Download as pdf
Download as pdf
You are on page 1of 2
200 A 4 200 L ry Lf ges me 150-—1 600-1150 $00 Meet iterate pnt e2—011/45004 dienes exo a gerras 22-011 /43008 WTHOUT GUY SEE Owe. NO. 182-011/45004 ‘wi GUY SEE DMG. NO. 182-011/45008 inaimenerttere! USE_FORSTRAKT OR ANGLE LINE wn pen 22 22 m CONCRETE POLE Idiurmasins SA1=018/46012| gre sooo \tenastvtufl 1A, 2547] em 1 punnffl glued erties ihn 12 h1/ maamtly 2 Vititumamuintethtrernernrnsn Sometime 00-100 34 3 gietmurnstedenernanluwemenens muy went sat—o15/43012 (rere 6867) 4 fee X"= 450 ua urinate Wththmorendflatimam savthtitey sex xT= 0am 1 THIS FOUNDATION 1S USED IN CASE ALLOWABLE SOW. BEARING CAPACITY OF 12 TON/m? OR MORE 2. CASE OF HAVING PAVEMENT OR GROUND SURFACE. LEVEL |S BETWEEN 0.00-1.00 m. LOWER THAN ROAD SURFACE LEVEL 3 SEE RECOMMENDATION FOR POLE FOUNDATION INSTALLATION IN HIGHWAY AREA, DWG. NO. ‘SA1~015/43012 (ASSEMBLY NO. 5687) THE "x" 1S 480 mm HEIGHT FOR FOUNDATION CONSTRUCTION IN HIGHWAY AREA WHICH HAVE. NO PAVEMENT, OTHER AREA THE "x" IS ZERO