Professional Documents
Culture Documents
List of Works Submitted
List of Works Submitted
I KIIFB Works
1 Design in progress
II IWT Works
Construction of road Bridge with
1 footpath across Badagara Mahe Canal Proposal received. Design is to be taken up
at Vengoli
III Other Works
1
Construction of checkdam across
Kannimala river in Munnar Panchayath
DRIP-Kuttyadi Dam - Strengthening of
2 dam on downstream by concrete
backing -
Construction of regulator with lock
across Konothupuzha at Puthenkavu in
3
Udayamperoor Grama Panchayath in
Ernakulam District.
21
Check
dam
across
Construct
KIIFB
22 Thootha
ion of
Regulator
river
damaged
across
approach
Thootha
23 road
river of
at
Perumpuz
Valavupa
ha
lam
kadavu
Weir cum
24 Bridge
bridge in
Changana
across
ssery
Kuruman
25 Muncipal
puzha
ity-
,Malappu
Revision
ram
Project submission date date
Reason for delay
4/16/2018
FS & AS sanctioned