Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

Industrial Attachment Report

P a g e | 25

CHAPTER – 4
LAYOUT PLAN

TMSS Engineering College

(Affiliated with University of Rajshahi)


Industrial Attachment Report
P a g e | 26

4.1 OVERALL VIEW OF INDUSTRY

Entry

TMSS Engineering College

(Affiliated with University of Rajshahi)


Industrial Attachment Report
P a g e | 27

Specimen

Security office

Administration office + Human Resources Department (HRD) + Marchanding section

Fabrics Store Knitting (Gr.Floor) + garments (2ndFloor+5rd floor)

Fabric dyeing & finishing section

Knitting (Gr. Floor) + +Garment section (1st Floor – 5th floor)

Yarn store + Fabric store

Maintenance building

Generator house, Water Treatment Plant (WPT)

Effluent Treatment Plant (ETP).

4.2 LAYOUT OF KNITTING SECTION

TMSS Engineering College

(Affiliated with University of Rajshahi)


Industrial Attachment Report
P a g e | 28

4.2.1 KNITTING - 1

TMSS Engineering College

(Affiliated with University of Rajshahi)


Industrial Attachment Report
P a g e | 29

4.2.2 KNITTING - 2

TMSS Engineering College

(Affiliated with University of Rajshahi)


Industrial Attachment Report
P a g e | 30

4.3LAYOUT OF DYEING SECTION

4.3.1 DYEING – 1

TMSS Engineering College

(Affiliated with University of Rajshahi)


Industrial Attachment Report
P a g e | 31

4.3.2 DYEING – 2

TMSS Engineering College

(Affiliated with University of Rajshahi)

You might also like