Professional Documents
Culture Documents
07 SEPT 20 (Rev 2)
07 SEPT 20 (Rev 2)
C
PARAPET WALL
LEVEL 1
C S10
S10 Roof framing details refer to
1100
COMMON
BEDROOM 3 WASHROOM ENSUITE MASTER BEDROOM 1 10mm plaster with selected paint
finish.
FIRST
FLOOR LEVEL
selected tile finish.
2700
14°
1100
structural drawings for details.
FIRST
FLOOR LEVEL
selected tile finish.
2700