Duqm Refinery Project

EPC Package 2 –
Utilities
and Offsites
Contract No. CNT-1100-1000-007

INSPECTION RELEASE NOTE Rev. 0


1. GENERAL INFORMATION
IRN No: 2037-PL-PL-0058-IRN-T-001
PROJECT # JI 2037 / SO 0267 CUSTOMER: DUQM Refinery
P.O. NO. # 2037-PL-PL-0058-C.O-1 DATED: 31.01.2019

VENDOR: FTV Proclad LLC PHONE # +971 04 870 4046

LOCATION: Techno Park, Jebel Ali, Dubai, U.A.E. INSPECTION:

Notification No: 009, Rev 00 Date: 25.09.19


MATERIAL DESCRIPTION:
P.O Item No: 23
Tag No (If applicable) : SP-PL-HIB-023
Item Description: Hot Induction Bend
Total Qty.: 54 Nos Inspection Release Qty.: 24 Nos Balance Qty.: 24 Nos

2. Punch List Outstanding- YES/NO


If Yes Refer attached Punch List
3. REMARKS:

Refer Inspection Report dated: 2037-PL-PL-0058-IR-T-009-Rev 1 Dated 15.10.19

Result of Inspection: - Accepted/Rejected

4. SPECIAL NOTES
The signing of this document by contractor or their representative shall in no way relieve the
vendor/manufacturer of any responsibility for carrying out the provisions of the purchasing
order and/or any applicable codes or specifications.
CONTRACTOR INSPECTOR:
NAME: Mangesh Kasar

DEPARTMENT: QC

SIGNATURE:

DATE: 23.10.2019