BASIC MATERIAL CONSUMPTION

Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage

Backfilling with material brought from


1 1.000 Cft
outside
Murum 1.000 20% 1.200 Cft
Plum Concrete In CC 1:4:8 with 30%
2 1.000 Cft
plum , 70% concrete
Cement (50kg Bag) 0.057 3% 0.058 Bag
Crush Sand 0.480 5% 0.504 Cft
Metal 3/4" 0.660 3% 0.680 Cft
Fly Ash 0.454 2% 0.463 Kg (8kg per bag)
Plastisizer 0.013 3% 0.013 Lit (CF 111,250ml per bag)
Dubber 0.400 10% 0.440 Cft
Plum Concrete In CC 1:4:8 with 40%
3 1.000 Cft
plum, 60% concrete
Cement (50kg Bag) 0.051 3% 0.053 Bag
Crush Sand 0.280 5% 0.294 Cft
Metal 3/4" 0.560 3% 0.577 Cft
Fly Ash 0.408 2% 0.416 Kg (8kg per bag)
Plastisizer 0.013 3% 0.013 Lit (CF 111,250ml per bag)
Dubber 0.400 10% 0.440 Cft

4 PCC M7.5 (1:4:8) 1.000 Cft

Cement (50kg Bag) 0.085 3% 0.088 Bag


Crush Sand 0.600 5% 0.630 Cft
Metal 3/4" 0.825 3% 0.850 Cft
Fly Ash 0.680 2% 0.694 Kg (8kg per bag)
Plastisizer 0.021 2% 0.022 Lit (CF 111,250ml per bag)

5 PCC M 10 (1:3:6) 1.000 Cft

Cement (50kg Bag) 0.113 3% 0.117 Bag

Crush Sand 0.600 5% 0.630 Cft

Metal 3/4" 0.825 3% 0.850 Cft

Fly Ash 0.907 2% 0.925 Kg (8kg per bag)


Plastisizer 0.028 2% 0.029 Lit (CF 111,250ml per bag)

6 RCC M15 (1:2:4) 1.000 Cft

Cement (50kg Bag) 0.147 3% 0.152 Bag

Crush Sand 0.600 5% 0.630 Cft

Metal 3/4" 0.825 3% 0.850 Cft

Fly Ash 1.179 2% 1.203 Kg (8kg per bag)


Plastisizer 0.037 2% 0.038 Lit (CF 111,250ml per bag)

7 RCC M20 (1:1.5:3) 1.000 Cft


As per mix design
Cement (50kg Bag) 0.153 3% 0.158 Bag

Crush Sand 0.600 5% 0.630 Cft

Metal 3/4" 0.825 3% 0.850 Cft

Fly Ash 1.701 2% 1.735 Kg

Plastisizer 0.038 2% 0.039 Lit 250ml per bag

8 RCC M25 (1:1:2) 1.000 Cft


As per mix design
Cement (50kg Bag) 0.170 3% 0.175 Bag

Crush Sand 0.600 5% 0.630 Cft

Metal 3/4" 0.825 3% 0.850 Cft

Fly Ash 1.701 2% 1.735 Kg

Plastisizer 0.051 2% 0.052 Lit 300 ml per bag

9 RCC M30 (1:1:1) 1.000 Cft


As per mix design
Cement (50kg Bag) 0.187 3% 0.193 Bag

Crush Sand 0.600 5% 0.630 Cft

Metal 3/4" 0.825 3% 0.850 Cft

Fly Ash 1.701 2% 1.735 Kg

Plastisizer 0.031 2% 0.032 Lit 375ml per bag


BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
10 RCC M35 1.000 Cft
As per mix design
Cement (50kg Bag) 0.210 3% 0.216 Bag

Crush Sand 0.600 5% 0.630 Cft

Metal 3/4" 0.825 3% 0.850 Cft

Fly Ash 1.701 2% 1.735 Kg

Plastisizer 0.084 2% 0.086 Lit 400ml per bag

11 Ready Mix Plaster 1.000 Sft

Ready Mix Plaster (40kg Bag) 0.558 3% 0.575 Bag

River Sand 0.000 3% 0.000 Cft


Crush Sand 0.000 3% 0.000 Cft

Fly Ash 0.000 3% 0.000 Kg

12 Steel Reinforcement Mild Steel bars 1.000 Kg

Steel (Wastage Considered 3%) 1.000 3% 1.030 Kg

Binding Wire 18 to 20 Guage Annealed 0.012 5% 0.013 Kg 18 to 20 Guage Annealed


Less for Scrap Steel Sold -0.015 0% -0.015 Kg
Masonary Work 115 mm thk in CM 1:4
13 1.000 Sft
(230 x 110 x 80)
Cement (50kg Bag) 0.014 3% 0.014 Bag
River Sand 0.013 30% 0.017 Cft Additional only for raking(15%)
Crush Sand 0.089 5% 0.093 Cft

Fly Ash 0.209 2% 0.213 Kg 15kg per bag(30%)


Fly Ash Bricks 4" 4.465 4% 4.644 Nos

Masonary Work 115 mm thk in CM 1:6


14 1.000 Sft
(230 x 110 x 80)
Cement (50kg Bag) 0.011 3% 0.011 Bag

River Sand 0.020 30% 0.026 Cft Additional only for raking(15%)
Crush Sand 0.131 5% 0.138 Cft

Fly Ash 0.162 2% 0.165 Kg 15kg per bag(30%)


Fly Ash Bricks 4" 4.465 4% 4.644 Nos
Light Weight Block Masonary Work 100
15 1.000 Sft
mm thk in CM 1:4 (650 x 240 x 100)
Cement (50kg Bag) 0.007 3% 0.007 Bag

River Sand 0.007 30% 0.009 Cft Additional only for raking(15%)
Crush Sand 0.039 5% 0.041 Cft

Fly Ash 0.100 2% 0.102 Bag 15kg per bag(30%)


Siporex Block 4" 0.651 4% 0.677 Nos
Masonary Work 150 mm thk in CM 1:6
16 1.000 Sft
(230 x 150 x 80)
Cement (50kg Bag) 0.012 3% 0.013 Bag

River Sand 0.033 30% 0.043 Cft


Crush Sand 0.210 5% 0.220 Cft

Fly Ash 0.186 2% 0.189 Kg

Fly Ash Bricks 6" 4.372 4% 4.547 Nos


Light Weight Block Masonary Work 150
17 1.000 Sft
mm thk in CM 1:6 (650x240x150)
Cement (50kg Bag) 0.008 3% 0.009 Bag

River Sand 0.007 30% 0.009 Cft

Crush Sand 0.046 5% 0.048 Cft

Fly Ash 0.126 2% 0.128 Kg

Siporex Block 6" 0.651 4% 0.677 Nos


Masonary Work 200 mm thk in CM 1:6
18 1.000 Sft
(200x150x80)
Cement (50kg Bag) 0.023 3% 0.023 Bag

River Sand 0.033 30% 0.043 Cft

Crush Sand 0.210 5% 0.220 Cft

Fly Ash 0.339 2% 0.346 Kg

Fly Ash Bricks 6" 6.512 4% 6.772 Nos


BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
Light Weight Block Masonary Work 150
19 1.000 Sft
mm thk in CM 1:6 (650x240x200)
Cement (50kg Bag) 0.013 3% 0.014 Bag

River Sand 0.013 30% 0.017 Cft

Crush Sand 0.079 5% 0.083 Cft

Fly Ash 0.201 2% 0.205 Bag

Siporex Block 6" 0.651 4% 0.677 Nos

20 RCC Patli (Band) in CC 1:2:4 1.000 Sft

Cement (50kg Bag) 0.465 3% 0.479 Bag

Crush Sand 1.968 5% 2.066 Cft

Metal 3/4" 2.706 3% 2.787 Bag


Fly Ash 3.721 2% 3.795 Kg

Plastisizer 0.000 3% 0.000 Lit


Chicken Mesh to the joint of RCC & Brick
21 1.000 Sft
Masonary
Chicken Mesh 1.000 10% 1.100 Sft

Nails & Washers 0.014 5% 0.015 Kg


Internal Plaster 12mm Thk in CM 1:4 with
22 1.000 Sft
Sanala Finish
Cement (50kg Bag) 0.011 3% 0.012 Bag

River Sand 0.066 30% 0.085 Cft


Fly Ash 0.169 2% 0.172 Kg

Sanala ( 25kg bag) 0.007 5% 0.007 Bag

Fibres 2.251 5% 2.364 gm 200gm per bag


Internal Plaster 12mm Thk in CM 1:4
23 1.000 Sft
without Sanala Finish
Cement (50kg Bag) 0.011 3% 0.012 Bag

River Sand 0.066 30% 0.085 Cft

Fly Ash 0.169 2% 0.172 Kg

Fibres 2.251 5% 2.364 gm 200gm per bag

24 Gypsum Plaster 1.000 Sft

Gypsum (25 Kg Bag) 0.081 5% 0.085 Bag


External Plaster Single Coat - 20 mm thk
25 1.000 Sft
in CM 1:4
Cement (50kg Bag) 0.020 3% 0.020 Bag

River Sand 0.105 30% 0.136 Cft

W.P.Chemical 0.020 3% 0.020 Kg

Fibres 5.860 3% 6.036 gm 300gm per bag


External Plaster Double Coat - Base Coat
26 15 mm thk in CM 1:5 & Finishing Coat 10 1.000 Sft
mm in cm 1:4

Cement (50kg Bag) 0.023 3% 0.024 Bag

River Sand 0.121 30% 0.158 Cft

W.P.Chemical 0.023 3% 0.024 Kg

Fibres 6.949 3% 7.157 gm 300gm per bag

Box Type Waterproofing with rough


27 1.000 Sft
Shahabad -Hori Surface in CM 1:5

Cement (50kg Bag) 0.047 3% 0.049 Bag

River Sand 0.164 30% 0.213 Cft

Metal 3/4" 0.072 5% 0.076 Cft

Shahabad Stone 1"thk 1.020 5% 1.071 Sft


W.P.Chemical 0.047 3% 0.049 Kg
Box Type Waterproofing with rough
28 1.000 Sft
Shahabad -Vertical Surface in CM 1:5
Cement (50kg Bag) 0.060 3% 0.062 Bag

River Sand 0.154 30% 0.200 Cft

Shahabad Stone 1"thk 1.020 5% 1.071 Sft

W.P.Chemical 0.060 3% 0.062 Kg


BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
Brick Bat Waterproofing to Toilets with
29 200 mm sunk in CM 1:5 ,Base coat 10mm 1.000 Sft
Finishing Coat 10 mm

Cement (50kg Bag) 0.053 3% 0.054 Bag

River Sand 0.361 30% 0.469 Cft


waterproofing bricks 4" 3.814 4% 3.967 No

W.P.Chemical 0.053 3% 0.054 Kg


Chemical Waterproofing to Toilet With 50
30 mm sunk
1.000 Sft

Cement (50kg Bag) 0.030 3% 0.031 Bag


River Sand 0.085 30% 0.111 Cft

Metal 3/4" 0.134 5% 0.141 Cft

W.P.Chemical 0.035 3% 0.036 Kg


Chemical Waterproofing to Utility With 50
31 1.000 Sft
mm sunk
Cement (50kg Bag) 0.030 3% 0.031 Bag

River Sand 0.085 30% 0.111 Cft

Metal 3/4" 0.134 5% 0.141 Cft

W.P.Chemical 0.035 3% 0.036 Kg


Chemical Waterproofing to attached
32 Terraces With 50 mm sunk
1.000 Sft

Cement (50kg Bag) 0.030 3% 0.031 Bag

River Sand 0.085 30% 0.111 Cft

Metal 3/4" 0.134 3% 0.139 Cft

W.P.Chemical 0.035 3% 0.036 Kg


Chemical Waterproofing to Dry Terraces
33 1.000 Sft
With 50 mm sunk
Cement (50kg Bag) 0.030 3% 0.031 Bag

River Sand 0.085 30% 0.111 Cft

Metal 3/4" 0.134 3% 0.139 Cft

W.P.Chemical 0.035 3% 0.036 Kg


Brickbat Waterproofing to Terraces With
34 150 mm sunk in CM 1:5 & Finishing Coat 1.000 Sft
10mm
Cement (50kg Bag) 0.049 3% 0.050 Bag
River Sand 0.321 30% 0.418 Cft

Brick Bats 3.814 3% 3.928 No

W.P.Chemical 0.049 3% 0.050 Kg

Brickbat Waterproofing to OHWT bottom


35 With 150 mm sunk in CM 1:5 & Finishing 1.000 Sft
Coat 10mm

Cement (50kg Bag) 0.049 3% 0.050 Bag


River Sand 0.321 30% 0.418 Cft

Brick Bats 3.814 3% 3.928 No

W.P.Chemical 0.049 3% 0.050 Kg

IPS Coba Waterproofing to Horizontal


36 1.000 Sft
Surfaces For OHWT Top & LMR Top

Cement (50kg Bag) 0.035 3% 0.036 Bag

River Sand 0.171 30% 0.222 Cft

Metal 3/4" 0.115 3% 0.118 Cft

W.P.Chemical 0.035 3% 0.036 Kg


Cement finished water proofing Plaster
37 1.000 Sft
15mm thk in CM 1:4 to OHWT Walls
Cement (50kg Bag) 0.019 3% 0.019 Bag

River Sand 0.131 30% 0.171 Cft

W.P.Chemical 0.019 3% 0.019 Kg


Waterproof Filling of Sunk Area in CM 1:5
38 1.000 Sft
with Brick Bats
Cement (50kg Bag) 0.121 3% 0.125 Bag

River Sand 0.935 30% 1.215 Cft

Brick Bats 134.480 4% 139.859 Cft

W.P.Chemical 1.300 3% 1.339 Kg


BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
Ceramic Tile Flooring In CM 1:8 Ceramic
39 1.000 Sft
Tile 300 x 300 mm
Cement (50kg Bag) 0.018 3% 0.019 Bag

Crush Sand 0.154 5% 0.162 Cft

Ceramic Tile-300mm x 300mm 1.000 10% 1.100 Sft

Liduid tile Adhesive 0.005 3% 0.006 Lit 300ml per bag


Tile Grout (Joint Filler) 0.016 5% 0.017 Kg

Ceramic Tile Skirting 4" height in neat


40 1.000 rft
cement paste

Cement (50kg Bag) 0.007 3% 0.007 Bag

Ceramic Tile 0.330 10% 0.363 Sft

Liduid tile Adhesive 0.003 3% 0.003 Ltr 500ml per bag


Tile Grout (Joint Filler) 0.005 5% 0.006 Kg
41 Vitrified Tile Flooring in CM 1:6 1.000 Sft
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Vitrified Tile 1.000 10% 1.100 Sft

Liduid tile Adhesive 0.005 2% 0.006 Ltr

White Cement 0.023 3% 0.024 Kg


Vitrified Tile Skirting 4" ht. in neat
42 1.000 rft
Cement Paste
Cement ( 50 Kg Bag ) 0.007 3% 0.007 Bag

Vitrified Tile 0.330 10% 0.363 Sft

Liduid tile Adhesive 0.003 2% 0.003 Ltr

White Cement 0.008 3% 0.008 Kg

43 Imported Marble Stone Flooring in CM 1:6 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Italian Marble Stone 1.000 12.5% 1.125 Sft

Liquid Tile Adhesive 0.005 2% 0.006 Ltr

White Cement 0.063 3% 0.065 Kg


Italian Marble Stone Skirting 4" ht. in
44 1.000 rft
neat cement Paste
Cement ( 50 Kg Bag ) 0.007 3% 0.007 Bag

Italian Marble Stone 0.330 12.5% 0.371 Sft

Liquid Tile Adhesive 0.003 2% 0.003 Ltr

White Cement 0.030 3% 0.031 Kg

45 Green Marble Stone Flooring in CM 1:6 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Green Marble Stone 1.000 12.5% 1.125 Sft


Liquid Tile Adhesive 0.002 2% 0.002 Ltr

White Cement 0.090 3% 0.093 Kg


Green Marble Stone Skirting 4" height in
46 CM 1:8
1.000 rft

Cement ( 50 Kg Bag ) 0.007 3% 0.007 Bag


Crush Sand 0.052 5% 0.055 Cft
Green Marble Stone 0.330 12.5% 0.372 Sft
47 Kotah Stone Flooring in CM 1:8 1.000 Sft
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag
Crush Sand 0.157 5% 0.165 Cft
Kotah Stone 1.001 30.0% 1.301 Sft
48 Kotah Stone Skirting in CM 1:8 1.000 rft
Cement ( 50 Kg Bag ) 0.007 3% 0.007 Bag
Crush Sand 0.052 5% 0.055 Cft
Fly Ash ( 30 Kg Bag ) 0.000 3% 0.000 Kg
Kotah Stone 0.330 30% 0.429 Sft
BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
49 Tandoor Stone Flooring in CM 1:8 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag


Crush Sand 0.157 5% 0.165 Cft
Tandoor Stone 1.001 30% 1.301 Sft
50 Tandoor Stone Skirting in CM 1:8 1.000 rft
Cement ( 50 Kg Bag ) 0.006 3% 0.006 Bag
Crush Sand 0.052 5% 0.055 Cft
Fly Ash ( 30 Kg Bag ) 0.000 3% 0.000 Kg
Tandoor Stone 0.330 30% 0.429 Sft
51 Wooden Flooring in CM 1:8 1.000 Sft
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag
Crush Sand 0.157 5% 0.165 Cft

Ceramic Tiles For base 1.000 10% 1.100 Sft

Wooden Tile 1.020 5% 1.071 Sft

Adhesive 0.730 2% 0.745 Kg

52 Wooden Skirting in CM 1:8 1.000 rft

Cement ( 50 Kg Bag ) 0.007 3% 0.007 Bag

Crush Sand 0.052 5% 0.055 Cft

Ceramic Tiles For base 0.330 10% 0.363 Sft

Wooden Tile 0.337 5% 0.353 Sft

Adhesive 0.241 2% 0.246 Kg

53 Chequered Tile Flooring in CM 1:8 1.000 Sft

Cement ( 50 Kg Bag ) 0.012 3% 0.012 Bag

Crush Sand 0.157 5% 0.165 Cft

Chequered Tile 1.000 10% 1.100 Sft


IPS Flooring 40 mm Thk in CC 1:2:4 with
54 8 mm Thk Finishing Coat in CM 1:4
1.000 Sft

Cement ( 50 Kg Bag ) 0.034 3% 0.035 Bag

River Sand 0.131 30% 0.171 Cft

Metal 3/4" 0.112 3% 0.115 Cft

W.P. Chemical 0.035 3% 0.036 Kg

55 Paving Block Flooring 1.000 Sft

Cement ( 50 Kg Bag ) 0.000 3% 0.000 Bag

Crush Sand 0.203 5% 0.214 Cft

Paving Blocks 1.000 5% 1.050 Sft

56 Shahabad Stone Flooring in CM 1:8 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Shahabad Stone 1.150 3% 1.185 Sft


Imported Marble Stone Tread Fixing in
57 1.000 Sft
CM 1:8
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft


Italian Marble Stone 1.155 12.5% 1.299 Sft

White Cement 0.063 3% 0.065 Kg


Imported Marble Stone Riser Fixing in CM
58 1.000 Sft
1:8
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Italian Marble Stone 1.156 13% 1.301 Sft

White Cement 0.063 3% 0.065 Kg

59 Granite Stone Tread Fixing in CM 1:8 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft


Granite Stone 1.238 5% 1.300 Sft

White Cement 0.063 3% 0.065 Kg


BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
60 Granite Stone Riser Fixing in CM 1:8 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Granite Stone 1.238 5% 1.300 Sft

White Cement 0.063 3% 0.065 Kg


Green Marble Stone Tread Fixing in CM
61 1.000 Sft
1:8
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Green Marble Stone 1.000 12.5% 1.125 Sft


Green Marble Stone Riser Fixing in CM
62 1.000 Sft
1:8
Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Green Marble Stone 1.000 12.5% 1.125 Sft

63 Kotah Stone Tread Fixing in CM 1:8 10" 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Kotah Stone 1.000 30% 1.300 Sft

64 Kotah Stone Riser Fixing in CM 1:8 7" 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Kotah Stone 0.750 30% 0.975 Sft

65 Tandoor Stone Tread Fixing in CM 1:8 10" 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft


Tandoor Stone 1.000 30% 1.300 Sft

66 Tandoor Stone Riser Fixing in CM 1:8 7" 1.000 Sft

Cement ( 50 Kg Bag ) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Tandoor Stone 0.750 30% 0.975 Sft


Imported Marble Stone Window sill &
67 1.000 Sft
Jambs
Cement ( 50 Kg Bag ) 0.027 3% 0.028 Bag

River Sand 0.000 3% 0.000 Cft


Crush Sand 0.000 3% 0.000 Cft

Araldite 0.000 2% 0.000 Kg

Imported Marble Stone 1.001 12.5% 1.126 Sft

White Cement 0.063 3% 0.065 Kg

68 Granite Stone Window Sill & Jambs 4" 1.000 Sft


Cement ( 50 Kg Bag ) 0.027 3% 0.028 Bag

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 3% 0.000 Cft

Araldite 0.007 2% 0.007 Kg

Granite Stone 0.500 12.5% 0.563 Sft


Green Marble Stone Window Sill & Jambs
69 1.000 Sft
4"
Cement ( 50 Kg Bag ) 0.027 3% 0.028 Bag
River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 3% 0.000 Cft

Araldite 0.007 2% 0.007 Kg


Green marble Stone 0.500 12.5% 0.563 Sft
BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
70 Kota Stone Window Sill & Jambs 4" 1.000 Sft

Cement ( 50 Kg Bag ) 0.027 3% 0.028 Bag

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 3% 0.000 Cft

Araldite 0.007 2% 0.007 Kg

Kota Stone 0.500 13% 0.563 Sft

71 Imported Marble Stone Cladding 1.000 Sft

Cement (50kg Bag) 0.027 3% 0.028 Bags

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 5% 0.000 Cft

Araldite 0.007 2% 0.007 kg

Imported Marble Stone Cladding 1.001 12.5% 1.126 Sft

White Cement 0.063 3% 0.065 Kg

Granite Stone Cladding over Rough


72 1.000 Sft
Plaster Lift Jambs
Cement (50kg Bag) 0.027 3% 0.028 Bags
River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 5% 0.000 Cft

Araldite 0.007 2% 0.007 kg

Granite Stone 1.070 5% 1.124 Sft

73 Granite Stone Cladding over Rough Plaster 1.000 Sft


Cement (50kg Bag) 0.027 3% 0.028 Bags

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 5% 0.000 Cft

Araldite 0.007 2% 0.007 kg

Granite Stone 1.000 12.5% 1.125 Sft


Imported Marble Stone Umbra Patti
74 1.000 Rft
150mm ( 6" )
Cement (50kg Bag) 0.010 3% 0.011 Bags

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 5% 0.000 Cft

Araldite 0.023 2% 0.023 kg

Imported Marble Stone 0.500 12.5% 0.563 Sft

75 Granite Stone Umbra Patti 150mm ( 6" ) 1.000 Rft

Cement (50kg Bag) 0.010 3% 0.011 Bags

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 5% 0.000 Cft

Araldite 0.023 2% 0.023 kg

Granite Stone 0.500 12.5% 0.563 Sft


BASIC MATERIAL CONSUMPTION
Material
Sr Wastage Material
Item Coeff. Excl Material Unit Remark
No Factor Co-eff
Wastage
Green Marble Stone Umbra patti 150mm
76 1.000 Rft
Wide ( 6")
Cement (50kg Bag) 0.010 3% 0.011 Bags
River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 5% 0.000 Cft


Araldite 0.023 2% 0.023 kg

Green Marble Stone 0.500 12.5% 0.563 Sft

77 Kota Stone Umbra patti 1.000 Rft

Cement (50kg Bag) 0.010 3% 0.011 Bags

River Sand 0.000 3% 0.000 Cft


Crush Sand 0.000 5% 0.000 Cft

Araldite 0.023 2% 0.023 kg

Kota stone 0.500 12.5% 0.563 Sft

78 Glazed tile over Rough Plaster 1.000 Sft

Cement (50kg Bag) 0.027 3% 0.028 Bags

River Sand 0.000 3% 0.000 Cft

Crush Sand 0.000 3% 0.000 Cft

Tile Joint Grout 0.020 3% 0.021 kg

White Cement 0.009 3% 0.009 kg

Glazed Tile 1.000 10% 1.100 Sft


Granite Stone Door Frame-5" Base+5"
79 1.000 Rft
Top1" Overlap
Cement (50kg Bag) 0.124 3% 0.128 Bags

Granite 1.000 5% 1.050 Sft

Araldite 0.003 2% 0.003 Kg


Granite Top for common Hand wash Basin
80 -Otta top size 3'6" x 2'6"
1.000 Sft

Granite Stone Facia Patti 1.143 5% 1.200 Sft

Cement (50kg Bag) 0.018 3% 0.019 Bag

Crush Sand 0.157 5% 0.165 Cft

Arldide 0.004 2% 0.004 Kg


Laying of 5mm thk POP on Flooring as
81 1.000 Sft
Protective Layer Durring Construction
POP 0.660 3% 0.680 kg
Door Frame in ply on ply - 8" wide Base
82 1.000 Rft
size 3'3" x 7' ( as per Astonia Royale )
Water Proof ply wood 19mm thk 8" wide 1.400 10% 1.540 Sft

Water proof ply wood 12mm thk 0.960 10% 1.056 Sft

Laminate 1.660 10% 1.826 Sft

Fastner 10mm 0.030 10% 0.033 No

Nails/Screw 0.009 10% 0.010 Kg

Fevicol 0.020 10% 0.022 Kg

Door shutter

Flush door shutter 35 mm thk 1.000 0% 1.000 no

Laminate 2.000 10% 2.200 sft

Lipping patti 1.188 10% 1.307 rft

Nails/Screw 0.060 10% 0.066 Kg

Fevicol 0.060 10% 0.066 Kg

Door fittings

mortise lock with handle 1.000 0% 1.000 no

Hinges 4.000 3% 4.120 no

screws 32.000 3% 32.960 no

other fittings as per reqd