2 RO-Gandhinagar Sanchore - Santalpur from km 67.000 - km 754K 32 6L EPC STUP Consultants Pvt.
99.000 of NH-754K (AJ-RGBS-Package-3) Ltd.
4 RO-Mumbai Vadodara Mumbai Expressway (Phase II - NE 4 26.8 8L HAM ICT Pvt. Ltd.
Pkg XVI) [Km. 43.000 to Km. 69.800 of
Spur] (Amne - Bhoj)
5 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 32.7 6L HAM Louis Berger Group Inc.
Package-II of Phase-I from Magadi to
Ramanagara from km 46.300 to 79.00
6 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 35.489 6L HAM Louis Berger Group Inc.
Package-I of Phase-III from Belagondapalli
(TN) to TN/KNT border from km 144.480
to 179.969
7 RO-Bengaluru Bangalore Ring Road (STRR) –NH-948A- 948A 46.3 6L HAM Louis Berger Group Inc.
Package-I of Phase-I from Dobbaspet to
Magadi from km 0.00 to 46.300
8 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 33.6 6L HAM Louis Berger Group Inc.
Package-I of Phase-II from Ramanagara to
BNP from km 79.00 to 112.600
15 RO-Patna Ara - Mohania (Pkg-II) 319 60.8 4L EPC M/S MSV International
16 RO- Angamaly Junction to Kundanoor Junction 544 47 4L EPC Louis Berger Group Inc.
Thiruvananthapuram (Ernakulam Bypass) from km. 317.800 of
NH-544 to Km. 351.865 of NH-66
20 RO-Chennai Hosur to Dhamrapuri (Pkg-1) [Neraluru - 844 23.35 4L HAM K&J projects Pvt.Ltd in
Thorapalli Agraharam] association with COS
consultancy services
21 RO-Chennai Thoppur - Mettur - Bhavani - Erode from 544H 77 4L TBD
km. 0.00 to km. 77.00
22 RO- 6L of Azhiyur-Vengalam from km. 189.200 66 39.1 6L HAM AECOM Asia Co. Ltd
Thiruvananthapuram to km. 230.400 of NH-66
24 RO- Kappirikkad to Edappally on NH-66 66 87.61 4L/6L TBD Feedback Infra Pvt Ltd
Thiruvananthapuram
25 RO-Gandhinagar Vadodara Mumbai Expressway (Jujuwa to NE-4 36 8L HAM ICT Pvt. Ltd.
Gandeva) (Phase IB - Pkg VIII) [Km
154.600 to Km 190.000]
26 RO-Gandhinagar Vadodara Mumbai Expressway (Karvad to NE-4 26 8L HAM ICT Pvt. Ltd.
Jujuwa) (Phase IB - Pkg IX) [Km 128.000 to
Km 154.600]
27 RO- Paravoor-Kottankulangara 66 37.5 4L TBD SMEC International Pty.
Thiruvananthapuram Ltd in association with
SMEC (India) Pvt. Ltd
28 RO-Chandigarh (PB) Bhatinda (Jodhpur Romana) - Mandi 54 27.4 6L HAM LEA Associates South
Dabwali Asia Pvt Ltd - RITES (JV)
29 RO-Gandhinagar 4L of Dhrol-Bhadra (Between Ex. Km 151A 50.4 4L HAM RITES Ltd.
5.700 to Km 13.600 of SH-25) and Bhadra
Patiya-Pipaliya Section of NH-151A
30 RO-Gandhinagar Vadodara Mumbai Expressway (Talsari to NE-4 24.6 8L HAM ICT Pvt. Ltd.
Karvad) (Phase IB - Pkg X) [Km 103.400 to
Km 128.000]
31 RO-Mumbai Vadodara Mumbai Expressway (Phase II - NE 4 9.98 8L HAM ICT Pvt. Ltd.
Pkg XVII) [Km. 69.800 to Km. 79.783 of
Spur] (Bhoj - Morbe)
32 RO-Nagpur 4L of Khandwa - Akola 80 4L EPC M/s RITES
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
33 RO-Vijayawada 4L with PS of Kadapa - Renigunta 716 133 4L PS HAM SM Consultants
45 RO-Nagpur 4L of Shendra - Bidkin - Kasabkhedaphata 753 75 4L EPC M/s Egis India Consulting
AB Engineers Private Ltd
47 RO-Bhopal Indore - Harda (Pkg-I) [Indore to Raghav 47 29.6 4L HAM Lion Engineering
Garh from km. 0.00 to km. 29.30] Consultant Pvt. Ltd.
53 RO-Bengaluru Flyover at Kalladka Town including 75 2.1 6L EPC M/s Voyants Solutions
approaches from Km. 311.57 to Km. Pvt. Ltd., Gurugram
313.67 in Addahole to B.C. Road section
58 RO-Gandhinagar Ahmedabad - Dholera (Pkg IV) from km. 751 37.96 4L EPC SMEC India Pvt. Ltd.
71.06 to km. 109.019) [Start of DSIR zone -
Adhelai Village]
59 RO-Kolkata Teesta bazar-Pedong TBD 37 2L PS TBD M/s RITES Ltd.
60 RO-Bengaluru Channarayanpatna Bypass from km 140 75 10.4 4L EPC M/s Msv International
449 to km 149 596 and providing other Inc.,
project facilities
61 RO-Bhubaneswar Sambalpur Bypass Road (Greenfield 35 4L PS TBD M/s STUP Consultant
Project) from Km. 0.00 to Km. 35.00 Pvt. Ltd.
62 RO-Jaipur Delhi-Vadodara Greenfield Alignment (NH- 148N 8.3 8L EPC Feedback Infra Pvt. Ltd
148N) (Pkg-15) (Ch. 419.000 to
Ch.427.300) [Junction with NH-12 near
village Ummedpura to Major bridge over
Takli river near Nayagaon Jageer village]
67 RO-Jaipur Four Lane (including Elevated Portion in 52 9.91 4L HAM Thoughts Consultants
Mukundra Hills National Park) from km Jaipur Pvt. Ltd.
289/50 to 299/0 (Darah-Jhalawar-
Teendhar)
68 RO-UP East Kanpur - Lucknow (Expressway) Green 63 6L HAM Egis India Consulting
Field Engineers Pvt. Ltd.
with
NH-
27
69 RO-Bengaluru Bangalore Ring Road Pkg 1 [4 Laning from 648 42 4L/6L HAM LBG Inc.
km 0.00 to km 42.00 of Dobbaspet to
Doddaballapura Bypass section of NH-648
(old NH-207)]
70 RO-Bengaluru Bangalore Ring Road Pkg 2 [4 laning from 648 38 4L/6L HAM LBG Inc.
km. 42.000 to km. 80.00 of
Doddaballapura Bypass to Hoskote
section of NH-648 (Old NH-207)
71 RO-Chennai Elevated Portion of 6L Chennai - Tada - 16 11 6L TBD VAX Consultants - L&T
(Madavaram - Cholavaram from km. (JV)
11.00 to km. 21.400)
72 RO-Mumbai Six Laning of Satara-Kagal Pkg-I from km. 48 42.95 6L HAM Louis Berger Group Inc.
592.40 to km. 639.00 of NH-48 (Old NH-4)
73 RO-Mumbai Six Laning of Satara-Kagal Pkg-II from km. 48 39.5 6L HAM Louis Berger Group Inc.
639.00 to km. 678.50 of NH-48 (Old NH-4)
74 RO-Bengaluru 4/6L of Bangalore - Pune Section of bypass 4 30.35 4L/6L BOT CV Kand Consultants P.
connecting Dharwad - Hubli from km. Toll Ltd.,
403.80 to km. 433.20
75 RO-Bengaluru Bangalore Ring Road (STRR) - NH - 948A - 948A 8.1 6L HAM Louis Berger Group Inc.
Package-II of Phase-II from to BNP
elevated highway in the entire core area
of BNP and in adjoining ESZ area @ 1 km
each on both sides including approaches
from km 112.600 to km 120.700
76 RO-Bengaluru Bangalore Ring Road (STRR)-NH-948A- 948A 23.78 6L HAM Louis Berger Group Inc.
Package-III of Phase-II from BNP to
Belagondapalli(TN) from km 120.700 to
144.480
77 RO-Bengaluru Bangalore Ring Road (Tamil Nadu Portion - 50 4L HAM M/s. KITKO Ltd.
Hosur - Sarjapura)
78 RO-Bhubaneswar 6L Capital Region Ring Road from 70.5 6L TBD
Palatotapada (NH-16) to Kuspangi (NH42)
revised as from Rameswar (NH-16) to
Gobindpur (NH-42) from Km.0.000 to
Km.70.500
79 RO-Madurai Thirumangalam - Rajapalayam 744 72 4L TBD M/s.Artefact Projects Ltd
88 RO-Kolkata 6L of Palsit - Dhankuni from Km. 588.870 19 63.83 6L BOT Chaitanya Project
to Km. 652.870 Toll Consultancy Pvt. Ltd.
89 RO-Mumbai Balance work under Phase-II for 4L of 60 8.634 4L EPC M/s CEG
Khed Sinner Section comprising of (i)
Kalamb bypass (km 68.576 to km 72.390),
(ii) Linear length of Bhatkalwadi (km
89.550 to km 90.400) and Alephata
bypass (km 92.030 to km 96.000)
110 RO-Ranchi 4L from km 196.87 (Sankha) to km 219.6 75 22.73 4L HAM L.N.Malviya Infra
(Khajuri) on NH-75 [Rehla / Garhwa Projects Pvt. Ltd., Bhopal
Bypass]
111 RO-Ranchi 4L from Km 147.450 (Bhogu) to Km 75 49 4L HAM L.N. Malviya Infra
196.870 (Sankha) on NH-75 (Sec-III) Projects Pvt. Ltd., Bhopal
113 RO-Vijayawada Bangalore Chennai Expressway (Phase-II 25 HAM EGIS Bceom International
Pkg-I) from km.71.000 to Km 96.000 S A in association with
(Bethamangala in the state of Karnataka SECON Pvt Ltd
to Byreddypalli)
114 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 48.1 4L HAM K&J Projects Pvt. Ltd.
Section Pkg-I from km. 0.00 to km. 19.80
(Mirya to Hatkhamba) & from km. 31.00
to km. 59.30 (Pali to Sakharpa)
115 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 36.7 4L HAM K&J Projects Pvt. Ltd.
Section Pkg-II from km. 74.300 to km,
111.00 (Kerle to Paijarwadi)
116 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 33.3 4L HAM K & J Projects Pvt. Ltd
Section Pkg-III from km. 111.000 to km.
144.300 (Paijarwadi to Kerle & Kolhapur
Bypass Kerle to Chokak)
117 RO-Mumbai 4L of Ratnagiri - Kolhapur - Solapur 166 15 4L HAM K&J Projects Pvt. Ltd.
Section Pkg-IV from km. 59.300 to km.
74.300 (Sakharpa - Kerle (Shahuwadi -
Tehsil)) including Amba Ghat section
118 RO-Guwahati Bal. work of 4L from 140.700 Km to 27 24.38 4L EPC Almondz Global Infra-
164.080 of Nrimbanglo to Jatinga section Consultant Limited in JV
of NH-54 (27 new) (Contract package No. with Thoughts
EW-II/AS-22) Consultants Jaipur Pvt.
Ltd.
119 RO-Chennai Bangalore to Chennai Expressway (Phase 106 6L EPC Appointed
III)
120 RO-Delhi Development of 4L UER II [Package - IV] 344P 29.6 4L EPC URS Scott Wilson India
(Spur to Sonipat Bypass) from km. 0.00 to Pvt. Ltd. in association
km.29.60 with AECOM India Pvt.
Ltd.
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
121 RO-Jaipur Jodhpur Ring Road Section-II (Nagaur - 26 6L TBD Feedback Infra Pvt. Ltd
Dangiyawas)
122 RO-Chennai Chennai - Salem 179A, 277 6L TBD M/s. Feedback Infra
179B
123 RO-Raipur Durg-Raipur Bypass Section (Package - 1) 53 44.5 4L PS HAM Transys Consulting Pvt.
from km. 0.00 to km. 44.50 (near Ltd.
Tendesara to near Khatti Village)
124 RO-Chandigarh (PB) Bhatinda Bypass 54 27 4L TBD
125 RO-Shimla Jwalamukhi-Hamirpur Bypass 205 41 Othe EPC M/s Intercontinental
rs Consultants and
Technocrats Pvt. Ltd.
126 RO- 6L of Perole (Nileshwar town) to 66 40.4 6L HAM AECOM Asia Pvt. Ltd.
Thiruvananthapuram Taliparamba from Km 94.248 to Km
134.650 of NH-66
127 RO- 6L of Taliparamba to Muzhappilangad 66 35.95 6L HAM AECOM Asia Pvt. Ltd.
Thiruvananthapuram from Km 134.650 to Km 170.6 of NH-66
128 RO-Chandigarh (HR) 6L Mandi Dabwali (Punjab/Haryana 54 34.8 6L HAM RITES Ltd
border) Sangaria road section from
proposed Mandi Dabwali Bypass to
Chautala from km. 27.400 to km. 62.200
of NH - 54
129 RO-Bhopal Indore - Edlabad (Pkg-III) [Balwara to 347B 38 4L HAM
Dhangaon] G
130 RO-Raipur 4L of Pathalgaon-Kunkuri-CG/ JH Border 43 100 4L HAM SA Infrastructure
from km. 466.52 to km. 598.00 Consultants Pvt Ltd
131 RO-Nagpur Pangare-Waranga Phata 161 40.28 4L EPC Marc Technocrats Pvt.
Ltd.
132 RO-Mumbai 4L of Ahmednagar - Mirajgaon - Karmala - 516A 38.78 4L HAM Monarch Surveyors
Tembhurni (Pkg-I) [Ahmednagar to
Ghogargaon] from km. 0.00 to km. 38.775
of NH-516A
133 RO-Mumbai 4L of Ahmednagar - Mirajgaon - Karmala - 516A 41.62 4L HAM Monarch Surveyors
Tembhurni (Pkg-II) [Ghogargaon to
Ahmednagar- Solpaur District Border]
from km. 38.775 to km. 80.390 of NH-
516A
134 RO-Bhopal Bhopal-Salamatpur-Vidisha bypass 146 55 4L TBD STUP Consultant Pvt Ltd. -
CEOMA Pvt. Ltd. (JV)
135 RO-Ranchi Elevated Corridor in Ranchi city from Km 75 & 3.76 3L EPC M/s CES, Kolkata
0.00 to Km 3.260 of NH-75 including down 23
ramp on NH-23 from Km 0.100 to Km
0.600
136 RO-Bhopal Sanchi Spur Green 3 4L HAM STUP Consultant Pvt Ltd. -
field CEOMA Pvt. Ltd. (JV)
137 RO-Bhopal Vidisha bypass - Gyaraspur 146 55 4L HAM STUP Consultant Pvt Ltd. -
CEOMA Pvt. Ltd. (JV)
138 RO-Chennai Viluppuram (Km.0.000) to Puducherry 332 29 4L HAM Feedback Infra Pvt. Ltd
(Km.29.000)
139 RO-Chennai Puducherry (Km.29.000) to 332 38 4L HAM Feedback Infra Pvt. Ltd
Poondiyankuppam (Km.67.000)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
140 RO-Bhopal Gyaraspur - Bhapel 146 64 4L HAM STUP Consultant Pvt Ltd. -
CEOMA Pvt. Ltd. (JV)
141 RO-Bhopal Bhapel - Sagar 146 14 4L HAM STUP Consultant Pvt Ltd. -
CEOMA Pvt. Ltd. (JV)
142 RO-Bhopal Sagar - Mohari from Km.8 to Km.50 (Pkg-I) 934 42.3 4L HAM URS Scott Wilson India
Pvt. Ltd.
143 RO-Raipur Raipur to CG/OD Border (Raipur 130C 123 4L HAM Yogama Engineering
Vishakapatnam Economic Corridor) D Pvt.Ltd - ARKITEKNO (JV)
144 RO-Vijayawada OD/AP Border - Sabbavaram 130C 100 6L HAM Chaitanya Project
D Consultancy Pvt. Ltd.
145 RO-Chennai Poondiyankuppam (Km.67.000) to 332 56.8 4L HAM Feedback Infra Pvt. Ltd
Sattanathapuram (Km.123.800)
146 RO-Vijayawada Renigunta - Poyya - Naidupeta km 124.60 71 57.046 6L HAM Chaitanya Project
to km 183.4 of NH 71 Consultancy Pvt. Ltd.
147 RO-Shimla Balance work of Kiratpur Nerchowk (Pkg- 3 47.75 4L HAM ICT Pvt. Ltd.
2) [Green Field]
148 RO-UP East 2L PS of Raebareli - Jagdishpur with 4L 330A 47.7 4L/2L HAM k& J Project Private
Jagdishpur Bypass Spur PS Limited
149 RO-UP West 4L of End of Hardoi district - Lucknow 731 36.944 4L TBD M/s Wadia Techno
from km. 229.02 to km. 266.014 Engineering Services
Limited
150 RO-Patna Bakhtiyarpur-Rajauli Pkg-II from km. 20 47.225 4L HAM SA Infrastructure
54.405 to km.101.630 Consultants Pvt. Ltd.
151 RO-Patna Bakhtiyarpur-Rajauli Pkg-III from km. 20 50.89 4L HAM SA Infrastructure
101.630 to km.152.520 Consultants Pvt. Ltd.
152 RO-Guwahati 6 New Flyovers at (i) Baihata Chariali 27 6.33 4L EPC VKS Infratech
(Start point) (ii) Baihata Chariali (End Management Pvt Ltd
point) (iii) Pathsala junction (iv) Chapaguri
junction (v) Bongaigaon Refinery Main
Gate (vi) Simlaguri junction
153 RO-UP West 2L PS of Mathura-Hathras from km. 0.00 530B 66 2L PS EPC M/s Secon GIS Driven
to km. 66.00 of NH-530B Design Consultancy
154 RO-Mumbai Dharampuri-Lonand from km. 117.00 to 965 50.4 4L EPC Technocrats Advisory
166.40 (Pkg-IV) on Mohol-Alandi Section Services Pvt. Ltd in Asso.
with Sugam Techocrats
Pvt. Ltd.
155 RO-Mumbai Jejuri-Hadapsar from km. 198.000 to 965 36.15 4L EPC Technocrats Advisory
234.150 (Pkg-VI) including bypass at Services Pvt. Ltd in Asso.
Saswad of 5.2 km. on Mohol-Alandi with Sugam Techocrats
Section Pvt. Ltd.
156 RO-Mumbai Lonand-Jejuri from km. 166.400 to 965 31.6 4L EPC Technocrats Advisory
198.000 (Pkg-V) including bypass Lonand - Services Pvt. Ltd in Asso.
Neera on Mohol-Alandi Section with Sugam Techocrats
Pvt. Ltd.
157 RO-Mumbai Flyovers from Old Pune Naka to Satrasta 9 5.45 4L EPC Yogama Engineering
chowk till ROB at Vijayapura Road, - Pvt.Ltd - Spectrum
Flyovers from Old Pune Naka to Satrasta Techno Consultant Pvt.
chowk till ROB at Vijayapura Road, Ltd. (JV)
158 RO-Guwahati 8 New Flyovers at (i) Boragaon junction (ii) 27 12.09 4L EPC Feedback Infra Pvt. Ltd.
Gorchuk junction (iii) Lokhra junction. (iv)
Basistha junction (v) Raha junction (vi)
Demow junction (vii) Borghat Charial (viii)
Kathiatali junction & 1 ROB at Jagiroad
junction on NH 27
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
159 RO-Guwahati Bal. work of 4L from165.250 Km to 27 25.34 4L EPC Almondz Global Infra-
190.587 ofJatinga junction to Harangajao Consultant Limited in JV
section of NH-54(27 new) (Contract with Thoughts
package No. EW-II/AS-21) Consultants Jaipur Pvt.
Ltd.
160 RO-UP West 4L of Moradabad-Jaspur section from km 734 54.5 4L TBD
0.00 to km 54.50 of NH-734
161 RO-Shimla 4L of Sihuni-Mandi from km. 51.00 to km. 154 157 4L HAM Feedback Infra Private
208.00 of Old NH-20 Limited In Joint Venture
with Casta Engineers Pvt.
Ltd.
162 RO-Chennai End point of BCE Pkg-III - End point of BCE 4 23.2 6 HAM Appointed
Pkg-IV lane
Eleva
ted
corri
dor
163 RO-Shimla Mataur-Jwalamukhi (Jwalamukhi - Kangra 88 36.43 4L EPC ICT Pvt. Ltd.
Bypass) from Km 157.000 to Km 193.426
164 RO-Shimla 4L of Shimla-Mataur section of NH-88 88 39.01 4L EPC M/s ICT Pvt. Ltd.
from km 77.00 to ch 116.800 (Bhager to
Hamirpur Bypass- Package-III)
165 RO-Shimla 4L of Shimla-Mataur section of NH-88 88 34 4L EPC M/s Intercontinental
from km 27.00 to ch 61.00 (Shalghat to Consultants and
Nauni Chowk -Package-II) Technocrats Pvt. Ltd.
166 RO-Shimla 4L of Shimla-Mataur section of NH-88 88 27 4L EPC M/s Intercontinental
from km 0.00 to ch 27.00 (Shimla to Consultants and
Shalaghat - Package-I) Technocrats Pvt. Ltd.
167 RO-Chandigarh (PB) 2/4L of Ghoman-Tanda 503A 31.6 2L/4L HAM
168 RO-Patna 4L of Munger to Devgarh Choraha 80 41.484 4L EPC M/s SAI Consulting
(sultanganj) from km 69+520 to km Engineers Pvt.
111.00
169 RO-Patna Munger - Mirzacowki (Pkg II & III) (100 80 100 4L TBD
km.)
170 RO-UP West 4L of Shahjahanpur to end of Hardoi 731 85.641 4L TBD M/s Wadia Techno
bypass from km. 89.00 to km. 174.641 Engineering Services
Limited
171 RO-UP West 4L of End of Hardoi bypass - End of Hardoi 731 54.43 4L TBD M/s Wadia Techno
district from km.174.641 to km. 229.070 Engineering Services
Limited
172 RO-Bengaluru 4L of Sannur to Bikarnakatte section from 169 46 4L TBD M/s feedback Infra Pvt
Km 691.350 to Km 736.362 of NH-169 Ltd
Karkala - Mangalore (Package-III)
173 RO-Patna 4L of Devgarh Choraha (Sultanganj) to 80 41.175 4L EPC M/s SAI Consulting
Ghogha Junction from km 111.00 to km Engineers Pvt.
152.100
174 RO-Patna 4L of Ghogha Junction to Mirzachowki 80 41.813 4L EPC M/s SAI Consulting
from km 152+100 to km 193.876 Engineers Pvt.
175 RO-Chandigarh (PB) 2/4L of Amritsar - Ghoman 503A 45.33 2L/4L HAM
176 RO-Madurai Paramakudi - Ramanathapuram 87 46.68 4L TBD Feedback Infra Pvt. Ltd
177 RO-Madurai Ramanathapuram - Dhanushkodi 87 64.56 4L TBD Feedback Infra Pvt. Ltd
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
178 RO- Munnar to Mattakuzhy on NH-85 85 111 4L TBD TPF Getinsa Eurostudioes
Thiruvananthapuram SL in JV with TPF
Engineering Pvt Ltd
180 RO-UP East Raebareli to Allahabad (4L) 24B 106 4L HAM Consulting Engineering
Services (I) Pvt. Ltd.
181 RO-Bhopal 4L of Dewas - Ujjain from km. 0.0 to km. Yet to 45 4L HAM SA Infrastructure
19.76 of Old SH 18 including Ujjain Bypass be Consultants Pvt. Ltd.
(Km. 19.76 to km. 26.9) & Dewas Bypass declar
(Km. 0.00 to km. 14.52) ed
182 RO-Bhopal Ujjain to Badnawar from km 49.460 to km SH-18 46.9 4L TBD SA Infrastructure
96.750 Consultants Pvt. Ltd.
183 RO-Chennai TN/AP Border (Near Pullur PF)-Chittor 716B 37 4L TBD
189 RO-Chandigarh (PB) Malout - Abohar - Sadhuwali 7 69.6 4L HAM URS Scott Wilson India
Pvt. Ltd.
190 RO-Shimla 4L of HP/Punjab Border - Sihuni from km. 154 40 4L EPC Feedback Infra Private
11.00 to km. 51.00 of Old NH-20 Limited In Joint Venture
with Casta Engineers Pvt.
Ltd.
191 RO-Kolkata Purulia Bypass 18 10.5 2L PS EPC ICT Pvt. Ltd.
195 RO- KL/TN border to Munnar on NH-85 85 42 4L TBD TPF Getinsa Eurostudioes
Thiruvananthapuram SL in JV with TPF
Engineering Pvt Ltd
196 RO- Mattakuzhy to Cochin on NH-85 85 11.5 4L TBD TPF Getinsa Eurostudioes
Thiruvananthapuram SL in JV with TPF
Engineering Pvt Ltd
197 RO-Delhi Gurgaon - Pataudi - Rewari from km. 0.00 352W 46 4L HAM RITES Ltd.
to km.43.87 of NH-352W
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
198 RO-Chandigarh (HR) Memmadpur - Dairi - Kharar TBD 46.3 4L EPC
199 RO-Patna Chakia-Bairgania 227 F 50 4L EPC Feedback Infra Pvt. Ltd
200 RO-Kolkata Jangipur/ Omarpur (km 244/600 of NH-34 312 52.2 4L HAM RITES Ltd.
Jn at Talai) to Sabjikatra
201 RO-Chandigarh (PB) Amritsar Bypass (Pkg III) from km. 71.496 354 33.66 2L PS EPC Frischmann Prabhu
to km. 105.158 (India) Pvt Ltd
202 RO-Patna Ara - Mohania (Pkg-I) 319 54.75 4L EPC Park Projects
Consultancy Pvt. Ltd.
203 RO-Hyderabad Four laning of NH-363 from Repallewada 363 52.6 4L HAM Aarvee Associates
from Km.288.510 to TL/MH Border Architects Engineers &
Km.288.510 Consultants Pvt. Ltd.
204 RO-Patna Balance work WB-10 Pkg on NH-28 122 1 4L EPC Park Projects
Consultancy Pvt. Ltd.
205 RO-Patna Patna Koilwar from km. 0.00 to km. 33.2 30 33.25 4L EPC M/s Vax consultant
207 RO-Raipur Durg-Raipur-Arang Package - 2 from km. 53 47.73 4L HAM M/s Transys
44.50 to km. 92.23 (near Khatti Village to
near Aurang)
208 RO-Bhubaneswar Chandikhole-Paradip 53 77 4L EPC
209 RO-Bhubaneswar 6L of Chandikhole - Paradip Section from TBD 76.59 6L TBD
Km.0.000 to Km.76.588 of NH - 53
210 RO-Delhi Development of 6L UER II [Package - II] 344M 13.45 6L EPC URS Scott Wilson India
(Karala Kanjhawala Road till Nangloi - Pvt. Ltd. in association
Najafgarh Road) from km. 15.00 to with AECOM India Pvt.
km.28.45 Ltd.
211 RO-Delhi Development of 6L UER II [Package - III] 344M 9.66 6L EPC URS Scott Wilson India
(Nangloi - Najafgarh Road till Sector 24 Pvt. Ltd. in association
Dwarka) from km. 28.45 to km. 38.111 with AECOM India Pvt.
Ltd.
212 RO-Mumbai Six Laning of Satara-Kagal Pkg-III from km. 48 46.5 6L HAM Louis Berger Group Inc.
678.50 to km. 725.00 of NH-48 (Old NH-4)
213 RO- Six Laning of KT/KL Border (Thalapaddy) - 66 39 6L HAM AECOM Asia Pvt. Ltd.
Thiruvananthapuram Chengala from Km. 17.200 to Km. 57.20
214 RO- 6L of Chengala - Neeleshwaram from km. 66 37.27 6L HAM AECOM Asia Pvt. Ltd.
Thiruvananthapuram 56.200 to km. 93.468
215 RO- 6L Minor Bridge (Paloli Palam) at km. 66 2.1 6L EPC AECOM Asia Pvt. Ltd.
Thiruvananthapuram 203.160 & Major Bridge (Morad) at km.
204.895 and allied works
216 RO-UP West 2L PS of Palia - Shahjahanpur from km. 731 89 2L PS TBD M/s Wadia Techno
0.00 to km.89.00 Engineering Services
Limited
217 RO-Chennai Tambaram - Chengalpattu - Tindivanam 45 93 8L Item Appointed
Rate
218 RO-Delhi Development of 6L UER II [Package - I] 344M 15.7 6L EPC URS Scott Wilson India
(NH-1 Near Bakoli till Karala Kanjhawala Pvt. Ltd. in association
Road) from km. 0.70 to km.15.00 with AECOM India Pvt.
Ltd.
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
219 RO-Delhi Development of 4L UER II [Package - V] 344 N 7.3 4L EPC URS Scott Wilson India
(Spur to Bahadurgarh Bypass) (NH-10) Pvt. Ltd. in association
from km. 0.00 to km.7.30 with AECOM India Pvt.
Ltd.
220 RO-Delhi Akshardham - DL/UP Border 709B 14.75 6L EPC
221 RO-Chandigarh (HR) Saha - Shahbad from Km. 14.860 to Km. 444A 18 4L EPC M/s Bloom International
32.600
222 RO-Patna 4L of Bal. works of Patna - Gaya -Dobhi 22 39 4L Item M/s ICT Pvt. Ltd.
(Pkg-I) from km. 0.00 to km. 39.00 of Old Rate
NH-83
223 RO-Jammu Delhi-Amritsar-Katra Expressway (Phase-II 44 23.5 4L EPC feedback Infra Pvt. Ltd
Pkg-XVI) Existing Samba-Jakh (Vijaypur)
section of NH-44 including construction of
Samba Bypass to four-lane access-
controlled Expressway standards (Design
Ch. 477+500 to 501+000)
224 RO-Jammu Delhi-Amritsar-Katra Expressway (Phase-II 54 28 4L EPC Feedback infra Pvt. Ltd.
Pkg-XIV) from Junction with Pathankot-
Gurdaspur road (NH-54) near Balsua to
Junction with NH-44 near Dabwal
(Buddhi) village (Km 424+000 to km
452+000)
225 RO-Jammu Delhi-Amritsar-Katra Expressway (Phase-II 144 19 4L EPC Feedback Infra Pvt. Ltd
Pkg-XVII) Existing Domel-Katra section of
NH-144 to four-lane access-controlled
Expressway standards (Design Ch.
570+000 to 589+000)
226 RO-Shimla 4L of End of Pinjore Bypass - Baddi - 21A 13.8 4L EPC Ramboll India Private
Nalagarh section (Pkg-01) (from Pinjore Limited
bypass to HR/HP Border) (km. 4.200 to
km. 18.00) of NH-21A
227 RO-Jammu Delhi-Amritsar-Katra Expressway (Phase-II 44 25.5 4L EPC Feedback Infra Pvt. Ltd.
Pkg-XV) Existing Dabwal (Budhi) - Samba
section of NH-44 to four-lane access-
controlled Expressway standards (Design
Ch. 452+000 to 477+500)
228 RO-Jammu Delhi-Amritsar-Katra Expressway (Phase-II 44 , 19 4L EPC Feedback Infra Pvt. Ltd.
Pkg-XVIII) Existing Jakh (Vijaypur)-Jammu 144A
Airport section of NH-44 & NH-144A to
four-lane access-controlled NH standards
(Design Ch. 0+000 to 19+000)
229 RO-Bengaluru Tumkur - Nelamangala (6L) 4 45.5 6L TBD M/s. Secon Pvt. Ltd.,
230 RO-Bhopal Indore - Edlabad (Pkg-II) [Tejajinagar to 347B 34 4L HAM Lion Engineering
Balwara] G Consultant Pvt. Ltd.
231 RO-Mumbai Vadodara Mumbai Expressway (Phase II - NE 4 26.3 8L HAM ICT Pvt. Ltd.
Pkg XII) [Km. 50.700 to Km. 77.000]
(Masvan - Ganjad)
232 RO-Mumbai Vadodara Mumbai Expressway (Phase II - NE 4 27.12 8L HAM ICT Pvt. Ltd.
Pkg XIII) [Km. 26.582 to Km. 50.700]
(Shirsad - Masvan)
233 RO-Mumbai Vadodara Mumbai Expressway (Phase II - NE 4 17.2 8L HAM ICT Pvt. Ltd.
Pkg XIV) [Km. 3.000 to Km. 20.200 of
Spur] (Shirsad - Akloli)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
234 RO-Mumbai Vadodara Mumbai Expressway (Phase II - NE 4 14.51 8L HAM ICT Pvt. Ltd.
Pkg XVIII) [Km. 79.783 to Km. 94.290 of
Spur] (Morbe - JNPT Section)
235 RO-Chennai Remaining Works of 4 lane bypasses 205 10.57 4L/2L EPC Theme Engineering
Thanner Kulam Thozur Sevapeta and PS Services Pvt. Ltd.
Veppampattu from km 50.900 to km
61.470 of NH-205 as Balance work of
Tirupathi-Tiruttani-Chennai Section in
Tamil Nadu
236 RO-Bengaluru 4L of Channarayapatna Bypass and Hassan 75 18.8 4L EPC MSV International Inc.
Bypass with structures in Devihalli -
Hassan section
237 RO-Bengaluru Road connectivity from Kasarkoda side of 66 4 4L EPC ICT Pvt Ltd
Honavar Port to NH-66 at Km 195.5
238 RO-Bengaluru 4L of Addahole (Near Gundya) to Bantwal 75 14.57 4L EPC M/s Yongma Engineering
Cross section (Pkg-01) from Design Km Co.Ltd in JV with DONG
255.703 to Design Km 270.270 of NH-75 IL Engineering
(Old NH-48) Consultants Co., Ltd and
in association with Cho &
Kim Engineering Pvt Ltd.
239 RO-Bengaluru 4L of Addahole (Near Gundya) to Bantwal 75 45.445 4L EPC M/s Theme Engineering
Cross section (Pkg-02) from Design Km Services Pvt Ltd
270.270 to Design Km 311.040 and from
Design Km 314+080 to Design km
318+755 of NH-75 (Old NH-48)
240 RO-Bhubaneswar 4L of Banarpal to Ballahar Chhak & 149 / 16 4L EPC M/s Arkitechno
Ballahar Chhak to Godibandha from km 53 Consultant Pvt Ltd
75.200 to km 84.000 of NH 149 &
Km.314.130 to Km.321.000 of NH-53
241 RO-Bhubaneswar Balance work of Panikoili Rimoli Section of 20 7 4L EPC
new NH-20 from Km 0.00 to Km. 163.000
242 RO-Bhubaneswar Road connectivity from Jamujhadih on NH- 316A 61.66 4L EPC
16 to Dhamra port via Basudevpur from
Km.0.000 to Km.61.660
243 RO-Chennai Balance Works of Tirupathi Tiruttani 205 14 4L/2L Item Theme Engineering
Chennai section of NH 205 from km PS Rate Services Pvt. Ltd.
274.800 to km 338.030 in AP and from km
0.000 to km 50.900 in TN including
Tiruvallur Bypass
244 RO-Bhubaneswar Basudevpur to Chandipur (Pkg-II) Km 316A 50.68 2L PS EPC
91.00 to Km 141.580
245 RO-Bhubaneswar Chandipur to Digha (Pkg-III) Km 141.580 316A 57.98 2L PS EPC
to Km 199.560
246 RO-Chandigarh (PB) Sangatkalan - Harbasnagar 54 14.9 4L EPC Lea Associates India Pvt
ltd
247 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway (Phase-I 7 ,SH- 30.91 4L EPC
Pkg-VI) from Junction with Patiala-Samana- 10
Patran road (SH-10) near Ghagga village to
Junction with Patiala-Bathinda road (NH-
7) near Bhawanigarh (Km 157+250 to Km
188+830)
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
248 RO-Chandigarh (PB) Delhi-Amritsar-Katra Expressway (Phase-I 5 34.11 4L EPC
Pkg-IX) from Junction with Ludhiana-Moga
road (NH-5) near Mullanpur Dakha to
Junction with Phillaur-Nakodar road near
Nurmahal village (Km 260+560 to km
294+670)
251 RO-Bhubaneswar CG/OD Border - OD/AP Border 130C 235 4L HAM M/s Arkitechno
D Consultants (India) Pvt.
Ltd.
252 RO-UP West Meerut - Najibabad from km. 39.24 to km. 119 40.25 4L HAM K&J Projects Pvt. Ltd.
86.59 of NH-119 (Pkg-II)
253 RO-UP West Muzzafarnagar - Miranpur 709A 27.25 4L EPC L.N.Malviya Infra
D Projects Pvt. Ltd. -
PIONEER Infra
Consultants Pvt. Ltd (JV)
256 RO-Jaipur Jaisalmer-Myalijar (Pkg. BM-07) 11 98.7 4L/2L HAM LEA Associates South
PS Asia Pvt Ltd
257 RO-Jaipur Udaipur- Kundal - Naya Kheda - Jhadol - 58 E 145 2L PS TBD
Som - Nalwa - Daiya(Gujarat Border) - Idar
258 RO-Mumbai Patas-Vasunde Phata - Baramati Bypass 965G 56 4L EPC Dhruv Consultancy
Services Ltd
259 RO-Jaipur Delhi Road to Agra Road of Jaipur Ring TBD 46.46 6L HAM Upham International
Road (North) from km. 101.00 to km. Corporation Ltd - SA Infra
147.463 structural Pvt Ltd (JV)
260 RO-Jaipur DNP Area (Delinked stretch of Desert 49 2L PS TBD yet to be appointed
National Park)
261 RO-Mumbai 4L of Baramati to Indapur (Pkg-II) from 965G 43 4L EPC SATRA Infrastructures
km. 41.400 to km. 84.550 of NH-965G Management Services
(Saint Tukaram Marg) Pvt. Ltd
262 RO-Nagpur Govindhpur (MS - Telangana Border)- 353B 56 4L EPC M/s. Mukesh &
Rajura Associates
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
263 RO-Mumbai 4L of Indapur to Tondle (Pkg-III) from 965G 47 4L EPC SATRA Infrastructures
km.84.550 to km. 131.00 of NH-965G Management Services
(Saint Tukaram Marg) Pvt. Ltd
264 RO-Nagpur Bamni-MS - Telengana Border 930D 31.8 4L EPC M/s. Mukesh &
Associates
265 RO-Delhi DL/UP Border - EPE Crossing 709B 16.45 6L EPC
274 RO-Ranchi Hariharganj to Parwa Mode section from 98 33.765 4L HAM Shweta Technophile
km 23.284 to km 57.049 of NH-98 Consultant Pvt Ltd,
Ghaziabad.
275 RO-Patna Umagaon-Saharsa (Package-I) Umagaon- 227L 47.75 Othe TBD VKS Infratech
Basopatti-Kaluahi & Sharghat-Benipatti- and rs Management Pvt. Ltd.
Rahika 227J
276 RO-Patna Umagaon-Saharsa (Package-II) Rahika & 527A 14.88 Othe TBD VKS Infratech
Madhubani Bypass (Rahika-Pokharauni- rs Management Pvt. Ltd.
Rampatti)
277 RO-Patna Umagaon-Saharsa (Package-III) Bideshwar 527A 26.04 Othe TBD VKS Infratech
Asthan (NH-27, E-W) to Bheja rs Management Pvt. Ltd.
278 RO-Patna Umagaon-Saharsa (Package-V) Bakaur- 327E 39.08 Othe TBD VKS Infratech
Parsarma-Bangaon-Bariyahi & Spur to rs Management Pvt. Ltd.
Mahishi
279 RO-Patna 4L from km. 34.600 to km. 79.970 & 2LPS 131A 49 4L HAM Aarvee Associates
from km. 79.970 to km. 82.000 of
Narenpur - Purnea Section of NH-131A
282 RO-Madurai 6-laning of Trichy - Thanjavur section of 83 56 6L EPC Feedback Infra Pvt. Ltd
NH-67
283 RO-Madurai Rajapalyam - Shenkottai (Lot-3) / Tamil 744 62 4L HAM Feedback Infra Pvt. Ltd
Nadu / (Pkg-2)
284 RO-Madurai Pilayarpatti - Kaikurichi (near Pudukkottai) 36 32.51 4L EPC Aarvee Associates
Architects Engineers &
Consultants Pvt. Ltd.
Balance for Award
Arranged in order of their completion with last completed shown first
Status as on 11 August, 2020
All Lengths in Km.
Sr
RO Strech NH Length Lane mode DPR Consultant
No.
285 RO-Madurai Thanjavur - Kaikurichi (near Pudukottai) 36 51.8 4L EPC Aarvee Associates
Architects Engineers &
Consultants Pvt. Ltd.
293 RO-Kolkata Dhupguri-End of Falakata Bypass (Pkg IIB) 31D 29 4L EPC ICT Pvt. Ltd.
295 RO-Gandhinagar Delhi-Vadodara Greenfield Alignment (NH- 148N 30 8L EPC Chaitanya Project
148N) (Pkg-26) (Ch.696+890 to Consultancy Pvt. Ltd.
Ch.726+390)
296 RO-Patna Bakhtiyarpur-Rajauli Pkg-I from km. 20 6.682 4L HAM SA Infrastructure
47.723 to km. 54.405 Consultants Pvt. Ltd.
297 RO-Ranchi 4L from Km 55.00 (Kuru) to Km 95.400 75 41 4L HAM L.N. Malviya Infra
(Udaipura) on NH-75 (Sec-I) Projects Pvt. Ltd., Bhopal
298 RO-Chandigarh (HR) Jagadhari - HR/HP Border (Ponta Sahib) 344 34 4L TBD M/s Rites Ltd.