Ce Elective: Description Unit Material Cost Unit Planning Qty
Ce Elective: Description Unit Material Cost Unit Planning Qty
Ce Elective: Description Unit Material Cost Unit Planning Qty
1.2 Bidding
Equipment Requirement :
Payloader/Backhoe
Chainsaw
Dumptruck
Manpower Requirement :
1-Project Engineer
1-Foreman
4-Laborer
2- Operator
Manpower Requirement
1-Project Engineer
1-Foreman
4-Laborer
2 - Operator
Equipment Requirement
1 - Baby Roller/Plate Compactor
1 - Water Truck
Manpower Requirement
1 - Project Engineer
1- Foreman
7 - Laborer
Equipment Requirement
1 - Backhoe
1 - Vibratory Roller
1 - Water Truck
Manpower Requirement
1 - Project Engineer
1 - Foreman
4 - Laborer
Manpower Requirement
1 - Project Engineer
1 - Foreman
5 - Carpenter
5 - Laborer
TOTAL COST OF FORMWORKS & SCAFFOLDS
Equipment Requirement
2 - Concrete Vibrator
1 - Bar Cutter
1 - Bar Bender
Manpower Requirements
1 - Project Engineer
1 - Forman
6 - Steelman
6 - Mason
18 - Laborer
Equipment Requirement
2 -Concrete Vibrator
1 - Bar Cutter
1 - Bar Bender
Manpower Requirements
1 - Project Engineer
1 - Foreman
6 - Steelman
6 - Mason
18 - Laborer
Equipment Requirement
2 - Concrete Vibrator
1 - Bar Cutter
1 - Bar Bender
Manpower Requirements
1 - Project Engineer
1 - Foreman
6 - Steelman
8 - Mason
12 - Laborer
Equipment Requirement
2 - ConcreteVibrator
1 - Bar Cutter
1 - Bar Bender
Manpower Requirements
1 - Project Engineer
1 - Foreman
6 - Steelman
8 - Mason
12 - Laborer
Equipment Requirement
2 - Concrete Vibrator
1 - Bar Cutter
1 - Bar Bender
Manpower Requirements
1 - Project Engineer
1 - Foreman
6 - Steelman
8 - Mason
12 - Laborer
Equipment Requirement
2 - Concrete Vibrator
1 - Bar Cutter
1 - Bar Bender
Manpower Requirements
1 - Project Engineer
1 - Foreman
6 - Steelman
8 - Mason
12 - Laborer
Manpower Requirements
1 - Project Engineer
1 - Foreman
3 - Steelman
3 - Mason
8 - Laborer
Equipment Requirement
1 - Concrete Vibrator
1 - Bar Cutter
Manpower Requirements
1 - Project Engineer
1 - Foreman
2 - Steelman
2 - Mason
4 - Laborer
1-1/2 months
1 month
1170 19500
60000 8400
3 weeks
5000 1 Day
0.07703125
1 day
600 1200
300 2400
300 600
TOTAL ITEM COST
20670
28560
47200
21200
68400
5000
Materials units price (pesos)
fill materials cu.m 250
4" x 8" x 12mm Plywodd (ordinary) pc 598
4" x 8" x 12mm Plywodd (marine) pc 705
2" x 2" x 12mm Coco Lumber bd. Ft. 48
2" x 3" x 12mm Coco Lumber bd. Ft. 72
2" x 4" x 12mm Coco Lumber bd. Ft. 96
2d nails kl 45
8d nails kl 43
20d nails kl 41
16mm dia. G-60 RSB 6m length 325
10mm dia. G-60 RSB 6m length 125
Portland Cement, Holcim 40kg/bag 232
Sand cu.m 600
gravel cu.m 800
15 x 20 x 40 cm CHB pc 15
#16 G.I. Tie wire kl 54
40 x 40 cm Marble Green Floor Tile pc 45
30 x 30 cm Glazed Tile pc 29
20 x 20 cm Glazed Tile pc 9
White Cement kg 16
Tile Adhesive, Heavy Duty kl 250
Hang Cabinet with Case Door set 1983
Counter Cabinet with Case Door set 6497
0.6 x 0.6m awning window with aluminum frame set 1073
0.6 x 1.2m casement window with aluminum frame set 2166
PVC Door with Louver set 1300
D-3 Flush Door, Lauan set 3680
D-2 Panel Door, Mahogany set 4290
D-1 Full Glass Sliding Door (1.6 x 2.1m) set 20195
Door Lock, Alpha set 340
Door Knob, Aplha pc 126
Door Hinge 3" x 3", Stanley pair 115
G.I. Corr. Roofing Sheets Ga. #24 5', Union sheet 285
G.I. Corr. Roofing Sheets Ga. #24 6', Union sheet 342
G.I. Corr. Roofing Sheets Ga. #24 7', Union sheet 399
G.I. Corr. Roofing Sheets Ga. #24 8', Union sheet 456
G.I. Corr. Roofing Sheets Ga. #24 9', Union sheet 513
G.I. Corr. Roofing Sheets Ga. #24 12', Union sheet 684
G.I. Corr. Roofing Sheets Ga. #24, Union sheet 600
Fiber Glass Roof set 153556
Rivets pcs 285
2" x 4" x 20' C-Purlins length 416
10mm dia. Sag Rod 6.0m length 176
35mm x 35mm x 6m Angle bar length 487
Flat Wall Enamel, Botsen gal 540.75
Paint Thinner, Flying Tiger botle 38
Red Epoxy Primer, Davies gal 666
Concrete Neutralizer, Boysen gal 425
Semi-Gloss Latex paint, Boysen gal 568
40 GI Pipe, 1/2" dia. length 309
gate valve, Brass set 220
check valve pc 229.75
Teflon roll 15
Tee, 1/2" pc 8
Elbow 90 degrees bend, 1/2" pc 7.75
Nipple, 1/2" x 4" pc 20.5
Coupling, 1/2" pc 11.5
Kitchen Sink, Stainless Steel set 685
Lavatory, High Class Design set 2200
Floor drains pc 50
Water Closet set 2800
Faucet, High Class Design set 635
Shower Head, Hydro Aqua Fresh set 875
Soap Holder set 250
Towel Holder set 635
Toilet Paper Holder set 259
Mirror for Lavatory, Cozy design pc 2800
Series 1000 PVC Pipe, 2" dia. Emerald pc 454
Series 1000 PVC Pipe, 4" dia. Emerald pc 219
Series 1000 PVC Tee, 4" x 4" dia. Neltex pc 135
Series 1000 PVC Tee, 4" x 2" dia. Emerald pc 106
Series 1000 PVC Wye, 4" x 2" dia. Neltex pc 111
Series 1000 PVC Wye, 4" x 4" dia. Emerald pc 122.3
Series 1000 PVC Elbow, 90 degrees bend 2" dia. Emerald pc 29
Series 1000 PVC Elbow, 90 degrees bend 4" dia. Emerald pc 76
Series 1000 PVC Elbow, 45 degrees bend 4" dia. Emerald pc 58.35
Series 1000 PVC Pipe coupling , 4" dia. Emerald pc 50.8
Series 1000 P-Trap, 4" dia. Emerald pc 190.5
Clean-out Adap. And plug 4' dia pc 50
PVC Solvent 100cc/can 32
Circuit Breaker 30amp, Omni pc 289.75
Circuit Breaker 20amp, Omni pc 289.76
panel Board, 8 branches pc 779
Decorative Lights, high Class Design Apollo set 3800
pin Light 7W, Apollo pc 159.95
Flourescent Light, 20w Cool white, ultra slim, Omni set 299.75
Convenience outle, double gang, Royu pc 133
AC outlet, single gang, Royu pc 122
Single gang swtich, akari pc 69.75
double gang switch, akari pc 109.75
triple gang switch, akari pc 167.75
TW Cu. Wire 3.5 sq. mm roll 35.8
TW Cu. Wire 5.5 sq. mm 1m 39
Service entrance pc 178
———————————————————————————-
———————————————————————————-
——————————————————————————
———————————————————————————–
———————————————–
steel flat bar size 1/4×1 (standard size) – 305.00
steel flat bar size 1/4 x 1-1/4 – 195.00
steel flat bar size 1/4 x 1-1/2 – 250.00
steel flat bar size 1/4 x 1-1/2 standard size – 450.00
steel flat bar size 1/4 x 2 – 360.00
———————————————————————————-