Professional Documents
Culture Documents
Wipro It Sez: INSPECTION & TEST PLAN - False Flooring Installation
Wipro It Sez: INSPECTION & TEST PLAN - False Flooring Installation
Approved Technical
As per Approved Data Specification Material
1 Material Approval False Flooring Installation Visual Inspection
sheet approved Request
MAR C C
(MAR)
Area clearance
3 Area Clearance Civil to MEP Each segment
form(From Civil to MEP)
CHECK LIST C C C
9 Smoke Test Visual Inspection Each segment No smoke leakage Test report 100% 100% 100%
Standard acceptance
10 Air Leakage Test Pressure guage Each segment pressure to be Test report 100% 100%
maintained
Comments if any:
For Schneider Electric India For L&T EXECUTION For L&T QC For TCE
Name: Name: Name: Name:
Date & Sign: Date & Sign: Date & Sign: Date & Sign:
LEGEND:
RC: Random check HP: Hold Point C: 100% Inspection and Checking by Contractor. MIR: Material Inspection Request MAR : Material Approval Request