s vigilance function
procurement, financial strengthened/codified/formaliz
management, service ed along with consolidation of
delivery, environmental information on vigilance issues.
and social aspects, and Grievance redress mechanism
fraud and corruption (E-Pani) more accessible and
issues under the program. comprehensive, and captures
Information on and handles allegations of fraud
complaints received and and corruption.
remedial actions taken
will be aggregated
annually and publicly
disclosed.
2. Prepare and implement an Annually, WSSO Annual Capacity Development
Annual Capacity starting Plan prepared and implemented
Development Plan for key from Year focusing on individual staff
sector institutions (WSSO, 1. competence and collective
DWSM and BRCs) focused capabilities (resources, tools and
on developing both assets) in key sector institutions
individual competencies (WSSO, DWSM and BRCs).
and collective capabilities
(resources, tools and
assets).
Policy Actions
100
Note: -
This is to certify that the GP ___________, Tal - __________, Dist- ____________ has applied for inclusion in the Maharashtra Water &
Sanitation sector programs for Peri-urban villages. The present status of the GP is as under: (Please give details of each habitation
separately)
Habitation No. of No. of % of No. of Source of Present Age Total APL % of Details of % of Status of
Name House IHH IHH PWSs existing LPCD of Popula Popula APL award/s Water sanitation
holds Toilets Toilets PWS PWS tion tion populat received Tax survey of
(Surface/ * ion from Govt. collection sources
Tapping for social s in last (Latest)
or other) mobilization financial (Red/ Green/
year Yellow Card)
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14.
Av. Of GP
Note
*Age of latest executed PWS shall be considered.
All other parameters will be evaluated on the basis of average of all habitations.
Present figures for population, households, IHH toilets etc. (Census 2011) shall be given.
Sr. No. Habitatio Present No. of No. of % of District Block % of Av. Tank Tanker Tanker No Remarks
n Name Population Present IHH IHH Average Average Rainfall er for for any for any Tanke
(Census Households Toilets Toilets Rainfall Rainfall of block last 3 2 of 1 of r in
2011) (Census in mm in mm w.r.t. Av. Years last 3 last 3 last 3
2011) rainfall * years* years* years
of Dist
Av. of
GP
Rs.145.00
TOTAL
( Laboratory Tables for Analytical Work, One Table for Computer System and
Built-in Storage for Records &Consumables )
Staff Position
2. Presently the functioning of all existing regional Laboratories is done by
the three Chemists per Regional Lab, having qualification of post- graduation in
Chemistry and one Laboratory Assistant per regional laboratory having
qualification of Xth level exam passed, to assist the three chemists.
8. Since 2000, water quality samples collected in these 3370 stations are
analysed in regional laboratories. Since year 2005 various water quality
assessment projects are undertaken by regional laboratories, such as Aquifer
30000
25000
20000
Samples Received for Chmical &
15000
Bacteriological Analysis
10000 Samples Analysed for Chemical&
Bacteriological parameters
5000
0
2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
1 2 3 4 5 6 7
Proposal
1. The Drinking Water Quality Monitoring protocol prescribed by GoI
describes specific requirements for monitoring drinking water quality with a
view to ensure provision of safe drinking water to the consumers. In addition, it
also includes requirements for setting-up laboratories at State, District and Sub-
district level and their quality control for regular testing and surveillance of
drinking water sources. The purpose is to describe various elements of
laboratory management practices to ensure that the data generated is
comparable and scientifically correct and in a form that can then be used to
result in interventions to improve water quality.
2. The objective of the project is to meet the demands of water quality
monitoring protocols laid down by GoI. To meet the requirements of GoI, it is
proposed to strengthen the regional laboratories under Jalswarajya II. This
would entail additional staff requirements and construction of additional
buildings. Under this project the construction of building and procurement of
scientific equipment’s are being proposed. The estimated cost of the project is
around Rs 9.45 crore and abstract is given in subsequent tables. The
requirement of staff would be met from the separate proposal being submitted
to Water Supply and Sanitation Organization (WSSO). The details of proposed
activity are listed below.
Fund Flow
1. The total estimate for strengthening the laboratories is around Rs 9.45
Cr. During project period for operation and maintenance, 10% of the estimated
cost has been year marked for each activity in each year. For chemicals and
glassware’s the recurring expenditure will be around 25%.
All the activities will be carried out by GSDA only. Hence, it is proposed to
release the funds to Directorate, GSDA, Pune which in turn will give it to the
Regional Deputy Directors as per the requirements. The flow of funds will be
from RSPMU to Directorate to Deputy Director.
Manpower
Additional technical staff is essential for proper functioning of these
laboratories. The Ministerial staff for administrative purpose will be made
available from existing staff of regional office. However, the required technical
staff will be made available from NRDWP funds. WSSO has principally agreed
for this and decided to support also. This will conjunctively strengthen the
water quality assessment work and make it more efficient.
Expected Outcome
i) As the extent of pollution is increasing, the strengthening of laboratory
will help to increase the frequency of testing of water samples and will
cover larger areas.
ii) Analysis of pesticides, heavy metals in groundwater will be carried out at
Pune regional laboratory.
iii) Accreditation will maintain quality control of some important testing
parameters and precision & accuracy in analytical work. This will give
real status of the ground water quality in the area.
iv) It will be possible to undertake projects, to study the genesis of polluting
contaminant and more emphasis can be given to implement preventive
measures. Preventive measures are more economic and viable than
curative measures.
v) More informed policy decisions can be taken by policy makers with
respect to quality affected area. Ultimately this will help to achieve the
goal “providing safe and potable drinking water to all in Rural
Habitations”.
Note: The rates considered are approximate and may likely to change.
Approx.
Approx.
Quanti Cost No Approx.
Cost
S. ty per Require of Cost
Item Specifications Required
N. Region d per Lab Required
per lab in
al lab unit in s for 6 Labs
Rs
Rs
Voltage
1 Standard make 2 25000 50000 6 300000
stabilizer
2 Heating mantle Cap. 1 lt. 1 25000 25000 6 150000
Temp. control
Bacteriological device Range 0
3 1 50000 50000 6 300000
Incubator to 50° C
Medium size
Medium size
4 Autoclave 1 50000 50000 6 300000
steel cabinet
Flame
5 Na, K 1 50000 50000 6 300000
Photometer
Specific Ion
meter along
with electrodes
6 Digital 1 300000 300000 6 1800000
(for Fluoride
and Nitrate
etc.)
Inductively
coupled
plasma-optical
7 Standard make 1 5000000 5000000 1 5000000
emission
spectrometry
(ICP-OES) for
Hydride
generator with
all accessories
8 for Pune Standard make 1 250000 250000 1 250000
Regional
Laboratory
only
Fume hood
(Chimney) for
9 Pune Regional Standard make 1 75000 75000 1 75000
Laboratory
only
Gas
Chromatograp
hy with mass
10 Spectrometry Digital 1 5000000 5000000 1 5000000
for Pune
Regional
laboratory only
Portable
advanced
11 Standard make 15 50000 750000 6 4500000
water Quality
Kits
TOTAL 10850000 19500000
Note: The rates considered are approximate and may likely to change.
Other
Quantity Approximate
Infrastructure Approximate No. Approximate
per Cost
S.N Requirement Rate per Unit of Cost Required
regional Required per
for Regional Rs. Labs for 6 labs
lab lab
Laboratory
1 Computers 1 40000 40000 6 240000
2 Printer 1 10000 10000 6 60000
Chemical
Quality
1 1000000 1000000 6 6000000
modeling
3 software
4 scanner 1 10000 10000 6 60000
Approx.
Approx.
Additional Cost
Cost No of
S. requirement required
Item Specifications required Regional
N. per Regional for 6
per year labs
lab Regional
in Rs
labs
Chemicals as
as per the list in
per the list in
1 Uniform DWQM Lump-sum 150000 6 900000
Uniform DWQM
protocol
protocol
Glassware as
as per the list in
per the list in
2 Uniform DWQM Lump-sum 50000 6 300000
Uniform DWQM
protocol
protocol
Accreditation of
Laboratory
3 (fees, NABL Lump-sum 250000 6 1500000
documentation
etc.)
TOTAL 450000 2700000
Note: The rates considered are approximate and may likely to change.
Introduction
1. Groundwater is precious and widely distributed resource of the earth
and unlike any other mineral resource. It gets its annual replenishment from
meteoric precipitation. Groundwater plays an important role for drinking and
irrigation purpose. In Maharashtra, amongst total population around 80% is
dependent on groundwater for domestic purpose. As per the Groundwater
Estimation Report of 2008-09, the annual replenish groundwater resource is
35.73 BCM, while its net availability is 33.80 BCM and annual draft is 17.00
BCM. Rainfall is the primary source of ground water recharge.
4. The ground water level time series manifests in itself all the characters
of influencing factors i.e. natural or manmade. Different types of variations like
trends, jumps, and periodicities are introduced in the time series by natural
processes such as recurrence of drought, earthquakes, rainfall patterns etc. The
hydrograph represents the resultant effect of a number of phenomenon’s many
of which may be periodic (i.e. self-repeating). Each periodic phenomenon
Current Scenario
Methodology
The Jalsurakshak of villages of the pilot districts will send the recorded
water level information, rainfall and water quality status immediately
within 3 hrs of measurements to the central server through the SMS / web
based system. In case of state observation well network, the groundwater
level information will be sent immediately after capturing data from
particular observation well.
Project Period
The project duration will be of six years.
Estimated cost
For the development of software it is envisaged to take the support of the
academic institutions like IIT etc.
Total
Sr.
Qua Unit Cost Expenditur
N Item Unit Remarks
ntity Rs. e Rs. (for 6
o.
years)
Will be covered
Survey for establishment of
1 1 2884 - under OBW
observation wells
project
Will be covered
2 Measuring Tape & painting 1 2917 - under OBW
project
Rain gauge instrument & In selected
3 1 1000 4000 4000000
installation villages
In selected
4 WQ monitoring kit 1 600 6000 3600000
villages
5 GPS eneabled handheld
instruments with preloaded
2 500 15000 7500000
apps for data acquisition and
data viewing
6 IT infrastructure-High end
web servers and backup
1 3 600000 1800000
server and allied accessories
and works
7 Web Based and SMS based
application & software
program development for
transmitting, capturing,
analysing, interpreting and
1 1 4000000 4000000
publishing data in statistical,
graphical and in map form &
Website Development with
GIS data publishing
capabilities
8 Forecasting model and app
1 1 2000000 2000000
development and
Expected Outcome:
Weekly/monthly/quarterly/yearly report of groundwater levels its
relationship with rainfall and water quality of village
Graphical representation of rainfall and groundwater levels in GIS format.
Prediction of probable water scarcity villages on real time basis.
Village specific tools for groundwater development and management.
References:
Missouri department of natural resources website: -
http://www.dnr.mo.gov/env/wrc/docs/WhyWaterLevelsChange.pdf
The World Bank global water partnership associate Program:-
http://www.un-igrac.org/dynamics/modules/SFIL0100/view.php?fil_Id=170
Introduction
Water is an essential commodity in all spheres of life. Maharashtra State has
total cultivable area of 25.23 million hectares, and at present only about 9% of
this area has been brought under irrigation. About 4.85 million hectares of
cultivable area can be brought into irrigation, after tapping the entire surface
water irrigation potential of all river basins of the State. Similarly, additional
4.85 million hectares of cultivable area can be brought into irrigation, after
tapping the entire groundwater potential of the State. This brings to the fore the
fact that, water is the limiting factor and its optimum assessment, utilization
and development should be made.
Objective
To carry out strengthening of existing Hydro-meteorological stations by
incorporating state of art instrumentation and up scaling the facilities thereof
to yield quality data that can be used in Groundwater estimation, scarcity
prediction and water balance study.
Project Activities -
1. Replacement of old Instruments
2. Installation of new Instruments
3. Infrastructure development at existing or newly replaced HMS -Civil Works
4. Data capturing
Cost Estimate-
The details of approximate funds requirement for strengthening of existing
Hydro- Meteorological Station (HMS), thus funds requirement for the
strengthening of existing Hydro-Meteorological Station (HMS) will be 273.56
Lakhs (See Table 2 below).
Expected Outcome
The data collected from the HMS station will be helpful in refining the
groundwater assessment, do computer modelling and forecast the groundwater
levels along with carrying out the water balance study. The data created shall of
immense use for the community based aquifer level groundwater management
project proposed under the Jalswarajya II. Similarly the parameters like yearly
groundwater recharge figures are useful for the dilution project. The HMS real
time data will help to establish the relation between the rainfall and
groundwater recharge. The water-level data generated through automization of
the HMS will be disseminated to the through bulk sms so that the community
gets the understanding of the available resource at their disposal resulting in
sustainable management of the same.
Current scenario
Observation wells are crucial part of Groundwater Monitoring System. GSDA is
monitoring the Groundwater Levels in Maharashtra State since 1973. At present
a network of 3920 Groundwater monitoring wells located all over the State is
being monitored. Locations of observation wells are based on Watershed as a
unit. Watersheds have mainly three type of areas; Runoff, Recharge and Storage.
GSDA has located one well in each of these areas in all 1531 watersheds in the
State. These wells are being monitored four times a year during January, March,
May, and October.The database thus generated forms the basis for assessment
of ground water resources and changes in the ground water regime consequent
to various development and management activities. GSDA also uses this data for
prediction of Scarcity for a particular hydrological year.
Constraints
1. Groundwater level record of any groundwater structure such as dug
well, borewell or tubewell can be had in continuous state or discrete state. A
continuous record can be had with the help of mechanical (float) instruments or
pressure transducers. A discrete record i.e. record of groundwater levels
measured once a day, week or month, can be had with the help of groundwater
measuring tape or acoustic measuring system, or electrical sounder or airline
(CGWB, 1995).
3. The Central Groundwater Board (CGWB) and the State maintain water
levels of dug wells, borewells/tubewells etc. representing different
hydrogeological environments, on monthly/quarterly basis in a year. These
records are used for study of regional groundwater levels, their rising and
falling trends, and resource availability for exploitation before on set of
monsoon.
2. Purpose -
The data generated from the groundwater level monitoring network is used
for –
a. Estimation of groundwater resources
b. Scarcity prediction and mitigation measures.
c. Regulatory Measures during scarcity time
d. Environmental assessment
e. Planning, development and management of groundwater resources
Notification of OB wells
1. The details of newly fixed observation wells will be informed to concern
Sarpanch and or Grampanchayat members, Gramsevak, BDO, Tahsildar, CEO
and collector in the form of lists, details and maps.
Compilation of data
1. Basic Data compilation will be carried out by District Senior Geologist
office. Over the period of time, GSDA through policy reforms will devise
mechanism for compilation of data from villages through SMS or website or any
other technology.
Policy Reforms
1. At present, it is not mandatory for gramsevak or local body members to
monitor or maintain groundwater related information at village level. GSDA
with the help of RSPMU will pursue GOM for making it mandatory to gramsevak
for maintaining records related to monitoring of observation wells.
Total
Sr. Unit Cost
Item Unit Expenditure
No. Rs.
Rs.
Evaluation of existing monitoring
1 network by external agency (IIT / Univ - 1000000 1000000
/ NGO)
Survey for establishment of
observation wells (Inhouse /
2
Outsourcing), vehicle hiring and related 35800
works, O & M villages 1000 35800000
Construction of piezometers for data
3 500 35000 17500000
gaps
4 Measuring Tape 43000 100 4300000
5 Electronic water level indicator 500 10000 5000000
6 Painting of Information on parapet 40000 200 8000000
Expected outcome
4. Use of storm water drains to collect sullage: (i) most villages have
road side drains to collect the sullage which is free from solids and also does not
have pollutants. (ii) However quite often the existing storm water drains are
not designed with appropriate slopes and shapes to avoid stagnation, (iii)
Unsanitary village conditions exist in most places due to clogged open drains
with garbage and silt, existence of stagnant pools of wastewater, littered
garbage/plastic, improper disposal of effluents from septic tanks and cesspools
etc.
S. Suggested Remar
No Description unit Criteria ks
1 Design Period
Base year year 2015
Source 30
Rising Main years 30
Gravity main years 30
Treatment plant years 15
Storage years 15
Distribution system years 30
Pumping machinery years 15
Census year for base year
population 2011
Annual growth rate of Population % 1
2 Service level clear water lpcd 70 *
Losses to be considered (As per
CPHEEO manual) % 15
3 Pumping Hrs. hrs. 8 to 16 **
4 Storage capacity of ELSR 12 ***
( bids to be invited per liter basis)
5 Supply hrs. 8 hrs. -24 hrs.
6 Peak factor 3
7 Pipe Material
Rising Main DI K-7/HDPE ****
Gravity main HDPE 6 KSC
Distribution system PVC 6 KSC
Minimum diameter of Distribution
system mm 63
Minimum residual head meters 7
House connection diameter mm 15
House connection pipe MDPE
8 WTP ( bids to be invited per liter As per CPHEEO
basis) manual XXX
9 Chlorinator Gaseous XXXX
5 Service level: All Peri Urban water supply schemes will be designed for
a service level of upto 70 lpcd and with 100% Household connections. Adjacent
urban area service level will be provided subject to source availability. Schemes
will be designed for 24x7 supply wherever possible, with all house connections
metered.
7 Type of valves: (a) Gate valves will be used for online and control at
branches. (b) BF Valves for control of inlet to ESRs and Control on Branches of
MVS; (c) Air Valves: SVS and MVS IS 14845; and (d) Dynamic valves wherever
required. Dismantling joints will be provided for all Gate valves and BF valves.
9 Water level indicator: Float type water level indicator will be used
for SVS and Float type /ultrasonic Water level indicator will be provided for
MVS.
10 Stairs: Stairs to go up will be in RCC dog legged/ spiral and hand rails
will be in RCC. Stairs to enter ESR will be in SS/ RCC/ Aluminum.
S. Yes/
no. Requirement/Activity No Remarks
Status of Existing Water supply
i) Type of scheme and present service level lpcd
ii) Quality of present water
iii) Rehabilitation needs -specifically distribution system
iv) Feasibility/necessity for water and energy audit
Planning
i) Community and household survey
ii) Availability of water in source confirmed
iii) Is engineering survey done by using Total Station
iv) GIS base map prepared for the village
v) Availability of land for all categories
Designs for
i) System hydraulic design
ii) Economical size of pumping mains
iii) Process design of WTP
iv) distribution system design output for each village
SBC determined for Pump houses, OHT sites and
v) WTP site
vi) Structural designs of intake well and pump houses
vii) Structural designs of WTP categories
viii) Structural Designs of OHT revised to latest IS codes.
Drawings prepared for
i) Intake works
ii) Key Map / Index map
iii) Longitudinal section along pipeline route
iv) Road network within each village
v) Distribution system network drawing
vi) Pump houses for raw water and clear water
vii) WTP site plan and tentative layout
viii) Site plans for all OHT s
ix) Detailed drawing for OHT
Estimate provision made include
i) WTP
ii) OHT
iii) All electro mechanical works
iv) Power discom's woks for obtaining dedicated power
5. Control Philosophy:
When the flow varies from the set point of flow then the MOV will
operate by automatic command from the RTU to regulate and
achieve the required design flow at inlet of the ESR
When the pressures vary from the set point of pressure then the MOV
will operate by automatic command from the RTU to regulate and
achieve the required design pressure set at corresponding inlet of the
ESR. This is better done by a Pressure reducing valve (PRV) than
with BF valve.
When the power failure occurs at pumping station and there is no
flow to the MBR MOV in the inlet of ESR closes by automatic
command from the RTU to avoid emptying the pipeline.
When the power resumes at pumping station and flow to the MBR is
resumed the MOV in the feeder main location and inlet of ELSR and
intermediate sump will open by automatic command from the RTU.
The level in the ELSR will be monitored and transmitted to RTU.
When the maximum water level reaches in the ELSR MOV at inlet will
close by automatic command from RTU. When the water level falls
below maximum water level in the ELSR MOV at inlet will open by
automatic command from RTU. The battery back-up system shall
consist of 12V/60AHr capacity battery with charger facility with
minimum 24 hour battery back-up. Solar Connectivity enabled.
Instrumentation such as Flow meters, level sensors, actuator
operated BF valves, PLC panels etc., require prompt servicing
arrangement. Hence the DSR/ bid document shall have cost of SCADA
with at least five years of O&M.
19. Based on the field survey (Detailed Hydr-geological survey) carried out by
Groundwater Survey and Development Agency (GSDA), the District Level
Committee will decide an appropriate strategy and prepare an action plan for
preparing the DPRs with the help of Rural Water Supply Division Zilla
Parishad/GSDA.
CONVENTIONAL MEASURES
Other Technological Options
1. Reverse osmosis (RO) is a water purification technology that uses a semi-
permeable membrane. This membrane technology is not properly
a filtration method. In reverse osmosis, an applied pressure is used to
overcome osmotic pressure, a colligative property, which is driven by chemical
potential, a thermodynamic parameter. Reverse osmosis can remove many
types of molecules and ions from solutions, and is used in both industrial
processes and the production of potable water.
2. The committee will approve the short listed habitations prioritized for
detailed survey and monitor the timely completion of survey work, under taken
by District Senior Geologist, GSDA. If short listed habitations are not available
then committee will take into consideration the list of contaminated sources
available with Zill Parishad. Committee will scrutiny the completed village/
habitation wise survey reports presented by District senior Geologist. The
committee will discuss in details all the suggested and available options. The
committee shall decide the final option based on the technical and least cost
solution norms. If required the committee can also take the opinion of outside
sector experts. The committee shall take final decision on the methodology/
measures to be adopted for providing safe and secure drinking water in water
quality affected habitations and instruct the concern department to take up the
work.
3. The committee in their first meeting will set year wise targets to achieve
the DLI’s established for Water Quality affected habitations and shall inform the
same to GoM under intimation to Cell at Directorate, GSDA, Pune.
9. For Distant Source, prevailing GoM norms, guidelines and methodology will
be adopted.
3. The technical drawings, designs and the estimates prepared by the deputy
engineer would be appraised by the executive engineer from Water Supply or
Water Resources or Water Conservation Department and the senior geologist,
who are members of the District Committee. The Technical Sanction will be
given by the competent authority Executive Engineer Rural Water Supply
Division, Zilla Parishad/Senior Geologist/Executive Engineer Minor Irrigation
Division/Executive Engineer or Superintending Engineer, Maharashtra Jeevan
Pradhikarn. The Administrative Sanction (AS) will be given by the District Level
Committee headed by Chief Executive Officer, Zilla Parishad after due
agreement of the village Gram Sabha.
Impact Assessment
Detailed impact assessment of the project will be carried out in the last phase of
the project. Impact assessment will include habitation wise, source wise and
recharge measure wise impact on the water quality of the source and ultimately
on the community. Post project benefits on people’s health will also be assessed
by using the specially developed questionnaire.
Estimated Expenditure:
1. The total of estimated expenditure for all hardware activities is around INR
825.00 million. The details of itemized expenditure are given below.
Estimated
Sr. No. Component Description
Cost
Part - A: Hydro-geological Survey Rs in lakhs
Detailed Hydro- Detailed Hydro-geological Survey
1 geological Survey for in for 330 habitations @Rs 0.75 247.50
finalizing the option lakh/hab
Part B: Implementation measures for 330 habitations
Implementation of Dilution
through recharge measures /
Measures
2 Technological options / Distant 7920.00
Implementation
Source in approx 330 habs @ 24
Lakhs / hab
Part C: Trainings and Capacity Building
Trainings & Study Technical trainings & Exposure
3 82.50
tours Visits etc @Rs0.25 lakh/hab
Total 8250.00
2. Software activities like IEC, Training, and workshops for capacity building
support will be provided from the funds earmarked for software activities
under Jalswarajya-II.
Flow of Funds
WSSD will directly transfer the funds to the bank account of Director, GSDA. In
turn Director GSDA will release the funds to Sr. Geologist GSDA & CEO, Zilla
Parishad as per their demand for implementation of the component. The grants
will be disbursed in installments as per the guidelines issued by WSSD from
2. These objectives will also help in testing and implementation of the recently
passed Maharashtra Groundwater (Development and Management) Act 2009
and will evolve the region specific approaches. The research activities would
provide insight to key issues of groundwater pricing, control on deep irrigation
borewell, excessive use of groundwater for the water intensive crops, initiatives
for sustainable groundwater management etc. It also envisages the
strengthening of GSDA to develop scientific micro level data base and analytical
skills essential to monitor the groundwater conditions and understand the
actual viability of potential management options.
Areas Proposed
1. Recently, GSDA & Central Groundwater Board have published the Report on
Dynamic Groundwater Resources of Maharashtra as on 2011-12. As per this
report, out of 1531 watersheds 76 fall in over-exploited, 4 in Critical, 100 in
semi-critical, 1347 in safe and 4 in poor-quality category. In the entire State
1339 villages falling in over-exploited and critical watersheds have been
notified by the concerned District Collectors under Section 6 of the present
Maharashtra Groundwater (Regulation for Drinking Water Purposes) Act 1993.
Activities
1. Historical Data analysis
GIS data sets for the different districts shall be updated using cadastal
layer and individual watershed clearly redefined.
Regional extent of the different geological formations, hydrogeological
systems shall be defined
All existing monitoring wells located as a separate layer
Geological sections of wells wherever available shall be updated.
2. Baseline Survey: During the baseline survey the village level data like
demographic details, area under different crops during kharif, rabbi and
summer for last two years, existing water conservation structures and their
capacity, existing tanks, ponds and their capacity, irrigation canals and area
under surface irrigation, lift irrigation schemes and area irrigated by them,
existing minor and medium irrigation projects, existing number of dug
wells/borewells/tube wells etc., will be collected. The historical data related to
climate, rainfall, groundwater levels etc., will also be collected from concerned
department and analyzed. It is proposed to purchase the pre-project satellite
imageries for all proposed projects. The data collection work will be initiated
immediately after getting the formal clearance.
a. Subsurface lithological data related to well construction by the
department and private wells shall be analysed to broadly develop the
preliminary subsurface aquifer system profile along specific sections and
on a regional GP and watershed scale.
b. Based on the susbsurface information piezoemeters shall be constructed
to fill the gaps in understanding as well as validate the available
information
c. In newly constructed piezometers geophysical downhole logging shall be
conducted (electrical, gamma, caliper) and the logging data used to
classify the aquifers in combination with drilling data.
d. For the identified aquifres specific smaples shall be analysed for
determining the age of the formation.
e. All available data shall be used to develop a probable aquifer section on
1:10,000 scale (GIS layer).
Water Account
1. The total water availability in each of the project will be assessed with the
help of the Water Resources Department. Similarly, the surplus or excess
run-off will be assessed for the planning of artificial groundwater recharge
measures. Based on the surplus/excess availability of surface run-off, the
allocation for the artificial groundwater recharge would be worked out and
same will be considered for the preparation of Groundwater Management
Action Plan (GWMAP). It is proposed to carry out the aquifer level water
account on the annual basis. The annual estimation of groundwater
resources will have to be carried out on aquifer basis. The working unit for
water account will be a village.
2. GSDA has prepared and published a workbook on Village Water Safety and
Security with the support of UNICEF. GoI is also planning to publish it as a
reference book for NRDWP. It is proposed to use the same for keeping the
water account within the project.
Capacity building
The capacity building of the village and Aquifer Water Management committees
will be done so that they will annually prepare Ground Water use plan coupled
with crop plan in consultation with GSDA and Taluka Agriculture Officer. A
team of dedicated staff at district level will carry out the capacity building work
and will help the VWSC for implementation of groundwater use plan.
Watershed
Formation of VHNWSC
The VWSC have been already formed in each village as per the Mumbai
Grampanchayat Act and the procedures laid down by the Water Supply and
Sanitation Department. The VWSC will be given the responsibility of Village
Committee under this project.
GWMA: After registration of GWMA, the Secretary of GWMA, with the help of SO
will open a SAVINGS account in the name of GWMA in the local branch of
nationalized bank or District Co-operative bank. Wherever required, supporting
document demanded by bank should be provided by the District Team Leader.
This account shall be operated jointly by the Chairman and the Secretary.
NOTE: Secretary cum Treasurer of VWSC and Secretary cum Treasurer of
GWMA shall maintain all books of accounts/ records which will be open for
inspection by DTL/Project leader/auditors/World Bank.
The cost estimates for each structure would be prepared by adapting prevailing
District Scheduled Rates (DSR). The estimates shall also indicate the break-up of
cost on labor and material.
Release of Funds: The project fund will be released in installments as per the
prevailing norms of Shivkalin Pani Sathwan Yojna and NRDWP.
Flow of funds
The funds required for Aquifer Level Groundwater Management Project to be
implemented by GSDA will be transferred to Director, GSDA every year. WSSD
would transfer this fund to Director, GSDA. The fund will be allocated by
Maintenance of Records
The accounts will be maintained by the VWSC as per the guidelines of GoM. The
GWMA will also maintain the accounts with the support from Senior Geologist.
All vouchers will be maintained by VWSC/GWMA which also is required for
auditing of their accounts.
Audit
It is the responsibility of each VWSC as also GWMA to get their accounts audited
by a qualified Chartered Accountant who has been empanelled by the various
District Authorities or by any other Chartered Accountant approved by the
Project Director, RSPMU. The audited annual balance sheet shall be displayed at
published by the VWSC/GWMA for information of the community.
The accounts for the expenditure under project will be audited regularly by the
Accountant General.
Both the parties have desired to put in writing the contents of the MOU as
follows.
Objectives:
The objective of the Aquifer level groundwater management project is to
establish a paradigm shift in the perception of groundwater as a common
property resource and provide an enabling intervention for increasing the
capabilities of the stakeholders and establishing a mechanism to find out
solutions to the groundwater crisis.
The pilot proposes to equip the members of the Aquifer Water
Management Association and Gram Panchayat Level Committee (VWSC) with
necessary data, skill and knowledge to manage available groundwater by
regulating and monitoring their own demand. Access to scientific data and
education about its analysis and use will enable the stakeholders to select
appropriate choices and take decisions regarding use of groundwater.
Educate and train members of VWSC and GWMA to take over collection
of data and its use for calculating groundwater recharge, crop water budgeting,
and allocation of available groundwater among different groundwater user
groups.
Educate and build capability of GWMA and VWSC for preparation of
Groundwater Use Plan and Crop Plan adopting water saving techniques,
improved irrigation and agricultural practices and develop local regulation for
reversing groundwater overuse.
Objective of transferring the responsibility of the groundwater recharge
structures to GWMA is to ensure sustainability of groundwater resources,
maximum water use efficiency, ensure drinking water availability and sustained
productivity.
Duration
Chairman
Senior Geologist, GSDA GWMA
The hydro-geologist will assist the Deputy Director for the entire project and
will work under his control. He will carry out all the technical works proposed
within the project, guide the field units as and when required, and will keep
liaison with GSDA and RSPMU. He will look after the day to day correspondence,
organisetrainings/workshops, meetings and visits, carry out all other
assignments given within the project.
The GIS expert will work under the supervision of the Deputy Director. He will
guide and assist the field staff in preparation of various GIS based maps,
analyses etc. He will prepare uniform guidelines for the preparation of maps,
supervise the data entry work and will prepare reports as per the requirements.
The cell will be headed by District Senior Geologist and it will be comprised of
following posts.
The para professional will have to perform the office work, data entry etc., as
well as the community capacity building of all the project related works.
Besides he will have to carry out all other responsibilities assigned by the DTL
from time to time.
Similarly, the field assistant will work in the field to collect the data and help in
organizing the community.
Note: The cost mentioned is tentative and is subject to variation during actual
implementation.
1. The project will pay a project allowance of 25% on the basic pay plus
grade pay to all persons working on deputation from the government. Since
salaries of persons employed on contract are fixed considering market rates
and include all allowances, contract employees will not be entitled for project
allowance. However, performance of contract employees will be appraised and
depending on the performance, their contracts will be renewed or terminated.
At the time of renewal of contracts, contractual pay will be increased by 10%
over the contractual pay in the preceding year. A HR manual for giving
incentives for encouraging better performance by contractual staff will be
formulated and it will be ensured that staff is retained in the RSPMU /DWSMs
/BRCs. Such HR manual will be developed within first six months of starting the
JS-II program and will be based on existing rules and regulations of Government
of Maharashtra. Detailed qualification requirements and terms of reference for
Block Level: - Selection of staff on BRCs will be done as per WSSD GR.
dated 06.07.2011. However, recruitment on posts of Engineering
Specialists provided under JS-II will be done by calling applications
through advertisement and interviews of shortlisted candidates by a
committee headed by the CEO, ZP. Supdt. Engineer, MJP, Dy. C.E.O.
(WATSAN) and EE RWS Div., ZP will be members on the committee.
5. Composition of DPCC
CEO ZP :- Chairman
SE MJP :- Member
EE MJP Div. :- Member
Sr. Geologist, GSDA :- Member
DHO, ZP :- Member
EO, Primary, ZP :- Member
EE RWS Div., ZP :- Member Secretary
6. Composition of RCMU:
Dy. Engineer - On Deputation
M & E Assistant - On Contractual basis
8. Composition of WSSO
Sr. Name of post Posts On Deputation
No. Proposed From Govt./On
under JS-II Contract
1 Coordinator –Water Quality 01 On Contract basis
2 Engineering Specialist - Water 01 On Contract basis
Quality
3 Data Analyst- Water Quality 01 On Contract basis
6 Engineering Specialist (SLWM) 01 On Contract basis
7 Junior/Sectional Engineer 02 On Contract basis
An officer from the Directorate of Statistics and Economics, GoM, not below the
rank of Dy. Director/Jt. Director will be taken on deputation as M&E Specialist.
Asst. M&E Specialists will be taken on deputation from government, one from
the cadre of Sectional Engineers and the other from the cadre of Statistical
Officers (Class II). Other posts may be manned by hiring persons on contract
basis. An M&E Consultant will be appointed as per requirements. Once the M&E
System is properly established, officers of MJP and WSSO will be trained to
maintain it. On completion of the project, the M&E System will be handed over
to MJP/WSSO for maintenance in future.
DLI
Indicators Data Collection
Methodology
Y1 Y2 Y3 Y4 Y5 Y6
PDO Indicator 1:
Review of district
Number of districts using annual plans;
improved planning ☐ ☐ No. of districts 0 0 0 6 15 24 33 Annual WSSO
Review of annual
processes and
performance
strengthened M&E
reports
systems
PDO Indicator 2:
Percentage of completed
rural water supply
schemes that followed
GoM’s demand Annual
% of rural water
☐ ☐ 0 5 10 15 20 25 30 Annual performance WSSO
responsive approach and supply schemes
reports
exited the
implementation process
with a schedule
performance index of
between 0.75 and 1.25
Core
DLI
Indicators Measure
Y1 Y2 Y3 Y4 Y5 Y6
PDO Indicator 3:
Technical
Number of people in
field visits,
peri-urban villages
review of
who are connected
No. of MJP reports;
to a sustainable ☒ ☐ 0 0 0 85,120 170,240 255,355 340,000 Annual MJP
people annual
water supply system
performance
and
reports and
receive a regular user survey
water service
Intermediate Actions Existin WSSD has WSSD has Strengthe Strengthe Strengthe WSSD Annual Review of RSPMU
Results Indicator to g M&E identified designed ned M&E ned M&E ned M&E carries out WSSO / WSSO
1: Strengthened strength system sector-wide and tested system is system is system is a review reports;
M&E system for en the is M&E needs the fully fully fully of annual
the sector M&E limited and strengthen implement implement implement implement performance
system in formulated ed M&E ed in at ed in at ed in all ation of reports; CEO
scope a plan for system least 10 least 20 30districts the letters to
and is developing districts districts strengthen WSSD
not a ed M&E
☐ ☒
fully strengthen- system
used ed M&E and
consist system, identifies
ently which can required
across be changes
the implement and future
state ed across needs
Maha-
rashtra
DLI
Baseline Collectio
Indicators Measure gy
-n
Y1 Y2 Y3 Y4 Y5 Y6
Intermediate Actions Existing WSSD WSSD At least 6 At least 15 At least 24 All 33 Annual Review of RSPMU/
Results Indicator to planning prepares develops districts districts districts districts district WSSO
2: Improved improve processes and and are using are using are using are using annual
sector planning planning lack publishes dissemina the the the improved plans
process for the processes strategic a five-year tes tools improved improved improved planning
sector orientation sector and planning planning planning framework
strategic guidelines framewor framework framework and are
plan for k and are and are and are producing
improving producing producing producing annual
☐ ☐
the annual annual annual action
quality action action action plans that
and plans that plans that plans that are
consistenc are are are consistent
y of consistent consistent consistent with
district with with with sector
annual sector sector sector strategic
action strategic strategic strategic plan
plans plan plan plan
Core
DLI
PDO Level Results Indicators Unit of Measure Baseline Frequency Source/
Y1 Y2 Y3 Y4 Y5 Y6 Data
Methodology
Collection
Intermediate Results Area 2: Improved Capacity for Program Implementation
Core
DLI
PDO Level Results Indicators Baseline Frequency -ity for Data
Measure Y1 Y2 Y3 Y4 Y5 Y6 Methodology
Collection
Technical field
GSDA,
Intermediate Results visits; review of
No. of aquifer
Indicator 6: No. of AWMIs ☐ ☐ 6 0 10 15 20 25 30 Annual reports prepared
AWMIs management
successfully implemented by GSDA; and user
associations
survey
Intermediate Results
Indicator 7:
☐ ☐ % of GPs 10 10 15 20 25 35 40 Annual Household survey WSSO
Percentage of GPs that
maintain ODF status
Core
DLI
Baseline Collection
Indicators Measure
Y1 Y2 Y3 Y4 Y5 Y6
Intermediate Results Area 3: Improved Access to Quality and Sustainable Water and Sanitation services in Peri-urban Villages
Intermediate Technical field
Results Indicator visits, review of
No. of
8: MJP reports;
house
☒ ☒ 0 0 0 17,024 34,048 51,071 68,095 Annual annual MJP, IVA
No. of house connecti
performance
connections to a ons
reports and
commissioned water user survey
supply system
Intermediate
Results Indicator
9: Technical field
visits, review of
No. of houses No. of
MJP reports;
connections to a house
☒ ☒ 0 0 0 0 17,024 34,048 51,071 Annual annual MJP, IVA
sustainable water connecti
performance
supply system ons
reports and
receiving a regular
user survey
water service
Core
DLI
Baseline Collection
Indicators Measure
Y1 Y2 Y3 Y4 Y5 Y6
sustainable sullage user survey
collection and safe
disposal system
Intermediate Results Area 4: Improved Access to Safe Water Drinking Water in Water-stressed and Water Quality-affected Areas
Intermediate
Technical field
Results Indicator No. of visits, and
11: ☒ ☐ 0 0 250 450 580 -- -- Annual WSSD, IVA
CSSWS household
survey
No. of CSSWSs
Allocated
amount for
6.0 6.0 6.0 6.0 6.0 6.0
DLI# 2 (US$
million):
DLI#3: No. of
house
connections to a
commissioned 40 24% 0 0 0 17,024 34,048 51,071 68,095
water supply
system (targets
are cumulative)
Allocated
amount for 0 0 10 10 10 10
DLI#3 (US$
million):
DLI#5: No. of
30 18% 0 0 250 450 580
CSSWS (targets
are cumulative)
Allocated
amount for
0 12.93 10.35 6.72 0.00 0.00
DLI#5 (US$
million):
Total
Financing 165 100% 7.00 33.93 41.35 36.22 23.25 23.25
Allocated (US$
million)
No. DLI Definition/ Scalability of Protocol to Evaluate Achievement of the DLI and Data/Result Verification
Description of Achievement Disbursements Data Source/Agency Verification Procedure
(Yes/No) Entity
1 DLI#1: In Year 1, disbursements will be In Period 1 and 2, RSPMU/WSSO to
Strengthened M&E triggered when WSSD has defined prepare annual progress reports on
system for the sector-wide M&E needs and No RSPMU/WSSO Independent M&E needs identification and
sector develops an implementation plan external entity system design and testing.
for a strengthened M&E system. to be In Period 3-6, full implementation
In Year 2, disbursements will be contracted by of a strengthened M&E system will
triggered when WSSD designs and WSSD be judged when the district CEO of
tests the strengthened M&E system. the ZP provides a letter confirming
In Years 3, 4 and 5, disbursements that: (i) the system has been
will be triggered when the installed and is functional as per
strengthened M&E system is fully requirements and specifications; (ii)
implemented in at least 10, 20 and training has been undertaken; (iii) a
all 30 districts, respectively, team has been appointed at the
In Year 6, disbursements will be district which will be in charge of
triggered when WSSD carries out a the M&E system, and that it has
review of implementation of the verified all previous year’s data in
strengthened M&E system and the system; and (iv) at least one
identifies required changes and annual performance report has
future needs. been prepared and submitted to
WSSD covering the minimum set of
indicators outlined above, together
with a short narrative on any
performance shortfalls and an
action plan to address the shortfalls.
DLI Bank Of which Financing Deadline Minimum DLI Maximum DLI Determination of Financing
Financing Available for for DLI Value to be Value(S) Expected Amount to be Disbursed Against
Allocated Achievem Achieved To to be Achieved for Achieved and Verified DLI Value(S)
No. to the DLI ent Trigger World Bank
Prior Advances
Disbursements Disbursements
results
of World Bank Purposes
Financing
In Period 4 of Program
implementation, US$1 million
may be made available by the Bank
for withdrawal by the Recipient
when the strengthened M&E
system is fully implemented at
least 20 districts.
In Period 5 of Program
implementation, US$1 million
may be made available by the Bank
for withdrawal by the Recipient
when the strengthened M&E
system is fully implemented at
least 30 districts
In Period 6 of Program
implementation, US$1million may
be made available by the Bank for
withdrawal by the Recipient when
WSSD has carried out an
evaluation of the implementation
Process for the M&E system and
identified required changes and
future needs.
3 DLI#3: 40 0 40 Results DLI value must 68,095 For each house connection that is
No. of will be be greater than made to a commissioned water
house verified zero supply system, an amount of
connectio annually US$587 per connection may be
ns to a and made available by the World Bank
commissi reported for withdrawal by the Recipient
oned in the
water month of
supply March
4 DLI#4:
system 25 0 0 Results DLI value must 68,095 For each house connection to a
No. of will be be greater than sustainable water supply system and
housecon verified zero receiving regular water service, an
nections annually amount of US$367 per connection
to a and may be made available by the World
sustainab reported Bank for withdrawal by the
le water in the Recipient
supply month of
system March
and
receiving
a regular
water
service
5 DLI# 5. 30 0 0 Results DLI value must 580 For each community safe and secure
No. of will be be greater than water system, an amount of
CSSWS verified zero US$51,724 may be made available
annually by the World Bank for withdrawal
and by the Recipient
reported
in the
month of
March
DLI 5 relates to number of community safe and secure water system (CSSWS),
in water stressed or water quality affected areas receiving regular water supply
with minimum water quality standards. In this DLI also, disbursement of funds
will be linear, scalable and proportionate to achievements.
Efficiency
Inclusiveness
Transparency
Managing their own funds
Mobilizing Peoples contribution
Aquifer level commission established within PY1
Increase in access to clean water and sanitation services by poorest
households in each GP.
Improved household perception in the access to water and sanitation
services.
Community satisfaction on sub project implementation.
Increased ownership of sub project assets.
Increased willingness by communities to maintain sub project assets.
Increased transparency of project information at community level.
Number of GPs planning, implementing and managing sustainable
service delivery to GPs.
Number of VWSCs managing operating and maintaining facilities.
Improved community perception of Gram Sabhas and GPs.
Number of tribal (indigenous people) VWSC managing O&M and
collecting cash contributions.
Village action plans and sanitation facilities constructed and
operational.
Decrease in number of complaints about quality of water, inexistence or
poor state of facilities and constraints in accessing them.
Number of village action plans completed in time and operational.
Number of VWSC trained and effectively conducting O&M Operations.
Number of VWSCs managing, convening meetings and consultations on
key issues.
Numbers of VWSCs prepare WSS proposals meeting the appraisal
criteria.
No of MIS reports on grievance redressal generated.
AND
2. Whereas, the details of the Location of the land are given below:
Location Details
Village
Gram Panchayat
Block/ Taluka
District
Title Holder/ Encroacher Details
Name of Title Holder/Encroacher
Father/ Husband’s Name of Title
Holder/Encroacher
Age occupation Residence
Gender
Schedule -Land Details/Structure
Land in Question
Area
Location
North Boundary
East Boundary
West Boundary
South Boundary
3. Whereas the Title Holder is presently using/ holds the transferable right
of the above mentioned piece of land in the village mentioned above.
Whereas the Encroacher does not hold any transferable rights of the
The purpose is to provide step by step action required within a given timeline
to plan and execute a scheme which is technically, environmentally and socially
feasible and before withdrawal formulating strategy to institutionalize O&M
arrangement to achieve “sustainability. Complete sub-project cycle is designed
to ensure that it is in compliance with the rules and procedures agreed upon for
the “Program”.
Time line for Community Safe & Secure WSS for Water Quality Affected Areas
III. Aquifer Level Ground Water Management (Detailed Sub-Project Scheme Cycle
for Aquifer Level Groundwater Management is given in Annexure 29)
Sr. Responsibilit
Activity Social Management Actions Timeline
No. y
A Pre-Planning Phase 3 Months
Support Hiring Support Organisation for the Dy. CEO,
1 Organisation District. Month 1
DWSM
Selection &
Agreement with empanelled
Agreement for VWSC, GP,
8 Engineering consultant for preparation Month 6
preparation of MJP, ZP
of DPR
DPR
Identification of land for project
facilities.
In case of Government Land, transfer
Land for the same to project.
9 Project In case of direct purchase, register in Month 7 VWSC
facilities the name of GP.
In case of Voluntary Donation follow
and document the process as described
in the Annexure.
Mobilizing and sensitizing
Community
10 communities for contributions as per Month 7 SO
Contribution
Government policy
Month 18
Preparation of Bills DE, RWSD
onwards
Technical
Review of bills and recommendation Month 18
3 approval of GP
for payment onwards
bills
Check appropriateness of bills and Month 18
EE, RWSD
advise RWSD onwards
Payments to Release payments on the approval of Month 18
4 VWSC
contractors RWSD onwards
Implementat
ion
Completion
Water Preparation of the Implementation
5 Month 34 DE, RWSD
Supply and Phase Completion Reports (IPCRs)
Sullage
Treatment
schemes
Accounts
Utilization Preparation of Utilization Certificates.
6 Month 34 Coordinator,
certificates GP/ VWSC submits certificates
DE, RWS Sub-
Prioritization based on
selection criteria done
Approval of the list
GP/ villages are
informed of the
Selecting GP/ Week 5 DPCC/Deputy
6 selection
Villages onwards CEO, (WATSAN)
Disseminate
information about
selected GP/ villages
in print and electronic
media
B Planning phase 4 Months
Identification of User
Activation/Forma
1 Groups. Week 9 BRC/SO
tion of VWSC
Motivation and
Preparation and
approval of bid
Week 26 EE, RWS Div.
documents (Draft
1 Bidding Process Tender Papers, DTP).
Publishing of Tender
Notice Week 27 GP
Sale of Bid Documents
Receipt of Bids Week 31 EE, RWS Div.
Evaluation of Bids ,
Award Week 34 EE, RWS Div.
Recommendations
Contract Award Week 36 GP
Progress and Quality
Week 36
Monitoring as per VWSC
onwards
contract agreement
Construction of
Social Audit of
2 water supply
expenditure tracking
system Week 36
contract SAC
onwards
Disseminate findings
of SAC in Gram Sabha
Week 36 DE, RWS Sub-
Preparation of Bills
3 Passing of bills onwards Div
Review of bills and Week 36 GP
Hiring of Hydro-geologist,
and GIS Specialist. RSPMU,
2 Staffing SDS and IEC Spl in DWSM Month 0-1 Director, GSDA,
Cell will work on this DWSM Cell
project.
Watersheds/ GPs
shortlisted based on Month 0 GSDA
Selecting selection criteria.
3 Watersheds/ Approval of the Selection
Director, GSDA
GPs List.
Month 2-3 DWSM Cell & Sr
GP are informed of the
Geologist
selection.
IEC campaign in the
DWSM Cell SO
project villages. Month 3
Dissemination of
Communicati-on information of selected Month 3 GSDA
4 villages.
Campaign
Orientation to all GPs,
Sarpanch and other key Month 3
SO
officials for creating onwards
awareness.
Basic & Historic Data Month 0-3
5 Data Collection Collection of the project GSDA
area
B Planning phase 18 Months
Aquifer Mapping and
1 delineation of aquifers – Month 4-18 GSDA
Watershed wise
2 Social Assessment Survey Month 4-7 SO
Month 4 VWSC/SO/
3 Water Account
Detailed Hydro- onwards GSDA
geological Procurement of Month 4
Survey equipments onwards
Installation of rain gauge, Director, GSDA
4 establishing groundwater Continuous Sr. Geologist &
& water Quality VWSC
monitoring network and
periodical monitoring
GW Preparation of Month 19-21
VWSC & GWMA
5 Management Groundwater
& GSDA
Action Plan Management Action Plan
Conducting feasibility
analysis.
Agreement arrived at
with regard to technology
options, location of
facilities, etc.
Identifying Sr. Geologist,
VWSC meeting held and
13 technology Month 18-21 GSDA with the
decision on contributions
options support of SO
taken.
Mahila Gram Sabha and
Gram Sabha endorse the
decisions.
GWMA endorses
decisions.
Quarterly
Review contractor’s
reviews of
5 performance on-site with Periodic VWSC
contractor’s
community participation.
performance
Conduct a Social Audit
6 Social Audit exercise after three Month 35 SAC
months of completion.
GSDA withdraws support.
Exit from
7 VWSC takes full control of Month 36 GSDA/ZP, VWSC
scheme
infrastructure.
Assessment of
External
Institutional Capacity to Month36
Consultant
8 Evaluation sustain investments.
Month 36 External
Impacts on beneficiaries.
onwards Consultant
Administrative approval
17 Month 12 CEO, ZP
for DPR accorded.
Approval communicated
18 Month 12 SO
to community members.
C Implementation phase 12 Months
Preparation and sale of
Bidding bid documents VWSC/ RWS
1 Month 12
Process Orientation on Bid Div./GSDA
documents to VWSC.
S. No. Activity Peri urban Peri urban Aquifer RWH Works in PHD Water GSDA
WSS>Rs 7.5 WSS < INR works tanks water quality Quality Water
crores 7.5 crores habitations, labs Quality
labs
1 Tentative source selection MJP ZP GSDA /ZP GSDA/ZP
2 Consumer survey and GIS survey MJP ZP
3 Decide scope of DPR MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
4 DPR MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
5 Preparation of hydraulic designs MJP ZP GSDA / ZP /ZP GSDA/ZP
6 Preparation of estimates MJP ZP GSDA / ZP /ZP GSDA/ZP PHD/PWD GSDA &B&C
7 TS of DPR MJP/RSPMU ZP GSDA / ZP /ZP GSDA/ZP PHD/PWD GSDA &B&C
8 AAof DPR MJP/RSPMU ZP GSDA / ZP G/ZP GSDA/ZP PHD/PWD GSDA &B&C
9 Preparation of bid documents MJP ZP GSDA / ZP / /ZP GSDA/ZP PHD/PWD GSDA &B&C
VWSC
10 Invitation for bids MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
11 Bid receipt and evaluation MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
12 Award MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
13 Sign Contract agreement MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
14 Implementation - day to day MJP ZP GSDA /ZP GSDA/ZP PHD/PWD GSDA &B&C
supervision
15 Independent Construction quality RSPMU RSPMU RSPMU RSPMU RSPMU RSPMU RSPMU
surveillance
16 Contract management MJP ZP GSDA ZP ZP PWD B&C
17 Payments MJP ZP GSDA ZP ZP PWD B&C
A GP wide master plan for SLWM will be prepared by the GP with the help of
ZP/consultants along with community consultation and, implemented by the
Project GPs with technical support of ZP. The SLWM Plan will include
environmental sanitation facilities (both on onsite and offsite) like: (i) Provision
of small bore sewers (where appropriate) for liquid waste management for safe
disposal of sullage from the households, and (iii) Proper collection and disposal
of solid waste.
Scope of Work of SLWM Plan: The scope of work of “preparation of SLWM
Plan for creating onsite and offsite facilities as appropriate for solid and liquid
waste management” is described below.
i. Conducting detailed engineering survey (by Total Station Method) along
the roads of entire GP and prepare a base road map with levels, lengths
and widths of the various roads and lanes. This plan might have been
prepared for peri-urbanGP‘s water supply.
ii. Depending on service levels of water supply, soil percolation rates and
ground water table, decide whether a household soak pit is a feasible
option for sullage disposal.
iii. If soak pits is not a feasible option, propose examine feasibility of small
bore sewerage system for collection and disposal after treatment.
iv. Assess the type and quantities of household solid waste generated and
find whether back yard garbage pit for composting the organic waste is
feasible if space is available.
v. If back yard garbage pit is not feasible due to lack of space, provide a
community garbage collection and disposal facility,
vi. Study if segregation of recyclable plastic and other waste is possible at
household level for separate disposal.
vii. Assess the present method of disposal of cattle waste along with its
impact on the cleanliness and examine the feasibility of common
composting for cattle waste
viii. Assess scope for installation of facilities for bio gas digesters either
individual or community,
29
GOM GR – JSP – 0114/CR05/WS Dated 06th Feb 14
Table No. - 3
Jalswarajya - II Implementation, 60 GPs ( Peri Urban) /Village Level
Sr. Name of post Posts Per Total Deputation
No. GP No. Contract
of
Posts
Support Staff for assisting Gramsevaks in On Contract
1 1 60
Peri Urban GPs Basis
Total 1 60
Table No. - 4
District GSDA Level Posts for Implementing Aquifer
Management Activities in 07 Districts
Sr. Name of post No. of Posts Per Total Posts Deputation
No. District under JS-II Contract
1 Hydro-Geologist 2 14 On Deputation
From Govt./On
Contract
2 GIS Expert 1 7 On Contract Basis
3 Para 1 7 On Contract Basis
Professional
4 Field Assistant 1 7 On Contract Basis
( Khalasi)
Total 5 35
30
GOM GR – JSP 1213/CR-200/WS-11 Dated 04th Jan 2014
GOM GR – JSP 0114/CR-06/WS-11 Dated 07th Feb 2014
GOM GR – JSP 0114/CR-28/WS-11 Dated 10th Feb 2014
GOM GR – JSP 0214/CR-33/WS-11 Dated 10th Feb 2014
GOM GR – JSP 2014/CR-34/WS-11 Dated 17th Feb 2014
Table No. - 6
Special Monitoring Cell (Tech) RSPMU
Sr. Name of post No. of Posts Deputation Contract
No.
1 Superintending Engineer 1 On Deputation From Govt./MJP
2 Executive Engineer 1 On Deputation From Govt./MJP
3 Dy. Engineer 1 On Deputation From Govt./MJP
4 Sectional/Jr. Engineer 1 On Deputation From Govt./MJP
5 Asst. Accounts Officer 1 On Deputation From Govt./MJP
6 Para Professional 2 On Contract Basis
Total 7
Table No. - 7
Special Monitoring Cell in GSDA/HQ
Sr.No. Name of post No. of Posts Deputation Contract
1 Dy. Director GSDA 1 On Deputation From Govt.
2 Hydro-geologist 1 On Deputation From Govt.
3 GIS Expert 1 On Contract Basis
4 M&E Assistant 1 On Contract Basis
5 Para Professional 1 On Contract Basis
Total 5
Table No. - 8
Special Monitoring Cell in PHD ( PH/Labs)/State Level
Sr.No. Name of post No. of Posts Deputation Contract
Table No. - 9
Sector Strengthening/WSSO Strengthening /State Level
Sr.No. Name of post No. of Posts Deputation Contract
Table No. - 11
Sector Strengthening RWS Sub-Division ( No. 173)
Sr.No. Name of post Posts Per SRWS Total No. Deputation Govt.
Sub-division level of Posts Contract
1 Consultant (WQ) 1 173 On Contract Basis
2 Village Accounts 1 173 On Contract Basis
Coordinator
Total 2 346
REPORT
Regarding complaints on fraud and corruption in
“Maharashtra Rural Water Supply and Sanitation Program”
The World Bank will support a portion of this program over a 6-year period
(2013-2019) focusing on two primary activities: (i) institutional capacity
building for planning, implementation and monitoring of the sector across the
state; and (ii) physical investments for water supply and sanitation in large
peri-urban Gram Panchayats, and in water-stressed and water-quality affected
areas, in selected representative districts across the state, based on transparent,
pre-defined, and demand-driven criteria. These two activities reflect the
underlying challenges discussed above.
The proposed scope and methodology for developing a robust M&E system, as
envisioned above, is detailed below for aiding the consultant in shaping their
work plans. The consultant is free to suggest appropriate amendments to the
scope and methodology based on their experience and insights. In undertaking
this assignment, the consultant shall coordinate with the M&E teams from the
RSPMU and WSSO.
13. Reporting
The Consultancy shall carry out the assignment under the overall supervision of
the Principal Secretary, WSSD. However, day-to-day activities for the
establishment of M&E system shall be managed and coordinated under the
guidance and supervision of the Project Manager/the Project Director in the
Reform Support and Project Management Unit (RSPMU). The Consultancy shall
submit accurate and timely periodical reports, supported with proof, about
progress in the assignment to the Principal Secretary, WSSD as well as to the
Project Director. The RSPMU shall provide the Consultancy with access to
relevant data, documents necessary, Program sites and locations, if necessary.
1. Introduction
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program,
and intends to apply part of the proceeds for consultancy services for
independent verification of results for Rural Water Supply and Sanitation
(RWSS) sector under the JS-II.
The development objective of the World Bank aided Program is to improve the
performance of GoM’s RWSS sector institutions in planning, implementation
and monitoring of its programs and to improve access to quality and
sustainable water services in large peri-urban areas, and in water–stressed and
water quality-affected areas.
The program is designed using the new World Bank lending instrument
(Program-for-Results) in which financial disbursements are linked to
achievement of pre-agreed results (hereinafter called Disbursement Linked
Indicators or in short DLIs). GoM intends to hire a reputable company/entity
with expertise in performance/technical auditing to act as an Independent
Verification Agency (IVA) for the Program.
Under its current RWSS program, GoM seeks to significantly expand the
frontiers in the sector with a focus on increasing house connection coverage,
ensuring continuous water supply with adequate pressure and minimum
quality standards and ensuring that 100 percent of the rural population have
access to safe water and basic sanitation. Maharashtra is also a rapidly
urbanizing state with many large villages (with population more than 10,000
people) and a growing number of peri-urban villages that are demanding higher
levels of service. Finally, the state also faces challenges in addressing the needs
of water-stressed and water-quality affected areas, managing drinking water
quality, and ensuring drinking water security in the face of increasing droughts
and climate change impacts on rainfall patterns and the yield of existing
sources. A robust Monitoring and Evaluation (M&E) system is essential to
support the planning and effective implementation of this program.
3. Program Description
GoM has an existing RWSS program that is fully aligned with and driven by
Government of India’s National Rural Drinking Water program (NRDWP) for
water supply, and Swachh Bharat Mission (Gramin) (SBMG) for sanitation. The
overall objective of GoM’s RWSS program is to increase access to safe drinking
water and sanitation services to rural communities at an affordable cost and in
The World Bank will support a portion of this program over a 6-year period
(2013-2019) focusing on two primary activities: (i) institutional capacity
building for planning, implementation and monitoring of the sector across the
state; and (ii) physical investments for water supply and sanitation in large
peri-urban Gram Panchayats, and in water-stressed and water-quality affected
areas, in selected representative districts across the state, based on transparent,
pre-defined, and demand-driven criteria. These two activities reflect the
underlying challenges discussed above.
In order to provide evidence of continued progress towards the PDO, GoM and
the World Bank have also agreed on a set of intermediate results indicators that
will be used to measure and track intermediate results or intervening steps
towards the PDO. There are two types of intermediate results indicators: those
that are linked to disbursements, referred to as ‘disbursement-linked indicators
GoM and the Bank team have agreed on a set of fiver DLIs as shown in Table 1
above. The choice of DLIs was based on four factors: i) the signalling role of the
indicator –i.e. whether it signals a critical action along the results chain; ii) the
perceived need to introduce a strong financial incentive to deliver the activity
and iii) the practical aspects of verifying achievement; and iv) GoM’s capacity to
achieve the DLIs durig the implementation period of the PforR operaion.
DLI#1 and DLI#2 signal critical actions along the results hain without which the
PDO cannot be achieved. DLI#3, DLI#4 and DLI#5 provide funds against
performance (achievement of priority outputs) to encourage the practice of
managing for results and a stronger focus on actual service improvement.
6. Scope of Service
The IVA will confirm achievement of each Program DLI based on a desk review
of program monitoring reports and sample verification of data and evidence.
The task of the IVA will include, but not necessarily be limited to the following:
With respect to DLI#3 AND DLI#4, the IVA will carry out a physical
independent verification of a random sample of no less that 5% of connections
per water scheme in all schemes, as well as a scheme survey to validate
operational performance parameters.
With respect to DLI#5, the IVA will carry out a physical verification of a random
sample of no less that 5% of community safe and safe secure water systems to
verify the minimum requirements as laid out in the Verification Protocol.
The IVA should be able to propose at least 02 [Two] teams of technical experts
for physical verification that:
Have knowledge if RWSS sector in India
Have at least 10 [Ten] years of experience in technical audit of water
supply systems and/or delivery process
Are familiar with the relevant WSS technical standards and norms in
Maharashtra
Are not currently employed by GoM or any of the RWSS sector
institutions covered by the IVA servces.
9. Terms of Employment
The IVA shall be offered a Contract for a period of three (3) years, renewable for
up to three (3) periods of one year upon satisfactory performance. The terms of
employment shall be “on call” basis. The IVA should expect to begin work in
August, 2014. The work is expected to be completed by August, 2017. The total
estimated level of effort is 04 [Four] man-months effort per year.
A fixed (lump sum) fee for developing verification methodology,
including sample plan, source of information, instruments for data
collection, field procedures, and quality control plan, reporting formats,
software and hardware requirements etc.
A fixed (lump sum) fee per each for DLI verified.
A fixed (lump sum) fee per each DLI re-verified (if requested by WSSD)
11. Reporting
The IVA shall carry out the assignment under the overall supervision of the
Principal Secretary, WSSD. However, day-to-day management of the verification
process shall be managed and coordinated under the guidance and supervision
of the Project Manager/the Project Director in the Reform Support and Project
Management Unit (RSPMU). The IVA shall submit the DLI Verification Reports
to the Principal Secretary, WSSD. The IVA shall ensure that the Verification
Reports are timely, accurate and objective and are backed up by evidence and a
clear rationale. The IVA will be required to make presentations as needed in
Mumbai and clarify in a timely manner any issues and questions raised by
WSSD and the World Bank.
The RSPMU shall provide the IVA with access to relevant data, documents
necessary, to verify DLI achievements. The RSPMU shall make arrangement to
ensure that the IVA’s staff and Consultants have access to all Program sites and
locations.
Objective:
The objective of appointing an IT Specialist is to provide IT support for
establishing an independent, efficient, user-friendly and robust monitoring and
evaluation system for RWSS sector and the JS-II Program. The IT Specialist is
expected to support the Reform Support Project Monitoring Unit (RSPMU) and
the M&E Consultant in designing the softwares for the M&E system and suggest
appropriate hardwares in coordination with M&E consultant. In addition the IT
Specialist will also work with the Water Supply and Sanitation Organization
(WSSO) for all the state programs. The IT Specialist will also provide ongoing
support to the implementation of the IT softwarer developed.
SCOPE OF WORK:
The IT Specialist will be part of the RSPMU and will report to the Project
Manager. The IT Specialist will be responsible for the overall coordination of all
IT related Program activities and achievement of Program objectives within the
time schedule and within the financial plan.
The IT specialist will also support the state sector institutions such as Water
Supply and Sanitation Organization (WSSO) to manage the implementation of
all IT related activities.
COMMUNICATION:
The IT specialist will report to the Project Manager and coordinate with the
Director WSSO, as required, but may communicate directly with the sector
institutions implementing the Program components for IT related works.
For strategically important decisions regarding the duties (assignments)
described in the Terms of Reference, the IT Specialist needs to obtain approvals
of the Project Manager, RSPMU or appropriate authorities from time-to-time.
REPORTING:
Prepare Monthly Progress Reports for all IT related activities;
Prepare Quarterly Reports for the IT parts implementation, to be used for
the preparation of the QRs to the Project Steering Committee;
Prepare Minutes/Official notes from the meetings of the IT Working groups;
Prepare Minutes from the meetings with the IT supplier’s and IT
consultants.
MEETINGS:
The IT Specialist will:
Participate in the Program Steering Committee meetings, if requested;
Have weekly meetings with the IT Working Groups;
PERIOD OF PERFORMANCE:
The period of assignment is June, 2014 to May, 2017, renewable on an annual
basis.
ESSENTIAL QUALIFICATION:
The IT Specialist should hold a B.E. or B.Tech. or M.E. or M.Tech. in IT/Computer
Science/ECE or M.C.S. or M.C.A. degree in first class or equivalent grades from a
recognised university, should be fluent in communications in English and
Marathi languages, should be familiar with working on SQL server, working on
heterogeneous languages and contemporary databases, open source
technologies, modern application development languages and script languages
like Java, ASP, Dot Net, HTML, DHTML, PHP etc.
DESIRED QUALIFICATIONS:
Candidates with an M.B.A. or PMP or any post graduate degree/diploma in
Environmental Engineering/Sciences/Water, Sanitation & Hygiene will be given
preference.
DESIRED EXPERIENCE:-
Candidates having experience of working in water and sanitation sector or in
rural health or rural development sectors with government or semi-
government organisations will be preferred.
REMUNERATION:-
Consolidated monthly remuneration of Rs. 50,000/- to Rs. 75,000/-
(negotiable depending on education and qualifications) shall be paid to the
incumbent. TA/DA shall be applicable as per Grade Pay Rs. 5400/-.
Objective:
The objective of hiring a Knowledge Management Specialist is to design and
implement appropriate Knowledge management activities for the JS-II teams in
specific and also the RWSS teams in general for keeping them updated on latest
developments in the sector.
Scope of Work:-
The Knowledge Management Specialist (KMS) will be part of the RSPMU and
will report to the Project Manager. The Knowledge Management Specialist will
be responsible for the overall coordination of all knowledge management
related activities, including web-based activities and will also provide guidance
and support to the state level and district level officers under the other RWSS
sector institutions in the state, mainly the Water Supply and Sanitation
Organization (WSSO).
COMMUNICATION:-
The KM Specialist will report to the Project Manager of RSPMU. For strategically
important decisions regarding the duties (assignments) described in the Terms
of Reference, the KM Specialist needs to obtain approvals of the Project
Manager, RSPMU or appropriate authorities from time-to-time.
MEETINGS:-
The Knowledge Management Specialist will:-
Participate in the Program Steering Committee meetings, if requested;
Have periodical meetings with the KM Working Groups and consultants;
Organise ad-hoc meetings, when necessary.
PERIOD OF PERFORMANCE:-
The period of assignment is June, 2014 to May, 2017, renewable on an annual
basis.
ESSENTIAL QUALIFICATIONS:
Candidates should hold a post graduate degree in Communications or
Behavioural Sciences or Mass Communications and Journalism or an equivalent
qualification from a recognized university. The KMS should have thorough
knowledge of RWSS/rural development programs and stakeholder needs,
documentation system and IT Systems. The KMS should have demonstrable
skills in Program management and in working effectively within
multidisciplinary teams. The KMS should have excellent communication skills in
presenting, discussing and should be fluent in communicating in Marathi and
English languages. The KMS should be able and willing to undertake travel
within the state and outside, as required.
DESIRED QUALIFICATIONS:
Candidates with relevant degree/experience in designing KM systems, IT
platforms and producing electronic/print media publications will be given
preference. Sound knowledge of information technologies and its applications
like GIS/GPS, networking skills will be essential.
Experience:
At least Seven 7 (seven) years of direct relevant work experience as Knowledge
Management Specialist having handled responsibilities with a substantial
content in the knowledge management sector; Good knowledge of all concepts,
principles and approaches to knowledge management systems followed by the
state Government, Govt of India and Multilateral Financing Institutes like
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II). The WSSD is already implementing programs like NRDWP and
SBMG in the state. The GoM intends to hire on contractual basis, a reputable
entity with expertise in information, education and communication for the
sector including the JS-II Program. The objective of appointing an IEC Specialist
is to provide support for designing strategy and campaign for disseminating
/communicating information about Jalswarajya-II and various other sector
programs to different stakeholders and planning, designing implementing IEC
activities for RWSS sector. The IEC Specialist is expected to support the RSPMU
for monitoring different indicators pertaining to IEC activities under different
RWSS sector programs. IEC Specialist is expected to support the RSPMU and
various consultants in identifying capacity building indicators and processes
which will be useful for designing software’s pertaining to capacity building and
social management for web-based M&E system. IEC Specialist will suggest
appropriate measures for grounding the IEC part in the M&E system effectively,
in coordination with M&E Consultant and M&E Specialist.
Scope of Work:-
Assistant IEC Specialist will be part of the Reform Support Reform Support and
Project Management Unit (RSPMU) and will report to the Project Manager and
will be responsible for the overall coordination of all IEC activities in program
implementation in order to ensure that the related program objectives are
achieved within the time schedule and within the financial plan.
Assistant IEC Specialist will support the WSSD, RSPMU and the sector
institutions to manage and implement all IEC activities and will provide
guidance and support to all stakeholders as and when required.
Communication:-
The Assistant IEC Specialist will report to the Project Manager. For strategically
important decisions regarding the duties (assignments) described in the Terms
of Reference, the Assistant IEC Specialist needs to obtain approvals of the
Project Manager, RSPMU or appropriate authorities from time-to-time.
Reporting:-
Report to the Project Manager at state level.
Prepare Monthly/Quarterly Progress Reports on the agreed action plan
on IEC ;
Prepare Minutes/Official notes of the meetings of the IEC Working
groups;
Prepare Minutes from the meetings with the consultants.
Period ofPerformance:-
The period of assignment is June 2014 – May, 2017, renewable on an annual
basis. The selected candidate will be based in Mumbai.
Desirable Qualifications
Candidates with degrees like Ph.D. or an M.B.A. or a post graduate
Diploma in Public Relations/Advertising/Business Management/Public
Finance/ Public Health will be given preference.
Experience
Experience of working in a reputed educational institute or in
government/semi-government offices or in private sector in participatory
community development activities for at least seven (5) years, preferably,
in water supply and sanitation sector.
Previous experience of working successfully with marginal/vulnerable
groups, expertise in participatory social assessment using various tools
and social marketing will be preferred.
Experience of working with multilateral financing agencies/external aid
agencies will be preferred.
I. Program Background
a. The Government of Maharashtra (GoM) seeks to significantly expand the
frontiers in the sector with a focus on increasing house connection coverage,
ensuring continuous water supply with adequate pressure and minimum
quality standards, and ensuring that 100 percent of the rural population has
access to safe water and basic sanitation. However, delivering this vision
requires building capacities of institutions through appropriate
implementation and management models. Maharashtra is also a rapidly
urbanizing state with many large villages and a growing number of peri-
urban areas that are demanding higher levels of service. Additionally, the
state also faces challenges in addressing the needs of water-stressed and
water-quality affected areas, managing drinking water quality, and ensuring
drinking water security in the face of increasing droughts and climate
change impacts on rainfall patterns and the yield of existing sources.
b. GoM has an existing RWSS program that is fully aligned with and driven by
Govt of India (GoI)’s National Rural Drinking Water Program (NRDWP) for
water supply, and Swachh Bharat Mission (Gramin) (SBMG) for sanitation.
The overall objective of GoM’s RWSS program is to increase access to safe
drinking water and sanitation services to rural communities at an affordable
cost and in an environmentally sustainable manner. GoM’s RWSS program is
in line with the national vision and goals, and also supports the
constitutional mandate of strengthening devolution. GoM has demonstrated
its commitment to the objectives of its RWSS program by developing
relevant policies and guidelines for program implementation, allocating
requisite financial resources and putting in place mechanisms to strengthen
decentralized sector governance structures.
II. GoM has received funding from the World Bank to support the Maharashtra
Rural Water Supply and Sanitation Program (Jalswarajya-II). The Bank will
support a portion of this program over a six-year period (2014-20) focusing
on two primary categories of activities: (i) institutional capacity building for
planning, implementation, and monitoring of the RWSS sector across
Maharashtra; and (ii) in select districts, implementation of: (a) Water supply
and Sullage management service improvement in peri-urban villages, and
(b) Water Supply service improvement and improved groundwater
management practices in water-stressed and water-quality-affected areas.
Program support under this category would be limited to twelve districts
(two each from the six administrative divisions of the state) selected based
The Water Supply and Sanitation Department (WSSD) of the state will be
the nodal agency for implementing the Program. A Reform Support and
Project Management Unit established under the previous project will
coordinate the program activities. WSSD has a Water Supply and
Sanitation Organization (already established at the state level based on
GoI guidelines for the sector for institutional capacity building, technical
assistance, communication and sector monitoring) which will be
responsible for these functions for the Program as well.
The two technical agencies under WSSD–Maharashtra Jeevan
Pradhikaran (MJP) (which is the state Water Board) and Ground Water
Surveys and Development Agency (GSDA) - will support program
implementation respectively for peri-urban water supply and sullage
schemes, and for ground water management initiatives.
The district and sub-district level institutions – Zilla Parishads (ZP) and
Blocks will implement community safe and secure water supply schemes
and sanitation improvement initiatives.
The Public Health Department (PHD) will support in strengthening its
laboratories across the state.
III. Objective
The objective of the program is to improve the performance of
Maharashtra’s sector institutions in planning, implementation and
monitoring of its RWSS program and to improve access to quality and
sustainable services in peri-urban villages, and in water–stressed and water
quality-affected areas. In order to improve the institutional capacities, it is
proposed to engage Support Organization for assisting in undertaking the
community support, implementation and monitoring functions including
V. Duration
The assignment will be for five years. However, the contract will be initially
given for three years which will be extended depending upon the
performance.
VI. Deliverables
Inception Report within one month highlighting plan, methodology,
team details, formats, etc.
Monthly progress reports in accordance with the agreed action plan and
format.
Thematic quarterly reports on inclusion, participation, transparency and
on access to subsidy in accordance with legal and policy framework of
GoM.
Quarterly collate and consolidate social audit reports for the district.
Final Report highlighting progress and achievements.
VII. Reporting
The SO will report to CEO, DWSM, and Project Manager. However, SOs hired
by District should also be accountable to GP and VWSC for the activities
which are assigned on them. In pre-decided intervals, GP and VWSC will
assess the performance of SOs in terms of process and output. Written
feedback from GP and VWSC will be given due weightage while assessing the
performance of SO.
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II) under which works of institutional development and
demonstration of higher levels of services will be undertaken. The WSSD is
already implementing programs like NRDWP and SBMG in the state. The GoM
intends to hire on contractual basis, a reputable entity with expertise in
environmental management of different categories of the Program. The
objective of appointing an Environmental Management Specialist is to provide
support for establishing an independent and efficient environmental
monitoring and evaluation system for RWSS sector which will be helpful in
assessing the environmental impact of various categories of the Program. It will
also be helpful in monitoring different indicators pertaining to environmental
aspects pertaining to different categories of the RWSS sector programs. The
Environmental Management Specialist is expected to support the RSPMU in
preparing and implementing EDDP and monitoring the environmental impact of
various projects undertaken.
Scope of Work :-
The Environmental Management Specialist will be part of the Reform Support
and Project Management Unit (RSPMU) and will report to the Project Manager.
The Environmental Management Specialist will be responsible for the overall
coordination of all environment related activities in order to ensure that there
is no violation of statutory provisions, standard protocols and Environmental
Management Rules and Procedure.
The Environmental Management Specialist will support the WSSD, RSPMU and
the sector institutions to manage the implementation of all environment related
activities and will provide guidance and support as and when required.
COMMUNICATION :-
The Environmental Management specialist will report to the Project Manager,
but may communicate directly with the sector institutions implementing the
program categories for environment related works.
For strategically important decisions regarding the duties (assignments)
described in the Terms of Reference, the Environmental Management Specialist
needs to obtain approvals of the Project Manager, RSPMU or appropriate
authorities from time-to-time.
REPORTING :-
Prepare Monthly Progress Reports for all environment related activities;
Prepare Quarterly Reports for the environment parts implementation, to
be used for the preparation of the QRs to the Project Steering
Committee;
Prepare Minutes/Official notes from the meetings of the Environmental
working groups;
Prepare Minutes from the meetings with the environmental consultants,
if any, appointed for program purposes.
MEETINGS :-
The Environmental Management Specialist will :-
Participate in the Program Steering Committee meetings, if requested;
Have regular/periodical meetings with the Environmental Working
Groups;
Have regular meetings with the consultants, suppliers and contractors,
in order to monitor the progress of their work;
PERIOD OF PERFORMANCE:-
The period of assignment is June, 2014 to May, 2017, renewable on an annual
basis.
Reporting:
The Environmental Management Specialist will be based in the RSPMU located
at CIDCO Bhavan, Navi Mumbai and will report directly to the Project
Manager/the Project Director and will be responsible for all environmental
management activities of Jalswarajya II .
Desired Qualifications:
Candidates with a Ph.D. degree or an L.L.B. degree or an M.B.A. degree or a post
graduate Diploma in Environmental Laws/Ecology and Environment / Pollution
Control will be given preference.
Candidate able to deliver results without any supervision and able to work
independently, having exceptional degree of integrity, judgement and tact in
handling the most sensitive, diverse and confidential material, conversant with
environmental monitoring tools and techniques and familiarity with Govt. of
Maharashtra standard procedures and practices will be given preference.
Experience of working in government as a consultant for planning, designing,
pre & post implementation assessment preferably in water supply and
sanitation or water resources sector will be desired.
Remuneration:
Consolidated monthly remuneration of Rs. 50,000/- to Rs. 75,000/-
(negotiable depending on education and qualifications) shall be paid to
the incumbent. TA/DA shall be applicable as per Grade Pay Rs. 5400/-.
In case of government/semi-government employees on deputation,
salary and allowances will be paid as per deputation rules and policy.
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II). The WSSD is already implementing programs like NRDWP and
SBMG in the state. The GoM intends to hire on contractual basis, a reputable
entity with expertise in establishing/implementing social management systems
for the sector including the JS-II Program.The objective of appointing a Social
Management Specialist is to provide support for establishing a participatory,
transparent, independent and efficient social inclusion mechanism focusing on
gender justice as well as a participatory M&E and social audit system. It will be
helpful in monitoring and evaluation of the social management actions for
RWSS sector as well as for monitoring different indicators pertaining social
management under different categories of the RWSS sector programs. Social
Management Specialist is expected to support the RSPMU, the M&E Consultant
and IT Consultant in designing software’s pertaining to social management
/inclusion for web-based M&E system and to suggest appropriate measures for
grounding the system effectively, in coordination with M&E consultant.
Scope of Work:-
Social Management Specialist will be part of the Reform Support and Project
Management Unit (RSPMU) and will report to the Project Manager and will be
responsible for the overall coordination of all social inclusion/management
issues in program implementation in order to ensure that the related Program
objectives are achieved within the time schedule and within the financial plan.
Social Management Specialist will support the WSSD, RSPMU and the sector
institutions to manage and implement all social management activities and will
provide guidance and support as and when required.
Specifically, the incumbent will be responsible for the following duties and
responsibilities.
1. To assist the Project Manager in the review and approval of various
screening report related to social issues in accordance with agreed Social
Management Rules and Procedures for the Program;
2. To coordinate with district level social specialist and Support Organisations
to implementation of Social Management Rules and Procedures (SMRP) ,
grievance redressal procedures and social audit.
Communication:-
The SM specialist will report to the Project Manager, but may communicate
directly with the sector institutions implementing the program categories for
procurement related works.
For strategically important decisions regarding the duties (assignments)
described in the Terms of Reference, the SM Specialist needs to obtain
approvals of the Project Manager, RSPMU or appropriate authorities from time-
to-time.
Reporting:-
Prepare Monthly Progress Reports for all social management related activities;
Prepare Quarterly Reports for the implementation of social management
activities, to be used for the preparation of the QRs to the Project Steering
Committee;
Prepare Minutes/Official notes from the meetings of the SM Working groups;
Prepare Minutes from the meetings with the consultants.
Meetings:-
The SM Specialist will:-
Participate in the Program Steering Committee meetings, if requested;
Have weekly meetings with the SM Working Groups;
Have regular meetings with the consultants and SOs, in order to monitor the
progress of their work;
Organise ad-hoc meetings, when necessary.
Experience
Experience of working in a reputed educational institute or a state level
NGO or private sector in participatory community development
activities for at least seven (7) years, preferably, in water supply and
sanitation sector.
Previous experience of working successfully with marginal/vulnerable
sub-groups, expertise in participatory social assessment using various
tools and social marketing will be preferred.
Experience of working with multilateral financing agencies/external aid
agencies will be preferred.
Period of Performance:
The period of assignment will be from June, 2014 to May, 2017 renewable every
year. The selected candidate will be based in Mumbai.
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II). The WSSD is already implementing programs like NRDWP and
SBMG in the state. The GoM intends to hire on contractual basis, a reputable
entity with expertise in establishing procurement system for the sector
including the JS-II Program. The objective of appointing a Procurement
Specialist is to provide support for establishing an independent and efficient
procurement system for the sector as well as monitoring and evaluation of the
procurement actions for RWSS sector. It will also be helpful in monitoring
different indicators pertaining procurement actions and various achievements
under different categories of the RWSS sector programs. The Procurement
Specialist is expected to support the RSPMU and the M&E Consultant in
designing the software’s pertaining to the procurement system for the web-
based M&E system and to suggest appropriate measures for grounding the
system effectively, in coordination with M&E consultant.
Scope ofWork:-
The Procurement Specialist will be part of the Reform Support and Project
Management Unit (RSPMU) and will report to the Project Manager. The
Procurement Specialist will be responsible for the overall coordination of all
procurement related program activities in order to ensure that the related
Program objectives are achieved within the time schedule and within the
financial plan.
The procurement specialist will support the WSSD, RSPMU and the sector
institutions to manage the implementation of all procurement related activities
and will provide guidance and support as and when required.
General Responsibilities:-
1. To prepare year wise procurement plan for the program ensuring optimum
competition, economy, efficiency, priority of items etc., to get it approved
from the appropriate authority, implement it and monitor/update the same
regularly.
2. To provide procurement support during program preparation;
Reporting:-
Prepare Monthly Progress Reports for all procurement related activities;
Prepare Quarterly Reports for the procurement parts implementation, to
be used for the preparation of the QRs to the Project Steering
Committee;
Prepare Minutes/Official notes from the meetings of the Procurement
Working groups;
Prepare Minutes from the meetings with supplier’s and consultants.
Meetings:-
The Procurement Specialist will:-
Participate in the Program Steering Committee meetings, if requested;
Have weekly meetings with the IT Working Groups;
Have regular meetings with the consultants, suppliers and contractors,
in order to monitor the progress of their work;
Organise ad-hoc meetings, when necessary.
Period of Performance:-
The period of assignment is from June, 2014 to May, 2017, renewable on an
annual basis.
Qualifications:
1. Should have a post graduate degree like an M.B.A. (Fin.) or M.B.A.
(Supply Chain Mgmt.) M.M.M. or a B.Tech. /B.E. or M.Tech. /M.E. degree
from a recognised university or a Chartered Accountant.
2. At least Seven (7) years of direct relevant work experience as
Procurement Specialist or alternatively, having had responsibilities with
a substantial content of his/her position in the procurement area;
3. Good knowledge of all concepts and principles of and approaches to
procurement, and of public procurement systems followed by the state
Remuneration:-
Consolidated monthly remuneration of Rs. 50,000/- to Rs. 75,000/-
(negotiable depending on education and qualifications) shall be paid to
the incumbent. TA/DA shall be applicable as per Grade Pay Rs. 5400/-.
In case of government/semi-government employees on deputation,
salary and allowances will be paid as per deputation rules and policy.
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II) and intends to apply part of the proceeds for establishing and
demonstrating higher levels of service delivery in the WATSAN sector under the
Program.The WSSD is already implementing programs like NRDWP and SBMG
in the state. The GoM intends to hire on contractual basis, a reputable entity
with expertise in establishing financial management system for the sector
including the Program.The objective of appointing a Finance Specialist is to
provide support for establishing web-based, an independent, efficient and user-
friendly fiduciary system for RWSS sector. The system will also be helpful in the
periodical verification of achievements of the DLIs under the program for
disbursement purposes. It will also be helpful in monitoring different indicators
pertaining to fiduciary systems. The Finance Specialist is expected to support
the RSPMU in designing web-based accounting and auditing systems,
supporting development of software’s for the accounting system in
coordination with the IT Specialist and M&E Specialist and suggest appropriate
measures for improving correct reporting system about actual expenditure
incurred at all levels.
SCOPE OF WORK:-
The Finance Specialist will be part of the Reform Support and Project
Management Unit (RSPMU) and will report to the Project Manager. The Finance
Specialist will be responsible for the overall coordination of all accounts and
audit related program activities in order to ensure that the related program
objectives are achieved within the time schedule and within the financial plan.
The Finance Specialist will support the WSSD, RSPMU and the sector
institutions to manage the implementation of all web-based accounts related
activities and will provide guidance and support to the program implementing
agencies and stakeholders at all levels as and when required.
COMMUNICATION
The Finance Specialist will report to the Project Manager, but may communicate
directly with the sector institutions implementing the program categories for
finance related works.
For strategically important decisions regarding the duties (assignments)
described in the Terms of Reference, the Finance Specialist needs to obtain
approvals of the Project Manager, RSPMU or appropriate authorities from time-
to-time.
REPORTING:-
Prepare Monthly Progress Reports for all finance related activities;
Prepare Quarterly Reports for the finance parts implementation, to be
used for the preparation of the QRs to the Project Steering Committee;
Prepare Minutes/Official notes from the meetings of the finance Working
groups;
Prepare Minutes from the meetings with the different supplier’s and
consultants.
PERIOD OF PERFORMANCE:-
The period of assignment is June, 2014 to May, 2017, renewable on an annual
basis.
ESSENTIAL QUALIFICATIONS:
Candidates must hold M.Com. or M.B.A.(Fin.) or M.F.M. degree or a post
graduate degree in Public Finance or Rural Management or an equivalent
qualification from a recognised university or should be a professional like C.F.A.
or Chartered Accountant or Cost Accountant. The FMS should have thorough
knowledge of government budgeting, accounting and auditing system,
commercial accounting and IT Systems. The FMS is expected to show
demonstrable skills in project management and in working effectively within
multidisciplinary teams. The FMS should have excellent communication skills in
Marathi and English languages.
DESIRED QUALIFICATIONS:
Candidates with post graduate degree/diploma in water, sanitation and hygiene
or Agri. Business Management or Business Administration or degree in
civil/environmental engineering will be given preference.
Experience
At least Seven 7 (seven) years of direct relevant work experience as Finance
Specialist or alternatively, having handled responsibilities with a substantial
content in the financial management sector;
Candidates with good knowledge of all concepts and principles of and
approaches to finance and of public finance systems followed by the state
Government, Government of India and Multilateral Financing Institutes like
World Bank, ADB etc. and having strong communication skills in presenting,
discussing and resolving difficult issues, having exceptional degree of integrity,
Period of Performance:
The period of the assignment will be from June, 2014 – May, 2017, renewable
every year.
Objective:
The objective of appointing a Capacity Building Specialist is to design
appropriate capacity building plans for the JS-II program and coordinate its
implementation in a time bound and effective manner. The CBS is expected to
support the RSPMU for monitoring different indicators pertaining to capacity
building JS-II.
Scope of Work:-
Capacity Building Specialist will be part of the Reform Support and Project
Management Unit (RSPMU) and will report to the Project Manager and will be
responsible for the overall coordination of design and implementation of all
capacity building activities under JS-II Program in a time bound and effective
manner and also within the approved financial plan.
Capacity Building Specialist will support the WSSO, RSPMU and the sector
institutions to manage and implement all capacity building activities and will
provide guidance and support to all stakeholders as and when required.
Communication:-
The CB specialist will report to the Project Manager. For strategically important
decisions regarding the duties (assignments) described in the Terms of
Reporting:-
Prepare Monthly and Quarterly Progress Reports for all capacity
building activities;
Prepare Minutes/Official notes of the meetings of the CB Working
groups;
Prepare Minutes from the meetings with the consultants.
Meetings:-
The CB Specialist will:-
Participate in the Program Committee meetings,
Have weekly meetings with the CB Working Groups;
Have regular meetings with the HR Consultants and SOs, in order to
monitor the progress of their work;
Organise ad-hoc meetings, when necessary.
Period of Performance:-
The period of assignment will be from June, 2014 to May, 2017, renewable on
an annual basis.
Experience
Experience of working in a reputed educational/training institute
/organisation in private sector or a state level NGO in human resource
development/ capacity building activities for at least ten (10) years,
preferably, in water supply and sanitation sector.
Previous experience of working successfully with government
organisations /multilateral financing agencies/external aid agencies and
UN bodies will be preferred.
Period of Assignment:
The period of assignment will be from June, 2014 to May, 2017 renewable every
year.
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-1) under which works of institutional development and
demonstration of higher levels of services will be undertaken. The WSSD is
already implementing programs like NRDWP and SBMG in the state. The GoM
intends to hire on deputation or on contractual basis, a reputable entity with
expertise in financial management under the program. The objective of
appointing a Finance Controller is to provide support for establishing an
independent and efficient financial monitoring and evaluation system for
RWSS sector which will be helpful in assessing the impact of financial inputs in
various components of the program. It will also be helpful in monitoring
different Disbursement Linked Indicators (DLIs) pertaining to different
components of the RWSS sector programs. The Finance Controller is expected
to support the RSPMU in designing and implementing fiduciary and
procurement systems and monitoring the accounting as well as audit of
spendings under the Jalswarajya-l1 program.
Scope of Work:-
The Finance Controller will be part of the Reform Suport and Project
Management Unit (RSPMU) and will report to the Project Manager. The Finance
Controller will be responsible for the overall coordination of all fiduciary and
procurement activities in order to ensure that there is no violation of statutory
provisions, standard guidelines and manuals, policies and advisories on
financial matters.
The Finance Controller will support the WSSD, RSPMU and the sector
institutions to manage the implementation of guidelines regarding financial and
procurement activities, web-based accounting system and double entry
accounting system at all levels in the MJP). The Finance Controller will provide
guidance and support to stakeholders at all levels as and when required.
COMMUNICATION:-
The Finance Controller will report to the Project Manager. For strategically
important decisions regarding the duties (assignments) described in the Terms
of Reference, the Finance Controller needs to obtain approvals of the Project
Manager, RSPMU or appropriate authorities from time-to-time.
MEETINGS :-
The Finance Specialist will:-
Participate in the Program Steering Committee meetings, if requested;
Have weekly meetings with the Finance Working Groups;
Have regular meetings with the consultants, suppliers and contractors, in order
to monitor the progress of their work;
Organise ad-hocclings, when necessary.
PERIOD OF PERFORMANCE:-
The period of assignment is June, 2014 to May, 2017, renewable on an annual
basis.
Experience
At least Seven 7 (seven) years of direct relevant work experience as Chief
Accounts and Finance Officer or Comptroller or Finance Controller or
alternatively, having handled responsibilities with a substantial content in the
financial management sector;
Candidates with good knowledge of all concepts and principles of and
approaches to finance and of public finance systems followed by the state
Government, Govt of India and Multilateral Financing Institutes like World
Bank, ADO etc. and having strong communication skills in presenting,
discussing and resolving difficult issues, having exceptional degree of integrity,
and tact in handling sensitive, diverse and confidential material, with
knowledge and experience in e-finance/procurement will be an added
advantage.
Period of Performance:
The period of the assignment will be from June 2014, to May, 2017, renewable
every year.
The Government of Maharashtra (GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II). The WSSD is already implementing programs like NRDWP and
SBMG in the state. The GoM intends to hire on contractual basis, a reputable
entity with expertise in establishing procurement system for the sector
including the JS-II Program. The objective of appointing a Procurement
Specialist is to provide support for establishing an independent and efficient
procurement system for the sector as well as monitoring and evaluation of the
procurement actions for RWSS sector. It will also be helpful in monitoring
different indicators pertaining procurement actions and various achievements
under different categories of the RWSS sector programs. The Management
Information System Specialist is expected to support the RSPMU and the M&E
Consultant in designing the software pertaining to the management information
system for the web-based M&E system. The Management Information System
Specialist is also expected to suggest measures for grounding the system
effectively, in coordination with M&E consultant.
Scope of Work
The Management Information System Specialist will be part of the Reform
Support and Project Management Unit (RSPMU) and will report to the Project
Manager. The MIS Specialist will be responsible for the overall coordination of
all MIS related program activities in order to ensure that the related Program
objectives are achieved within the time schedule and within the financial plan.
The MIS Specialist will support the WSSD, RSPMU and the sector institutions to
manage the implementation of all inforamtion related activities and will
provide guidance and support to the program implementing agencies and
stakeholders at all levels as and when required.
COMMUNICATION
The MIS Specialist will report to the Project Manager. For strategically
important decisions regarding the duties (assignments) described in the Terms
of Reference, the MIS Specialist needs to obtain approvals of the Project
Manager, RSPMU or appropriate authorities from time-to-time.
REPORTING:-
Prepare Monthly/ Quarterly Progress Reports for all social management
related activities;
Prepare Minutes/Official notes from the meetings of the MIS Working
groups;
Prepare Minutes from the meetings with the consultants.
MEETINGS:-
The MIS Specialist will:-
Participate in the Program Committee meetings, if requested;
Have weekly meetings with the MIS Working Groups;
Have regular meetings with the consultants in order to monitor the progress
of their work;
Organise ad-hoc meetings, when necessary.
DESIRED QUALIFICATIONS:
Candidates with degree/like PhD or an MBA or LLB or a post graduate diploma
in Data Base Management/Business Management/Public Finance/Public Health
will be given preference.
Experience
Experience of working in government organization or multilateral
institutions or reputed educational instituties or private sector
organisations in handling MIS or Data Management activities for at least
Seven 7 (seven) years preferably, related to water supply and sanitation
sector or any government Program.
Experience of working with multilateral financing agencies/external aid
agencies in other capacities will be preferred. .
The Government of Maharashtra {GoM) has received funding from the World
Bank to support the Maharashtra Rural Water Supply and Sanitation Program
(Jalswarajya-II) under which works of institutional development and
demonstration of higher levels of services will be undertaken. The WSSD is
already implementing programs like NRDWP and SBMG in the state. The GoM
intends to hire on contractual basis, a reputable entity with expertise in solid &
liquid waste and water quality management in rural areas. The objective of
appointing an Engineering Specialist! Solid & Liquid Waste and Water Quality
Management) is to provide support to the Gram Panchayats for handling solid
and liquid waste generated in the villages, suggesting environment friendly and
cost effective treatment/disposal methods, for regular water quality
management of drinking water sources in the GP, establishing an independent
and efficient monitoring and evaluation system for the village WSS system
which will be helpful in assessing the environmental impact of various
categories of the program. The Engineering Specialist Solid & Liquid Waste and
Water Quality Management is expected to support the RSPMU in suggesting
various low cost technological options, preparing DPRs and implementation
guidelines and implementing the same and monitoring the impact of various
SLW and WQ activities undertaken.
Scope of Work:-
The Engineering Specialist Solid & Liquid Waste and Water Quality
Management) will be part of the Reform Support and Project Management Unit
(RSPMU) and will report to the Project Manager. The Engineering Specialist!
Solid & Liquid Waste and Water Quality Management) will be responsible for
the overall guidance and coordination of all SLWM and WQ related activities in
the GPs. The Specialist will ensure that there is no violation of statutory
provisions, standard protocols and environmental management plan.
The Engineering Specialist (Solid & Liquid Waste and Water Quality
Management) will support the WSSD, RSPMU and the sector institutions to
manage the implementation of all SLWM& WQMS related activities and will
provide guidance and support as and when required.