1048-07-QA-76
76 REV. 2
2 24.02.2019
24 SK VV NKP
1 14.01.2019 SK VV NKP
0 30.09.2018 SK VV NKP
1. Scope
e
2. Purpo
ose
3. Referrence Docum
ments
4. Abbre
eviations & Definitions
D
5. Organ
nization and
d Responsib
bilities
6. Work Process
6.1 Acces
ss to site
6.2 Drivin
ng mobile crrane to site
6.3 Crane
e Positioning
g
ading Procedure
6.4 Unloa
6.5 Installlation Proce
edure
7. Lifting
g And Riggin
ng Plan
8. Load Chart
9. nd Pressure
Groun e Chart
10. Route
e Map
11. Plantt, Equipmen
nt, Machines
s & Tools
12. Anne
exures
12.1 Work
W Permit Risk Asse
essment (CT
TRA)
12.2 Load
L Chart
12.3 Lifting
L Plan
12.4 Lifting
L Gearrs Details
12.5 Route
R Map from Gate to
t Shelter No.
N 3
1. Scope of Work:
Work
In accordance with the requirements of the contract, the scope of this Method Statement provides
the control sequence of construction and methodology that will be used for the Installation of Blast
Resistant Shelter at KNPC MINA
MINA AL AHMADI (MAA) Refinery. It further provides the means for
inspecting and testing the installations once the activities are completed.
The various sections define the activities, which must be applied to control the areas of work within
the applicable contract
contract documents, specifications and work instructions.
The purpose of this method statement is to outline the general requirements which should be taken
into consideration for this activity.
2. Purpose:
Purpose
3. Reference Documents:
Documents
Traffic
raffic Safety Guidelines, HSE-TSSA-04
HSE 04-SP01,
SP01, Rev 4.
Project Drawings
Lifting Plan
MS - Method Statement
RA - Risk Assessment
PM - Projects Manager
SE - Site Engineer
SO - Safety Officer
s Manager:
Projects
Responsible for controlling the project's entire activities & for the overall coordination with the
Consultant.
Ensure that adequate facilities, resources and equipment are provided to the work to avoid injury,
health impairment or damage & to ensure providing quality works within the planned timescale.
The Project Manager will be responsible for allocating the right resources for the planning and
execution of all the activities.
Site Engineer:
Engineer
Safety Officer:
Officer
Responsible
esponsible for the implementation of safety requirement of the site and ensure all works are
executed in accordance with the Project HSE plan and company safety procedures.
All the employees have undergone safety induction and a job speci
specific
fic training.
Strict compliance to KNPC SWP on HSE Guidelines for the contractors.
Continuous safety supervision will be maintained at site.
Ensure proper and clear access to work at Site.
Ensure proper barricading of Work/ Equipment.
Ensure that all the workers
workers have a safe place of work, advise safe system of work and provide
adequate instructions, training and supervision to enable employees to work in safety.
Ensure that the HSE methods of working are in operation & that all regulations are being observe
observed.
Report, determine & analyze the cause of any accident or dangerous occurrence and recommend
measures for preventing recurrence.
6. Work Process:
Supervision
All the persons involved in the job will be explained about the safety aspects and requirements on
the job.
Proper work plan will be made for the job.
All work supervision will be managed by our competent Engineer/supervisor who will be
responsible for entire operation
Cordon of the area and barricade.
Remove all the non-essential
non persons from the area during operation
operation.
Crane
rane and equipment with third party certification shall be used for operation.
Site to be inspected prior to the commencement of the job.
Necessary
ecessary work permits to be obtained prior to commencement of the job.
All the underground services have to be check with KNPC U/G drawing and take extra care.
The crane shall have valid third party certificate and safety certificate after inspection by KNPC
Safety.
The rigger and the operator shall be trained and certified by the approved third party agency.
All lifting tools and tackles used shall be inspected and certified by third party agency.
Obtain necessary work permits prior to commencement of the job.
Make prior visit to confirm the back filling/compaction of the area as discussed.
The area near to the lift will be inspected for access / positioning of the crane and made sure it is
as per the requirement before getting the equipment on site.
Mark the approximate location of the crane as per the working radi
radius.
Crane will be driven inside area and positioned exactly over the marked area as stated earlier and
mark the out rigger positions.
Rig up the crane on steel pads.
Slowly reverse the trailers carrying counter weights near the cran
cranee and install them on th
the crane.
Change the hook block to required part lines for the lift.
Now the crane is ready for the safety inspection / final lift
lift.
Access route to drive and reach the crane on working area to be verified.
Space available at planned operating position to be verified.
Approved rigging plan and rigging check list shall be available at site based on type of lifts (Critical/
Non Critical). Refer page # 23 in the same document for rigging plan of operating shelter no. 3.
Lifting activities shall be stopped in case of adverse climatic condition or insufficient illumination
and visibility.
The route of the crane from main gate to worksite shall be sur
surveyed
veyed prior to shifting. In case any
permanent facilities or height barriers are removed, it shall be reinstated at the end of the day
work. Refer page # 32 in the same document for route map fr
from
om gate to operating shelter no 3.
Pilot vehicle shall be available during
during shifting of the modules and to be done in non
non-peak
peak traffic
hours. This will be provided by KCCEC.
All lifting activities shall be directly supervised by approved authorized rigging foreman/ supervisor/
engineer.
engineer
All the lifting gears and spreader bar are having valid third party certificate
certificate.
While lifting the load it shall be as per KNPC SWP Lifting Tools and Appliances (Appendix G
G-
categories of lifting operations.
Will strict
trictly comply of all KNPC SWP-
SWP Lifting Tools and Appliances, Mobile equipment safety, Work
Permit system and risk assessment etc,
6.5 Unloading Procedure:
Procedure
Sequence of Installation:
Installation
Install 1-
1 Part 4
Install 2-
2 Part 3
Install 3-
3 Part 2
Install 4- Part 1
Install 5- Air Stack Structure
Install 6-
6 HVAC Unit
Install 7-
7 Ladder
Install 8-
8 GRP Tank
Position the selected crane & truck with load as per the lifting plan.
Mark the exact location of each module in the foundation as per the drawings.
Install four no’s of anchor bolt in the foundation of part
part-4
4 module to arrest the movement.
Change the sling arrangement in the spreader bar as per the clause 6.3 for PART
PART-4
4 module.
Install the PART-4
4 module in the desired location of the foundation by lift & place in the foundation
directly from the truck as per the attached lifting plan.
Fasten the nuts in the base plate of PART-4
PART module.
Remove the heat shrink
nk packing cover by knifing and dispose the waste as per the requirements.
Position
osition the man lift/
lift/ temporary ladder and remove the temporary bracings (2 no’s) fitted for
transportation purpose by de-
de-fastening
fastening the bolts and lower it down by the rope from top
top.
Properly remove the packing/ other waste from the working area and dispose as per the
requirements.
Place the 8mm thick MS Plate in the width side of the foundation of PART
PART-3
3 module. Upper
surface of the plate shall be applied with grease to slide and co
couple
uple the module after removal of
the bracing.
Change the sling arrangement in the spreader bar as per the clause 6.3 for PART
PART-3
3 module.
Install the PART-3
3 module in the foundation by lift & place in the foundation directly from the truck
by maintaining the desired space between PART-3
PART & 4 to position the man lift
lift// temporary ladder to
remove the packing plywood by hammering from inside and to de
de-fasten
fasten the bolts of the bracings
(4 no’s) and lower it down by the rope.
Slide the PART-3
PART 3 module by Crane and couple
coup le it to PART
PART-4
4 module.
Align and fasten the ten sets of bolts at each side (M20 x 60mm) on the connection angle joints
located in front & rear face of the module.
Properly remove the packing/ other waste from the working area and dispose as per the
requirements.
rements.
Place the 8mm thick MS Plate in the width side of the foundation of PART
PART-2 module. Upper
surface of the plate shall be applied with grease to slide and couple the module after removal of
the bracing.
Change the sling arrangement in the spreader bar
ba r as per the clause 6.3 for PART
PART-2
2 module.
Install the PART-2
PART 2 module in the foundation by lift & place in the foundation directly from the truck
by maintaining the desired space between PART-2
PART 2 & 3 to position the man lift
lift// temporary ladder to
remove the heat
heat shrink packing by knifing and to de
de-fasten
fasten the bolts of the bracings ((4
4 no’s) and
lower it down by the rope.
Slide the PART-2
PART module by Crane and couple it to PART
PART-3 module.
Align and fasten the ten sets of bolts at each side (M20 x 60mm) on the connec
connection
tion angle joints
located in front & rear face of the module.
Properly remove the packing/ other waste from the working area and dispose as per the site
requirements.
Re-position
position the crane & truck as per the lifting plan.
Place the 8mm thick MS Plate in the width side of the foundation of PART
PART-1
1 module. Upper
surface of the plate shall be applied with grease to slide and couple the module after removal of
the bracing.
Install the PART-1
PART 1 module in the foundation by lift & place in the foundation directly ffrom
rom the truck
by maintaining the desired space between PART-1
PART 1 & 2 to position the man lift
lift// temporary ladder to
remove the heat shrink packing by knifing and to de
de-fasten
fasten the bolts of the bracings (2 no’s) and
lower it down by the rope.
Slide the PART-2
PART 2 module by Crane and couple it to PART
PART-3
3 module.
Align and fasten the ten sets of bolts at each side (M20 x 60mm) on the connection angle joints
located in front & rear face of the module.
Install the Air Stack Structure in the foundation by lift & place in the foundation from the ground.
Install the HVAC Units in the foundation directly from the truck.
Install the Cat ladder in the PART-4
PART 4 module and position the man lift to fasten the bolts (M12) to
the cleat welded in the module.
Install GRP tank, Chemical filtration unit & Inertia filter by fork lift.
Fix the lifeline brackets (4 no’s) in the lifting lug by bolting and install the lifeline to access in the
roof area to fix the connection angle bolts and rain shade fittings.
Lifting and rigging plan attached on this document only for operating shelter # 3. Will later on submit
the lifting and rigging plan for other shelters separately prior to dispatch from UAE.
8. Load Chart:
Route Map attached on this document only for operating shelter # 3. Will submit later on
n for other
shelters separately.
separately
The route will be surveyed for any obstruction prior to shifting of the modules. Ensure the boom swing
area is free from any obstruction, in case of removal of existing facility
facility, the same will be reinstated by
KCCEC/ Hunter.
The route map for the rest of the modules will be submitted prior to shifting.
All plant and equipment required for lifting operations shall be inspected and approved by plant
inspector (if applicable) prior to use on the project. All certificates for equipment and tools shall be
maintained and a copy will be present at site.
12. Annexures:
1. Critical Task Risk Assessments (CTRA)
2. Load Chart
3. Lifting plan for Shelter No. 3
4. Lifting Gear Details
5. Route Map from Gate to Shelter No. 3
6. Required Work Permits
Permits (Sample)
Critical Task Risk Assessment
Assessments (CTRA)
KUWAIT NATIONAL PETROLEUM COMPANY
COLD HOT ENTRY
MASTER COPY
WORK PERMIT RISK ASSESSMENT APPENDIX‐G
Likelihood
Likelihood
Residual
Severity
Severity
Mitigation (Precautions taken)
Risk
Risk
S. No Hazard
Consider KNPC Standards/ Codes/ Practices.
Welding eye lug must checked by competent person.
1 Structure failure. 3 3 9 Verified NDT report prior to lifting operation. 1 3 3
Close monitoring by the supervisor.
Competent & Experience lifting supervisor.
Select proper lifting gear.
Inaccurate
Assessment & Check Anchor Points.
2 2 3 6 1 3 3
Selection of lifting RA Briefing for all workers.
gear.
Lifting can only be carried out with the recommended lifting
gears and lifting machines.
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 1 of 3
Don’t stand under suspended load.
Ensure crane operator, rigger and signalman has clear
communication.
Use proper lifting signals.
Working under
3 3 3 9 Barricade the area and use tag line. 1 3 3
suspended load.
Ensure proper lifting equipment used.
Put sign board and alert workers on the operation.
Increase safety awareness through safety briefing / training.
Ensure crane operator, rigger and signalman has clear
communication.
Ensure tag line is installed.
Ensure sufficient manpower to handle tag line.
Restricted visibility
4 during load 3 2 6 Don’t stand under suspended load. 2 2 4
positioning.
Ensure the immediate lifting area is cordoned off.
Stop crane movement if load swing is too extensive.
Stop work during foul weather.
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 2 of 3
Use experience‐lifting crew for complicated lift.
Wear Adequate task specific pps like hard hat , safety googles ,
5 Hit by object / load. 3 2 6 2 2 4
safety shoes etc.
Barricade the area of work to prevent entry of un‐authorized
personnel and use proper sign boards.
Specific prevention and protection measures KNPC references:
1. Ensure compliance with all related KNPC safe work practices.
2. Relevant SWP's and guidelines shall be referred for any clarifications.
3. If any other risk is found while executing the job, work shall be stopped a risk assessment shall be again conducted before restaring the job.
4. Keep risk assessment and permits at site. Toolbox talk to be conducted prior to commencement of the job and WPRA hazards & mitigating measures shall be discussed in
the local languages to all craft level contractor employees.
Key: ALARM‐ Serious or major harm will probably occur. ALERT‐ Moderate harm probable, major harm unlikely to occur
CAUTION‐ Minor harm probable, major harm very unlikely to occur, CARE‐ Minor harm possible, major harm very unlikely to occur
Maintenance/ Maintenance/
Operations Safety Engineer‐
Section Head Construction Engr‐ Construction Engr‐ Safety Engineer‐ KNPC KCCEC/ HUNTER
controller Contractor
KNPC Contractor
Signature
Name
EMP #
Note:‐ 1. Master Copy (Original) shall be retained in file for record and future reference
2. Photo copy shall be attached with work permit
3. Ref. no. guidance:‐ Example LOCATIOn ‐ DEPT./DIV. RISK ANALYSIS ‐ YEAR ‐ SERIAL NO.e.g. 1. MAA‐XXXXRA‐05‐1001, 2. PRJ‐XXXXRA‐05‐1001
4. If same Risk Assessment is being used again, it must be reviewed to check relevancy.
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 3 of 3
KUWAIT NATIONAL PETROLEUM COMPANY
COLD HOT ENTRY
MASTER COPY
WORK PERMIT RISK ASSESSMENT APPENDIX‐G
Likelihood
Likelihood
Residual
Severity
Severity
Mitigation (Precautions taken)
Risk
Risk
S. No Hazard
Consider KNPC Standards/ Codes/ Practices.
Wear full body safety harness and 100 % tie off while working at
height.
Working plat form / scaffold should have valid tag & inspected
periodically.
Discussing with site in‐charge for the required working plat form
& necessary modifications.
Falling from height
1 3 3 9 1 3 3
injury/ fatality Use ‘A’ type Aluminum ladder if required with safe manner.
Secure all loose tools and materials in boxes or gunny bags.
Depute trained and experienced operatives only.
All safety harness required 2 numbers of lanyards (above 1.8
mtr).
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 1 of 2
Conduct tool box talk prior to the activity.
Falling from height Scaffolding to be erected and dismantled by a contractor with a
3 3 9 1 3 3
injury/ fatality scaffolding license.
Area should be barricaded properly and warning signage shall
be placed.
Employees to use the correct manual handling techniques at all
times.
Falling tools & lifting
2 2 3 6 1 3 3
gear
Secure all loose tools and materials in boxes or gunny bags.
Specific prevention and protection measures KNPC references:
1. Ensure compliance with all related KNPC safe work practices.
2. Relevant SWP's and guidelines shall be referred for any clarifications.
3. If any other risk is found while executing the job, work shall be stopped a risk assessment shall be again conducted before restaring the job.
4. Keep risk assessment and permits at site. Toolbox talk to be conducted prior to commencement of the job and WPRA hazards & mitigating measures shall be discussed in the local
languages to all craft level contractor employees.
Key: ALARM‐ Serious or major harm will probably occur. ALERT‐ Moderate harm probable, major harm unlikely to occur
CAUTION‐ Minor harm probable, major harm very unlikely to occur, CARE‐ Minor harm possible, major harm very unlikely to occur
Maintenance/ Maintenance/
Operations Safety Engineer‐
Section Head Construction Engr‐ Construction Engr‐ Safety Engineer‐ KNPC KCCEC/ HUNTER
controller Contractor
KNPC Contractor
Signature
Name
EMP #
Note:‐ 1. Master Copy (Original) shall be retained in file for record and future reference
2. Photo copy shall be attached with work permit
3. Ref. no. guidance:‐ Example LOCATIOn ‐ DEPT./DIV. RISK ANALYSIS ‐ YEAR ‐ SERIAL NO.e.g. 1. MAA‐XXXXRA‐05‐1001, 2. PRJ‐XXXXRA‐05‐1001
4. If same Risk Assessment is being used again, it must be reviewed to check relevancy.
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 2 of 2
KUWAIT NATIONAL PETROLEUM COMPANY
COLD HOT ENTRY
MASTER COPY
WORK PERMIT RISK ASSESSMENT APPENDIX‐G
Likelihood
Likelihood
Residual
Severity
Severity
Mitigation (Precautions taken)
Risk
Risk
S. No Hazard
Consider KNPC Standards/ Codes/ Practices.
All MEWP shall be certified by KNPC approved Third Party
Agency.
Equipment shall be in good condition and meet the
requirements of ‘Vehicle and Equipment Safety’.
Breakdown , Fire &
1 2 3 6 1 3 3
burns
Fire Extinguisher of the right type and size, certified by KNPC
Fire Section shall be kept in all equipment.
Spark arrestor shall be fixed to the exhaust of equipment and
vehicles entering hazardous area.
Depute certified, trained & competent operator & banks man.
Collision with
2 2 3 6 1 3 3
structure.
Only Use routes and parking areas designate by KNPC
representative.
Men Falling from Full body safety harness for operator with 100% tie off on
3 2 3 6 1 3 3
height anchoring point on MEWP.
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 1 of 2
Secure any loose items in bags or boxes inside the platform.
Falling tools &
4 2 2 4 1 2 2
material.
Secure all tools by tools lanyard.
Barricade the area and put warning signage.
Moving vehicles and
5 3 2 6 Conduct TBT with employees. 2 2 4
pedestrian.
Close supervision by Supervisor and HSE advisor.
Specific prevention and protection measures KNPC references:
1. Ensure compliance with all related KNPC safe work practices.
2. Relevant SWP's and guidelines shall be referred for any clarifications.
3. If any other risk is found while executing the job, work shall be stopped a risk assessment shall be again conducted before restaring the job.
4. Keep risk assessment and permits at site. Toolbox talk to be conducted prior to commencement of the job and WPRA hazards & mitigating measures shall be discussed in the
local languages to all craft level contractor employees.
Key: ALARM‐ Serious or major harm will probably occur. ALERT‐ Moderate harm probable, major harm unlikely to occur
CAUTION‐ Minor harm probable, major harm very unlikely to occur, CARE‐ Minor harm possible, major harm very unlikely to occur
Maintenance/ Maintenance/
Operations Safety Engineer‐
Section Head Construction Engr‐ Construction Engr‐ Safety Engineer‐ KNPC KCCEC/ HUNTER
controller Contractor
KNPC Contractor
Signature
Name
EMP #
Note:‐ 1. Master Copy (Original) shall be retained in file for record and future reference
2. Photo copy shall be attached with work permit
3. Ref. no. guidance:‐ Example LOCATIOn ‐ DEPT./DIV. RISK ANALYSIS ‐ YEAR ‐ SERIAL NO.e.g. 1. MAA‐XXXXRA‐05‐1001, 2. PRJ‐XXXXRA‐05‐1001
4. If same Risk Assessment is being used again, it must be reviewed to check relevancy.
Document no: HSE‐TSSA‐06‐2029 Rev.‐5
May 2015 SWP Work Permit System Risk Assessment Page 2 of 2
Load Chart
HA AC 250-6
11
Lifting Plan for Shelter No. 3
UNIT - 84
SAFETY BOLLARDS/
BARRIERS
REF. DWGS.
PROJECT TITLE:
SAFETY BOLLARDS/
BARRIERS
EXISTING SHELTER 8
REF. DWGS.
PROJECT TITLE:
OTHER WEIGHTS
(SPREADER BAR/ SLINGS/ 4 TONS
CRANE HOOK ETC)
TOTAL WEIGHT TO BE
35.65 TONS
LIFTED (KGS)
WORKING RADIUS (MTRS) 17.74 MTRS
4B 4A 4B 4B 4A 4B
REF. DWGS.
PROJECT TITLE:
OTHER WEIGHTS
(SPREADER BAR/ SLINGS/ 4 TONS
CRANE HOOK ETC)
TOTAL WEIGHT TO BE
30.55 TONS
LIFTED (KGS)
WORKING RADIUS (MTRS) 14 MTRS
REF. DWGS.
PROJECT TITLE:
OTHER WEIGHTS
(SPREADER BAR/ SLINGS/ 4 TONS
CRANE HOOK ETC)
TOTAL WEIGHT TO BE
30.62 TONS
LIFTED (KGS)
WORKING RADIUS (MTRS) 9.55 MTRS
4B 4A 4B 4B 4A 4B
REF. DWGS.
PROJECT TITLE:
OTHER WEIGHTS
(SPREADER BAR/ SLINGS/ 4 TONS
CRANE HOOK ETC)
TOTAL WEIGHT TO BE
35.65 TONS
LIFTED (KGS)
WORKING RADIUS (MTRS) 8.8 MTRS
4B 4A 4B 4B 4A 4B
REF. DWGS.
PROJECT TITLE:
Using ﺩﺥﻣﺎꢀﺳﺐ
ꢁ
(mention tools/ equipments) ﺍُٔ ﻝ ﺩﺍ/ ﺩﺍٝꢂꢁ ﺍꢀꢃ(( ﻣﺎ
ꢐﺍﺩﺱ ﺇﻥꢏ )(ﺝ Issuer ……….
(C) Issued to
Executor……….
Dept./ Div./ Craft/Contractor َْ ﺍُﻭ/ ﺡꢀﺍُﺍﻝﺉ/ٍٝ ﺍُٔﺑﻮ/ﺧﻚꢀؽ Tele: ﺕﻑ ْﺍ
2. Work is Critical Yes No 2ﺵꢑًﻡ ﺥꢋﻥꢂ ﻡꢒ -
Fire Station informed Yes Not Required ﺏﺀꢄꢅꢆﻱ ﺍꢃꢀٓ ꢇꢈﺭ ْﺇﺙꢉٛ
Issuer & Executor jointly checked work site Yes Not Required ꢉٔ ﻍ ﺍُؼꢊٞ ﺽꢄﺙꢋꢄ٘ٔ ُ ﺍٝﺏّ ﺍُٔ ﻟﻆ ﻩꢊ ꢉٛ
ٓﺏ
Work permit risk assessment attached Yes Not Required
4.(A) Gas
Continuous ﺝﺥꢊﺍꢀٓ
Test Not Required ﺓِٞٓﻁꢀ٤ ؿ monitoring ﺡꢀَٔﺯ 4- )ﺑﻎﺯ (ﺃꢃﻑﺻﺢ ﺍ
See associated Entry ﻧﻚꢀُٔ ٍﺍٞ ﺍُﻓﻞꢖ٣ꢀﺭ ﻅꢀꢘٗ ﺍ
Authorisation
ꢂ ﻩُٞﺍ ٠ٗꢂꢁﺍُؾﻝ ﺍ ﻝ٤ﺯ٣ꢀﺝꢃ ﻝ٤ꢃَ ﺃٍٝﺃ ﻝ٤ꢃَ ﺃ٢ٗﺑﺺ ﺧﻌﻪꢂ َٗﺧﺞ ﺏﻯꢜُﺑﻚؽﺽ ﺍ
ﺥ٣ ٍﺵﺯﺏꢈُ ٖ٤ꢐꢃَﺃ ꢛٝﻝ ﻩ٤ُٜﺍ ٕٞﺙꢀꢌُﺍ ﺫ٣ꢀﺝꢌُﺍ ٟꢀﺃﻑ ﺣﻬﺎꢀﺍُؾ ﺧﺚ
ٞꢅꢀُﺍ GAS TESTER’S
Comb O2 ٣ٖ CO SO2
H2S
Shi LEL % ppm ppm ppm Other Temp RH ﻍ٤ꢊٞﺍُﺯ ꢗ٤ꢝْٞ ﺍُﺯꢊﻩ ـ٣ﺍُﺑﺰ ﻩ ﺫꢊُٞﺍ
ft <10% >19.5 <10 <25 <2 s C % Name & Emp. No. Date Time
Signature
5. Authorization / Renewal (It is safe to proceed 5- ꢂﺯꢒ ꢊꢞ ﺀﺫꢄﻥꢂ ꢟ ﻭًٌﻙꢟ ﻳﺂꢌꢠﻥﻯꢂ ( ﺫٌﺫꢝꢁﻥꢂ / ﺷﺺٌﺡꢁﻥꢂ
with this job) ) ﻡꢋًﻥꢂ
/ ﺥ٣ꢂ ﻩُٞﺍ Time ﺫꢊُٞﺍ Name / Emp. No./ Signature. ﻑꢑꢮﻯꢅﻥꢁ ꢤꢇꢂ / ꢭꢑꢇﻯꢅﻥꢁ
ـ٣ﺍُﻫﺒﺰ
Date / ٖ ٠ُﺇ ﺍُٔ ﻅﻫﻞ ꢋꢄُ٘ٔﺍ ٍٝﺍُٔﺑﻮ ꢉ ﺍُؾﻭꢉꢜꢒٓ
Shift From To Issuer Executor Contractor Field
Operator
Remarks:...……........................................................
...............................................................................………………….ﺩﺏꢘؽꢈٓ
(B) Agreed to above. Site was checked Yes No ًﺏꢈꢋ ﺩ ﺁꢎꢏꢏ ꢐꢑﻭꢆﻑﺻﺢ ﺍꢏ ، ꢒꢓꢌﺭ ﺃꢔﺏ ﺫꢋ ﯨﻞꢌ ﻓﺎﻭﺗﻖꢆ ﺝ ﺍꢍ )ꢊ(
and found safe.
Field Operator signature/ Emp. No............................…………………… ꢗ٤ꢝٞﺍُﺯꢊْ ﻩ/ ꢉ ﺍُؾﻭꢉꢜꢒٓ ﻍ٤ꢊٞﺭ
ﺍُٔ ﻅﻫﻞꢍْ ﺍ ꢗ٤ꢝٞﺍُﺯꢊْ ﻩ ﺥꢄ٤ꢝُٞﺍ ﻍ٤ꢊٞﺍُﺯ ﺫꢊُٞﺍ ـ٣ﺍُﻫﺒﺰ ꢗﺏﺭٛ
Issuer name Emp.No. Designation Signature Time Date Tele.
REV-1a/Sep 2002 DIAL "888" IN ANY EMERGENCY ꢀﻧﺎꢕ ꢊꢞ "888" ꢣﻗﺲꢎﺗﺎꢒ ꢐﻣﺼﺖ ﻫﻊꢂ
ꢤﺱꢂﻯꢑﻥꢂ
APPENDIX - B
(Reverse Of Cold Work Permit Form)
GENERAL CONDITIONS OF PERMIT
18 Close the permit by completing Section-6 of original and field operator copy. Keep in file for 1 month.
19 All tools and equipment shall be secured and personnel protected from falling objects.
20 Do not anchor to or suspend loads on process piping.
21 Do not use scaffolds without valid green scaffold tag.
22 Do not use wooden planks in running units.
23 Any exemption shall be with prior approval of KNPC Safety.
1 When using gas mask (Chemical cartridge) in open area, Escape set or SCBA must be available for emergency.
2 In dangerous (IDLH) atmospheres, use airline mask (BA) with escape cylinder and attendant having BA.
3 Always wear BA when disconnecting flanges or opening man ways in lines/eqpt. containing H2S.
4 Radiographers must wear film badges and dosimeters. Provide radiation survey meter and barricade 0.25
millirems/hr level area with warning signs.
5 Oil pier workers must wear life jacket wherever proper platforms with guardrails are not provided.
ﺹﺵٌﺡꢁﻥﻩꢀﺍﻱꢋﻥꢂ ﻭﺵﻁꢥﻥꢂ
. ﺥꢊꢈ ﺩﺍﻡ ﺍُؼꢖ٣ ٓﻍ ﺍُﺯ ﻫﺒﻆꢉٔﻍ ﺍُؼꢊٞ ٢ ﻙꢖ٣ꢀﻍ ﺍُﺯ ﻅꢕ ٝﺕꢐ٣ -1
. ﺥꢄِﺏٗﺥ ٓﺯﻕ٤ꢔﺥ٤ِٔ ػꢉꢌ ُ َﻭﺯِﺥꢖ٣ﺭ ﻫﺒﻆꢛﺍꢀﻗﺰꢍﺕ ﺍꢐ٣ -2
ﺥ٣ﻫﺐꢍ ꢉٔﻣﺈ ٕﺍُؼꢋꢄ٘ ٓ/ ﺥ ٓ ﻅﻫﻞꢊﺑﻄﺚ٠ِ ٕػِٞꢔﺍُﺏ، ꢠُꢋ ٕﺙُٞٞ ﺍُٔﻕꢡﻗﺶﺏꢁ ﺍꢞ ﺇꢖ٣ﺍُﺯ ﻫﺒﻆ٠ِ ﻍ ػ٤ꢊٞﺙﺏُﺯّٞ ﻭ٣ ꢞ -3
.ٍ ٞؼꢄُٔﺍ
ﻝꢊ ﺍٞٗﺏꢃ ﺇﺍﻡꢖ٣ﺍُﺯ ﻫﺒﻆ٢ ﻙْٜ ﺥﺙꢔػٔﺣﻞ ﺍُﺑﻖꢁﺑﻒٗﺩﺏ ﺍ٢ ﻍﻙ٤ꢊٞ ﺍُﺯꢉﺍُؾﻭ٢ ٍﻙٝػٔﺏ ٍﺍُٔﺑﻮٝ ꢉﺍُ ﻭ٢ِ ꢜꢒٔꢑ ُﻭﻙ ٖ ꢌٔ٣ -4
. ꢉٔ ﺍُؼꢖ٣ﺏ ّﺭ ﻫﺒﻆꢘ٘ﺥﺙ٤ػٞ ﺍُﺯꢎٓﺏꢀٗﺥﺙꢊﺑﻄﺚ٠ِ ﺍ ػِٞؽ ﻅٝ ﺕ٣ﺍ ﺍُﺯﻫﻞٞﺭِﻭ
ﺣﻪꢂﺏꢔٍ ٞؼꢄُٔﺥ ﺍ٣ﻫﺐꢍ ﺡꢚﺙﺑﻂ٠ِ ٕػِٞꢔﺍُﺏ، ꢠُꢋ ٕﺙُٞٞ ﺍُٔﻕꢡﻗﺶﺏꢁ ﺍꢞﺏﻯ ﺇꢜُﻫﺒﺠﺰ ﺽﻙ ﺍ ﻓﺎ٠ِ ﻍ ػ٤ꢊٞﺙﺏُﺯّٞ ﻭ٣ ꢞ -5
. ﺏﻯꢜُ ﻙﺽ ﺍ٠ ِﺝﺏ ػ٣ﺍﺭﻝ ﻩٞ ْﺭِﻭٜٗﻝﺙﺅ٤ꢄٓﺥﺭꢈََُ ْﺍꢊٖ ٓ
.ٚ ﺙꢓَُٞٔٔﺍٟ ٔ ٖﺍُٔﻝꢕ ﯨﺐ ꢜُ ﺽﻙ ﺍꢎﺏٗ ﺫ ٗﺑﺰﺉꢃ ﺇﺍﻡꢞ ﺇꢉٔﺀﺍ ﺍُؼꢂﺅﺙ ꢖ٣ ꢀﺙﺏُﺯ ﻅꢉٔ ﺍُؼꢖ٣ꢀٓ ﻅﻫﻞﺭ ﻅّٞ ﻭ٣ ꢞ -6
. 1-ٌّﺏٗﺩﺏ ﺍُﻭ٤ﺀﺏﺙꢄ٤ﺯꢍﺍٙꢋ ꢄ٘ٓٝ ﺃꢖ٣ꢀٓ ﻅﻫﻞ ﺍُﺯ ﻅ٠ِ ػٝ . ꢉٔ ُِؼꢖꢕﺍ٢ ٝ٤ِ ﻅꢄﺭꢗꢔ ٝﺕ ﺇ ﺑﻂﺀꢐ٣ -7
ﺏٛꢀꢃꢋﺥﺙ٤ﻛﺐ ꢕꢆﻝ ﺍُٔﻃﺰِﺩﺑﺞ ﺍ٣ ﻝﺭٝ، 4٠ُ ﺇ2 َْ ﺥ ٓ ٖﺍُﻭꢊꢈ ﺩﺍﻡ ﺍُؼꢂٞ٘ ﺍُﺝꢉꢃ ﺀﺏꢄ٤ﺯꢍ ﺍꢉٔ ﺍُؼꢖ٣ꢀٓ ﻅﻫﻞﺭ ﻅ٠ِ ﺕ ػꢐ٣ -8
ّٞ ﻭ٣ٝ( ꢚꢀ ﺍُﻁꢚꢈ ﺇؿٝﺡꢀػٔﺏ ٍﺍُﻃﻖꢁ ﺑﺚꢢﺍ ﻩٞ ﺩ ﺍُﻁꢞ ْﺍﺭ ﺑﻆꢌﺭ ﻱꢃꢀٓ ﺯ ْ ﻫﺒﻄﻔﺈ٣ٕ ﺃ٠ ِ ػ، ﺩﺏꢘؽꢈُٔﺭ ﺫﺙ٘ﻝ ﺍ
. )ٓﺥꢈَُﺍꢊَْ ﻫﺒﻄﻒꢣﻱﺙꢃꢀُٔﺍ
. ﺏٗﺥ٤ﺍُ ﻅ٠ ُٗﺥ ﺇٞٓ ﻩﺡ ٓﺅٞ ْﺍُٔؼﻝﺍ ﺩﺙ ﻅ٤َِ ػ ٖﺭꢞٞꢤَٓ ﺏ ﺩ٤ِٔ ٓ ٖﺍُؼꢉٔ ﺍُؼꢓ١ꢀ ٕٓ ﻅﻫﻞﺭ ﻅٞꢌ٣ -9
. ꢉٔﺀﻟﺚ ﺍُؼꢉﺝꢊ ꢖ٣ꢀ ﺍُﺯ ﻅ٠ِﻍ ػꢊٞ٣ ٝﻍꢊُٞٔﻟﻮ ﺍꢄﺯ٣ٕ ﺃꢉ ﺍُؾﻭꢉꢜꢒٓ٠ِ ػ- 10
. ꢉٔﺯꢌٓꢀ٤ ؿꢉٔ ػꢖ٣ꢀﺭ ﻅ٠ِ ػٝ ﺃꢉٔ ﺍُؼꢖ٣ꢀﺭ ﻅ٠ِ ػٚ ُٞ ؽ ﻅꢉﺝꢊ ꢉٔﺡ ﺍُؼꢀػﻝ ّٓﺷﺒﺞꢋ٤ꢄ ٘ﺍُﺋﺒﻮ ْﺙﺏُﺯ٠ِ ػ - 11
. ﻩﺡٞﺯَ ْﺙﺏُﻕﻁ٣ ꢉٔػ١ ﺃꢋ٤ꢄ٘ﺡﺭꢀﺍ ٍﻙﺯٞꢅ ﺍꢂٞﻉٕٞٓ ٞꢌ٣ٕ ﺕ ﺃꢐ٣ٝ ﺕꢍ ٓ٘ﺏꢥﺍꢀ ﺇﺵꢀ٤ﻙٞﺭꢋ٤ꢄ ٘ﺍُﺋﺒﻮ ْﺙﺏُﺯ٠ِ ػ- 12
ꢅٝ ꢀꢒُﻍ ﺍ٤ٔꢐﻳﺰﺍ ّﺙꢞُﺍٝ , ꢉٔﺍُؼ٢ ﺍُﺀﻟﺞﻙꢉﺝꢊ ﺏٜﺙ٠ꢔ ُٞٔﺥ ﺍ٣ﺏꢊُٞ َٓﺯِﻱٓﺩﺏ ﺍꢉꢃꢀ٤ ﻙٞﻝ ٓ ٖﺭꢃﺅﺯ٣ٕ ﺃꢋ٤ꢄ٘ﺍُﺋﺒﻮ ْﺙﺏُﺯ٠ِ ػ- 13
. ﺥ٤ﻕ ﻅꢒُﺥ ﺍ٣ﺏꢊُٞ ﻝ ﺩﺍ ﺍٚ ّٖ ُ٤ ﺍُﺑﺰﺙؼꢡﺑﻘﺶꢁﻝ ٓ ٖﻟﺮﻫﺎﺀﺍ ﺍꢃﺅﺯ٣ٕ ﺃٚ ٤ِﺕ ػꢐ٣ٝ . ꢖ٣ꢀﺍُﺯ ﻅ٢ ﺡﻙꢂﻫﺎُٞﺍ
. ﺱꢂ ﺏꢏ ٞꢊٝػ٘ﻝٝ ﺃꢢﺍ ﻩٞؽﺏُﺥ ﺍُﻁ٢ ػٔﺏ ٍﻙꢁﻍ ﺍ٤ٔ ﻉꢥﺑﻮ٣ﺕ ﺇꢐ٣ - 14
ꢅٝ ꢀꢒﻳﺰﺍ ّﺙꢞُ ﺫ ػ٘ﻝ ﻝ ّﺍ١ ꢊٝﺃ٢ ﻙꢉٔ ﺍُؼꢥﺑﻮ٣ꢣﺥﺙ٤ؽꢈٓﺥ ﺍُ ﻅꢈَُﺍ٢ꢄꢝ ٞ ٝ ꢉٔ ﺍُؼꢖ٣ꢀﻝﻫﺎﺭ ﻅꢔﺥ ﺇٜꢐُ ﻥ٣ - 15
. ٓﺥꢈَُﺍ
.ٟꢀ ﻓﺄٝﺡꢀﺯﻙ ٖ ٤ﺙꢠُ ﻡ، ٝﻍꢊٞ ٍ ﺍꢥٝꢀꢝ ﺝﺥꢊﺍꢀٓٝ ꢖ٣ꢀﺍُﺯ ﻅ٢ ﺣﻪﻙٞꢃꢋُٔﺍꢅٝ ꢀꢒُﺝﺥ ﺍꢊﺍꢀٓ ꢉ ﺍُؾﻭꢉꢜꢒٓ٠ِ ﺕ ػꢐ٣ - 16
.ٙ ﻫﺎﻝꢔ ٖٓ ٖﺇ٤ﺏػﺯꢍ ﺏﺀꢦﺝﺃﻝﺙؼﻝ ﺍٗﻭ٣ُْ ٝ ﺃꢉٔﺍُؼꢗꢊٝ ﺇﺍﻡ ﺃꢖ٣ꢀﻝ ﺍُﺯ ﻅ٣ﻝꢐﺭꢋ٤ꢄ ٘ﺍُﺋﺒﻮ ْﺙﺏُﺯ٠ِ ﺕ ػꢐ٣ - 17
ꢀٜ ٔﺣﻞﺵꢗ ُُِٔﺍ٢ ﺙَ٘ﻕﺥﻙꢨꢄؾﺯ٣ . ꢉ ﺍُؾﻭꢉꢜꢒٓ َٗﻕﺥٝﺥ٤ِꢔꢁ ٓ ٖﺍَُ٘ﻕﺥ ﺍꢧꢂٔﺏ ٍﺍُﻭ َْﺍَُﺏꢃꢣﺙꢖ٣ ꢀﺏ ٍﺍُﺯ ﻅꢄꢊﺕ ﺇꢐ٣ - 18
. ﺍ ﻝٝ
.ٜ٤ْ ِﺏ ػٜꢅٞ ٖﻭꢍٓ ꢡﻗﺶﺏꢁﺥ ﺍ٣ ٕٓ ُٖؾٔﺏꢟﺏꢌٓ٢ ﺍُٔؼ ﺩﺍﻝﻙٝ ﺩꢞ٥ﻍ ﺍꢕٞﺭ - 19
. ﺩﺏ٤ِٔﺕ ﺍُؼ٤ﺃٗﺏﺙ٠ِ ﺏ ػٜﻭ٤ِ ﺭٝ ﺩ ﺃꢞٞٔﻍ ؽꢕّ ٝﺕ ػﻝꢐ٣ - 20
. ﺀﺍꢀꢦﺥ ﺍُﻕꢊﺍُﺑﻄﺞꢂٞ ﻉٝٝ ﺯٔﺏ ٍﺍُﺑﻮﺉٔﺥꢃؾﺽ ﺍꢄﺙꢠُ ﻡ، ٝﺏٜٓﻗﺰﺍﻝꢍ ﺍꢉﺝꢊ ﺏٜ٤ِ ﻧﻜﺎ ػٞ ﺩꢞﻝ ٓ ٖﺃ ٕﺍَُﺑﻮꢃﺅﺭ - 21
. ؽ ﺩﺍﻝ ﺍُﺏ ِﺥُٞﺍ٢ ﺥﻙ٤ﺝꢒ ﺍُﻕꢓﺍُٞꢁﺭَﺯﻟﻖ ّﺍꢞ - 22
. ﺥ٤ﺏﺉꢩ٘ﺯꢍﺥ ؽﺏُﺥ ﺍ٣ﺃ٢ ﺥﻙ٤ﺯ٣ٞꢌُﺥ ﺍ٤٘ꢅُٞ ٍﺍٝꢀﺥ ﺍُﺝﺯꢃꢀꢒٓﺥﺙꢈَُﺍꢊَْ ٖ ٓ ﻛﺎﻭﺥ َﺝﻭﺥٞ ٠ِ ٍػٞﺕ ﺍُ ﻅꢐ٣ - 23
Using ﺥﻣﺎﺩꢀﺳﺐ
ꢁ
(mention tools/equipment & Safety Cert. No. ٕ ﺩﻟﻊٝٓﺥ ﺇꢈَُﺡ ﺍꢂﺏٜﺵꢊْ ﻩٝ ﺍُٔؼﺍﻝ ﺩ/ ﺩﺍٝꢂꢁ ﺍꢀꢃ(( ﻣﺎ
if applicable)
ꢐﺍﺳﺪ ﺇﻥꢏ )(ﺝ Issuer…….
(C) Issued to
Executor
Dept./ Div./ Craft/Contractor َْ ﺍُﻭ/ ﺡꢀﺍُﺍﻝﺉ/ٍٝ ﺍُٔﺑﻮ/ﻙﺥꢀؽ Tele: ْ ﻓﺘﺎ
isolated by:
Emp. Name. ꢍْ ﺍ Emp. ꢊْ ﻩ Designation ﺥꢄ٤ꢝُٞﺍ Signat ﻍ٤ꢊٞﺍُﺯ Tele ꢗﺏﺭٛ
ꢗꢝُٞٔﺍ No ꢗ٤ꢝٞﺍُﺯ ure .
5. Authorization / Renewal (It is safe to proceed -5 ﺫٌﺫꢝꢁﻥꢂ / ﺷﺺٌﺡꢁﻥꢂ) ꢊꢞ ﺫﺀꢄﻥꢂ ꢟ ﻭًٌﻙꢟ ﻳﺂꢌꢠﻯ
with this job) ﻡꢋًﻥꢂ ꢂﺯꢒ(
/ ﺥ٣ꢂ ﻩُٞﺍ Time ﺫꢊُٞﺍ Name / Emp. No./ Signature. ﻑꢑꢮﻯꢅﻥꢁ ꢤꢇꢂ / ꢭꢑꢇﻯꢅﻥꢁ
ـ٣ﺍُﻫﺒﺰ
Date / ٖ ٠ُﺇ ﺍُٔ ﻅﻫﻞ ꢋꢄُ٘ٔﺍ ٍٝﺍُٔﺑﻮ ꢉ ﺍُؾﻭꢉꢜꢒٓ
Shift From To Issuer Executor Contractor Field
Operator
Remarks:...……........................................................
...............................................................................………………….ﺩﺏꢘؽꢈٓ
APPENDIX - D
(Reverse of Hot Work Permit form)
GENERAL CONDITIONS OF PERMIT
1 Display the permit at work site with associated authorisations.
2 Separate permits are required for different Maintenance crafts & jobs.
3 Only authorised personnel holding valid "Work Permit Issuer/Executor" card can sign permit.
4 Only field operators/contractors with work "permit awareness training" can sign respective column.
5 Only authorised gas testers holding valid certification for gas test can sign gas test.
6 Issuer may authorize work, only if the gas tests results are within the permissible range.
7 Mention Clear description of the work. Issuer or executor may fill Section-1.
8 Issuer must fill or tick all relevant items from Sections 2 to 4. Specify additional requirements under remarks. Inform
critical work and road closures to ECCC. (ECCC will inform Safety)
9 Operation's Issuer is responsible for safe handing over of equipment to Maintenance.
10 Field operator must check site and sign the permit before start of the work.
11 Executor must not start work before getting permit or on an incomplete work permit.
12 Executor must provide adequate supervision and must be always present during critical work.
13 Executor must ensure providing all recommended protective before starting work and compliance to all permit
conditions. He must ensure his people are wearing appropriate PPE.
14 Suspend all work in case of plant emergency or accident.
15 Issuing Division and Safety personnel have the right to stop the job any time on safety reasons.
16 Field operator shall monitor permit conditions and site conditions frequently.
17 Executor must renew the permit if the work is 'stopped' or 'not started' for over 2 hrs.
18 Close the permit by completing Section-6 of original and field operator copy. Keep in file for 1 month.
19 All tools and equipment shall be secured and personnel protected from falling objects.
20 Do not anchor to or suspend loads on process piping.
21 Do not use scaffolds without valid green scaffold tag.
ﺹﺵٌﺡꢁﻥﻩꢀﺍﻱꢋﻥꢂ ﻭﺵﻁꢥﻥꢂ
. ﺥꢊꢈ ﺩﺍﻡ ﺍُؼꢖ٣ ٓﻍ ﺍُﺯ ﻫﺒﻆꢉٔﻍ ﺍُؼꢊٞ ٢ ﻙꢖ٣ꢀﻍ ﺍُﺯ ﻅꢕ ٝﺕꢐ٣ - 1
. ﺥꢄِﺏٗﺥ ٓﺯﻕ٤ꢔﺥ٤ِٔ ػꢉꢌ ُ َﻭﺯِﺥꢖ٣ﺭ ﻫﺒﻆꢛﺍꢀﻗﺰꢍﺕ ﺍꢐ٣ - 2
.ٍ ٞؼꢄُٔﺥ ﺍ٣ﻫﺐꢍ ꢉٔﻣﺈ ٕﺍُؼꢋꢄ٘ ٓ/ﺥ ٓ ﻅﻫﻞꢊﺑﻄﺚ٠ِ ٕػِٞꢔﺍُﺏꢠُꢋ ٕﺙُٞٞ ﺍُٔﻕꢡﻗﺶﺏꢁ ﺍꢞ ﺇꢖ٣ﺍُﺯ ﻫﺒﻆ٠ِ ﻍ ػ٤ꢊٞﺙﺏُﺯّٞ ﻭ٣ ꢞ - 3
ﺍٞﻝﺭِﻭꢊ ﺍٞٗﺏꢃ ﺇﺍﻡꢖ٣ﺍُﺯ ﻫﺒﻆ٢ ﻙْٜﺥﺙꢔػٔﺣﻞ ﺍُﺑﻖꢁﺑﻒٗﺩﺏ ﺍ٢ ﻍﻙ٤ꢊٞ ﺍُﺯꢉﺍُؾﻭ٢ ٍﻙٝػٔﺏ ٍﺍُٔﺑﻮٝ ꢉﺍُ ﻭ٢ِ ꢜꢒٔꢑ ُﻭﻙ ٖ ꢌٔ٣ - 4
. ꢉٔﺍُؼ ꢖ٣ﺏ ّﺭ ﻫﺒﻆꢘ٘ﺥﺙ٤ػٞ ﺍُﺯꢎٓﺏꢀٗﺥﺙꢊﺑﻄﺚ٠ِ ﺍ ػِٞ ؽ ﻅٝﺕ٣ﺍُﺯﻫﻞ
ꢊَْ ٖ ٓ ﺣﻪꢂﺏꢔٍ ٞؼꢄُٔﺥ ﺍ٣ﻫﺐꢍ ﺥꢊﺑﻄﺚ٠ِ ٕػِٞꢔﺍُﺏ، ꢠُꢋ ٕﺙُٞٞ ﺍُٔﻕꢡﻗﺶﺏꢁ ﺍꢞﺏﻯ ﺇꢜُﻫﺒﺠﺰ ﺽﻙ ﺍ ﺍﻑ٠ ِﻍ ػ٤ꢊٞﺙﺏُﺯّٞ ﻭ٣ ꢞ - 5
. ﺏﻯꢜُ ﻙﺽ ﺍ٠ ِﺝﺏ ػ٣ﺍﺭﻝ ﻩٞ ْﺭِﻭٜٗﻝﺙﺅ٤ꢄٓﺥﺭꢈَُﺍ
.ٚ ﺙꢓَُٞٔٔﺍٟ ٔ ٖﺍُٔﻝꢕ ﯨﺐ ꢜُ ﺽﻙ ﺍꢎﺏٗ ﺫ ٗﺑﺰﺉꢃ ﺇﺍﻡꢞ ﺇꢉٔﺀﺍ ﺍُؼꢂﺅﺙ ꢖ٣ ꢀﺙﺏُﺯ ﻅꢉٔ ﺍُؼꢖ٣ꢀٓ ﻅﻫﻞﺭ ﻅّٞ ﻭ٣ ꢞ - 6
. 1-َْ ﺏٗﺩﺏ ﺍُﻭ٤ﺀﺏﺙꢄ٤ﺯꢍﺍٙꢋ ꢄ٘ٓٝ ﺃꢖ٣ꢀٓ ﻅﻫﻞ ﺍُﺯ ﻅ٠ِ ػٝ . ꢉٔ ُِؼꢖꢕﺍ١ ٝꢉ٤ ﻅꢄﺭꢗꢔ ٝﺕ ﺇ ﺑﻂﺀꢐ٣ - 7
ﺏﺭ ﺫٛꢀꢃꢋﺥﺙ٤ﻛﺐ ꢕꢆﻝ ﺍُٔﻃﺰِﺩﺑﺞ ﺍ٣ ﻝﺭٝ، 4٠ُ ﺇ2َْ ﺥ ٓ ٖﺍُﻭꢊꢈ ﺩﺍﻡ ﺍُؼꢂٞ٘ ﺍُﺝꢉꢃ ﺀﺏꢄ٤ﺯꢍ ﺍꢉٔ ﺍُؼꢖ٣ꢀٓ ﻅﻫﻞﺭ ﻅ٠ِ ﺕ ػꢐ٣ - 8
ﻫﺒﻄﻒꢣﻱﺙꢃꢀُٔﺍّٞ ﻭ٣ٝ ( ꢚꢀ ﺍُﻁꢚꢈ ﺇؿٝﺡꢀػٔﺏ ٍﺍُﻃﻖꢁﺑﺚꢢﻫﺎٞ ﺩ ﺍُﻁꢞﺍﺭ ﺑﻆꢌْ ﻱ ﺭꢃꢀٓ ﺯ ْ ﻫﺒﻄﻔﺈ٣ٕ ﺃ٠ ِ ػ، ﺩﺏꢘؽꢈُٔﺙ٘ﻝ ﺍ
. ) ٓﺥꢈَُﺍꢊَْ
. ﺏٗﺥ٤ﺍُ ﻅ٠ ُٗﺥ ﺇٞٓ ﻩﺡ ٓﺅٞ ْﺍُٔؼﻝﺍ ﺩﺙ ﻅ٤َِ ػ ٖﺭꢞٞꢤَٓ ﺏ ﺩ٤ِٔ ٓ ٖﺍُؼꢉٔ ﺍُؼꢖ٣ꢀ ٕٓ ﻅﻝ ﻩﺭ ﻅٞꢌ٣ - 9
- 10ػ ِ ꢉꢜꢒٓ٠ﺍُؾﻭ ꢉﺃ ٕ٣ﺯꢄﻟﻮ ﺍُٔꢊٞﻍꢊٞ٣ ٝﻍ ػ ِ٠ﺍُﺯ ﻅꢊ ꢖ٣ꢀﺝꢉﺀﻟﺚ ﺍُؼٔ. ꢉ
- 11ػ ِ٠ﺍُﺋﺒﻮ ْﺙﺏُﺯ٘ ꢋ٤ꢄػﻝ ّٓﺷﺒﺞꢀﺡ ﺍُؼٔꢊ ꢉﺝ ꢉؽ ﻅُٚ ٞػ ِ٠ﺭ ﻅ ꢓ١ꢀﺍُؼٔ ꢉﺃ ٝػ ِ٠ﺭ ﻅ ꢖ٣ꢀػٔ ꢉؿ ꢌٓꢀ٤ﺯٔ. ꢉ
- 12ػِ ٠ﺍُﻭﺏﺉ ْﺙﺏُﺯ٘ꢋ٤ꢄﺭٞﻙ ꢀ٤ﺇﺵꢀﺍ٘ٓ ꢥﺏꢍﺕ ꢐ٣ٝﺕ ﺃ ٕٕٞٓ ٞꢌ٣ﻉꢂٞﺍ ٞꢅﺍ ٍﻙﺯꢀﺡﺭ٘ ꢋ٤ꢄﺃ ١ػٔ٣ ꢉﺯَ ْﺙﺏُﻕﻁ ٞﻩﺡ .
- 13ػ ِ٠ﺍُﺋﺒﻮ ْﺙﺏُﺯ٘ ꢋ٤ꢄﺃ ٕ٣ﺅﺯꢃﻝ ٓ ٖﺭٞﻙ َٓ ꢉꢃꢀ٤ﺯِﻱٓﺩﺏ ﺍُꢊٞﺏ٣ﺥ ﺍُٔ٠ꢔ ٞﺙٜﺏ ꢊﺝ ꢉﺍُﺀﻟﺞﻙ ٢ﺍُؼٔٝ , ꢉﺍُꢞﻳﺰﺍ ّﺙ٤ٔꢐﻍ ﺍُꢅٝ ꢀꢒﺍُٞﻫﺎꢂﺡ
ﻙ ٢ﺍُﺯ ﻅꢐ٣ٝ . ꢖ٣ꢀﺕ ػِٚ ٤ﺃ ٕ٣ﺅﺯꢃﻝ ٓ ٖﻟﺮﻫﺎﺀﺍ ﺍꢁﺑﻘﺶ ꢡﺍُﺑﺰﺙؼ ٓٚ ٖ ُ٤ﻝ ﺩﺍ ﺍُꢊٞﺏ٣ﺥ ﺍُꢒﻕ ﻅ٤ﺥ .
ꢐ٣- 14ﺕ ﺇ٣ﺑﻮ ꢥﻉٔ٤ﻍ ﺍꢁػٔﺏ ٍﻙ ٢ؽﺏُﺥ ﺍُﻁٞﺍ ﻩ ꢢﺃ ٝػ٘ﻝ ꢏ ٞꢊٝﺏꢂﺱ .
٣- 15ﻥ ُٜꢐﺥ ﺇꢔﻝﻫﺎﺭ ﻅ ꢖ٣ꢀﺍُؼٔ٢ꢄꢝ ٞ ٝ ꢉﺍَُٓꢈﺥ ﺇ٣ﺑﻮ ꢥﺍُؼٔꢉﻙ ٢ﺃ ١ ꢊٝﺫ ػ٘ﻝ ﻝ ّﺍُꢞﻳﺰﺍ ّﺙꢅٝ ꢀꢒﺍَُٓꢈﺥ .
ﺯﻙꢀﺡ ٝﻓﺄ .ٟꢀ ꢐ٣- 16ﺕ ػ ِ ꢉꢜꢒٓ٠ﺍُؾﻭꢀٓ ꢉﺍꢊﺝﺥ ﺍُꢅٝ ꢀꢒﺍُٔٞꢃꢋﺣﻪﻙ ٢ﺍُﺯ ﻅꢀٓٝ ꢖ٣ꢀﺍꢊﺝﺥ ꢥٝꢀꢝﺍُٔꢊٞﻍ ، ٝﻡ ُꢠﺙٖ ٤
ꢐ٣- 17ﺕ ػ ِ٠ﺍُﺋﺒﻮ ْﺙﺏُﺯ٘ ꢋ٤ꢄﺭꢐﻝ٣ﻝ ﺍُﺯ ﻅ ꢖ٣ꢀﺇﺍﻡ ﺃ ꢗꢊٝﺍُؼٔ ꢉﺃ ٣ُْ ٝﺝﺃﻝﺙؼﻝ ﺍٗﻭꢦﺏﺀ ꢍﺏػﺯٖ ٖٓ ٤ﺇꢔﻫﺎﻝ .ٙ
ꢝﺙَ٘ﻕﺥﻙ ٢ﺍُُِٔ ٔꢗﺣﻞﺵٝ ꢀٜﺍ ﻝ . ꢐ٣- 18ﺕ ﺇꢄꢊﺏ ٍﺍُﺯ ﻅꢖ٣ ꢀﺙٔꢃꢣﺏ ٍﺍُﻭ َْﺍَُﺏٖ ٓ ꢧꢂﺍَُ٘ﻕﺥ ﺍ٤ِꢔꢁﺥَٗ ٝﻕﺥ ٓ ꢉꢜꢒﺍُؾﻭ٣ .ꢉؾﺯꢗ
- 19ﺭꢕٞﻍ ﺍ ꢞ٥ﺩ ٝﺍُٔؼ ﺩﺍﻝﻙ ꢌٓ٢ﺏُٖ ٕٓ ꢟؾٔﺏ٣ﺥ ﺍꢁﻗﺶﺏٖ ꢍٓ ꢡﻭٜꢅٞﺏ ػِ ْ.ٜ٤
ꢐ٣- 20ﺕ ػﻝꢕّ ٝﻍ ؽٔ ꢞٞﺩ ﺃ ٝﺭِ٤ﻭٜﺏ ػ ِ٠ﺃٗﺏﺙ٤ﺕ ﺍُؼِٔ٤ﺩﺏ .
ﺅﺭꢃﻝ ٓ ٖﺃ ٕﺍَُﺑﻮ ꢞﺩ ٞﻧﻜﺎ ػِٜ٤ﺏ ꢊﺝ ꢉﺍꢍﻗﺰﺍﻝٜٓﺏ ، ٝﻡ ُꢠﺙꢄؾﺽ ﺍꢃﺯٔﺏ ٍﺍُﺑﻮﺉٔﺥ ٝٝﻉ ꢂٞﺍُﺑﻄﺞꢊﺥ ﺍُﻕꢀꢦﺀﺍ . - 21
ꢞ- 22ﺭَﺯﻟﻖ ّﺍُٞꢁﺍ ꢓﺍُﻕꢒﺝ٤ﺥﻙ ٢ﺍُٞؽ ﺩﺍﻝ ﺍُﺏ ِﺥ .
ꢐ٣- 23ﺕ ﺍُ ﻅٍ ٞػ ِٞ ٠ﻛﺎﻭﺥ َﺝﻭﺥ ٓ ٖ َْꢊﺍَُٓꢈﺥﺙꢃꢀꢒﺥ ﺍُﺝﺯٍ ٝꢀﺍُ٤٘ꢅٞﺥ ﺍُ٣ٞꢌﺯ٤ﺥﻙ ٢ﺃ٣ﺥ ؽﺏُﺥ ﺍꢍﺯ٘ꢩﺏﺉ٤ﺥ .