TRANSVERSAL AND LONGITUDINAL PROSPECTS OF SUPPORT STRUCTURES REFERENCE DOCUMENTS

General Plot Plan

Preliminary Calculation Report for Foundations

A A

3,8 m

min 0,4 m

4,0 m

~1 m

p.c. +0,00 0,6 m

B B

NORD
OVEST EST

CROSS SECTION OF SUPPORT STRUCTURES

SATELLITE SETTINGS (not scale) SUD

· THE SELECTED TRACKER TECNOLOGY IS SOLTEC SF7.


~±45° · ALL STRUCTURAL STEEL SHALL BE HOT DIP GALVANIZED
· ALL BOLTS, WASHERS & NUTS SHALL BE STAINLESS STEEL
4,0 m
· SOLUTION SHALL BE ADOPTED AS FUNCTION OF GEOTECHNICAL
C C
REPORT AND GRADING STATE
· DETAIL DESIGN SHALL BE DEFINED BY CONTRACTOR IN NEXT
3,8 m
PROJECT PHASE

MATERIAL DETAILS
CONCRETE WORKS
p.c. +0,00 4,0 m min 0,4 m Concrete
Exposure Resistence Consistency Type of steel Secondary
~1 m 5m Element cover min
class class class bars elements
(mm)
0,6 m
XC4, XA2 e
Foundation C32/40 S4 B450C S235JR 50
XS1
STEEL WORKS
Bolts Protection
D Resistence Resilience D
Element resistance against
HORIZONTAL SECTION OF FOUNDATIONS OF THE SUPPORT STRUCTURES class class
class corrosion

Strutture di
S275 JR 8.8 C4
4,0 m sostegno

CD - FE 01 16/04/2019 Issued for Comment

CD - FE 00 11/04/2019 Issued for Comment


Validity Revision
Status Number Date Description
Revision Index

E
Project name Company Document ID E
7,3 m

4,0 m

Facility and Sub Facility Name

Scale Sheet of Sheets


n.a. 1/2

SIZE: ISOA2 (594 x 420 mm)


Document Title Supersedes N.

F
TYPICAL SOLAR PANEL RACKS AND FOUNDATIONS FOR Superseded by N. F

TRACKERS Plant Area Plant Unit


n.a. n.a.