Projek Pembaikan Cerun Dan Kerja-Kerja Berkaitan Di Sekolah Kebangsaan Kauluan, Ranau, Sabah
Projek Pembaikan Cerun Dan Kerja-Kerja Berkaitan Di Sekolah Kebangsaan Kauluan, Ranau, Sabah
Project Name:
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN KAULUAN ,
RANAU , SABAH .
Document Title:
METHOD STATEMENT
FOR
TURFING WORKS
Submission Record
1
2
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH MS/2019 - 11 Rev.: 00 Page 2 of 11
TABLE OF CONTENTS
3
4
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH MS/2019 - 11 Rev.: 00 Page 3 of 11
1.0 INTRODUCTION
This method statement covers the following work activities associated with the requirement of
the contract document for Projek Pembaikan Cerun Dan Kerja – Kerja Berkaitan di Sekolah
Kebangsaan Kauluan , Ranau, Sabah .
It is intended to assist site personnel in carrying out the performance of the activities. It also
serves to demonstrate to the client that we as the contractor understand the work scope and is
capable of undertaking it.
2.0 OBJECTIVE
Traditional met hod of planting grass which is harvested from our own turf farm.
Turf ing can be car ried out either by t he means of “ close turf ing” ( grass plant
wit hout gap in between each other ) or “spot turf ing” (gr ass plant with gap in
bet ween each other). The purpose of Turfing Wor ks is :
a) WORKS METHODOLOGY
3.1 Site Preparation
The Main Contractor is required to grade the planting area to finish grades and allowed for a
smooth and uniform to the consultant approval. The Main Contractor is required to roll,
scarify, rake and level so to obtain the even planting area. All loose stones, gravel, tree
stumps in which is not desirable is required to cart away from site to the approved dumping
area. To lay 50mm thick layer of approved black vegetable soil / top soil before turf.
5
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH MS/2019 - 11 Rev.: 00 Page 4 of 11
Close Turfing
Turfing shall be carried out at all the terrace and slope area as specified (refer to the
construction drawing).
The grass sod used for close turfing shall be cut and supplied at approximate size of 300mm
square and minimum thickness 50mm with original sod adhering to the roots. The sods shall
be 50% pure comprised of Axonupus Compressus. Close turfing shall consist of
approximately 300mm square turfing laid side by side with gaps not exceeding 30mm. If
necessary, each sod shall be stack with 200mm peg through the sod into the soil base, to
prevent soil erosion.
The sods shall be laid onto the surface of the prepared ground with leaf turfs upwards, but
jointed as closed as possible to achieve a uniform cover. The turf shall be laid off planks
working over turns previously laid. The whole area should present an even smooth surface
when completed. Top dressing of the turf area shall be carried out immediately after the turf is
laid and monthly intervals thereafter.
Watering
Watering shall be carried out immediately after the completion of planting. The completed
areas shall be lightly sprayed with water and keep the areas moist.
Maintenance
Maintenance shall begin immediately after each portion of turfed and planting area is installed
and shall continue for the period of maintenance as specified commencing from the date of
acceptance. Maintenance is including watering, fertilizing, spraying and mowing.
6
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH MS/2019 - 11 Rev.: 00 Page 5of 11
7
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH MS/2019 - 11 Rev.: 00 Page 6 of 11
NPK 15:15:15 shall be used after 3 months planted at the rate of 100gms per square meter
and continue the application every 3 months.
NPK 15:15:15 shall be used at the rate of 200gms for each plant every month for the first
year period. For the next year after, fertilizing shall be continued every 4 months. This
fertilizer must be applied around the plant, outside the canopy area.
Handing Over
Main Contractor shall arrange joint site inspection for handing over after the end of the period
maintenance. Main Contractor shall be carried out rectification works for any defect works.
8
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH MS/2019 - 11 Rev.: 00 Page 8of 11
4.1.1 Safety
1) The workers shall provide with PPE (Personal Protective Equipment) and shall be worn all
the time.
2) During fertilizer work, the workers shall provide additional equipment such as safety
goggles and mouth and nose filters to avoid contact with fertilizer.
4.1.2 Environmental
3) The Contractor shall ensure there is no oil leakages from machinery (cutting machine)
which is could harm the environment.
The quality assurance & control requirements shall be in accordance with this method
statement. In carrying this works the following documents & forms and procedures shall
be implemented before commencement of work;
9
10
Method Statement for Turfing Work
PROJEK PEMBAIKAN CERUN DAN KERJA-KERJA
BERKAITAN DO SEKOLAH KEBANGSAAN
KAULUAN , RANAU ,SABAH . MS/2019 - 11 Rev.: 00 Page 9of 11
The equipment involved in the Drainage work (but not limited to), according to type and
suitability: -
Typical manpower involved in drainage work (but not limited to) are as follows: -
11
Method Statement for Turfing Works
PROJEK PEMBAIKAN CERUN DAN KERJA –
KERJA BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH . MS/2019 - 11 Rev.: 00 Page 10of 11
8.0 MA TERIAL
Major materials used for turfing work, but are not limited to the following.
Grass Sods
Water
*Top soil
12
Method Statement for Turfing Work
PROJEK PEMBAIKAN CERUN DAN KERJA –
KERJA BERKAITAN DI SEKOLAH KEBANGSAAN
KAULUAN , RANAU , SABAH . MS/2019 - 11 Rev.: 00 Page 11of 11
9.0 REFERENCES
The work is carried out in accordance to the following: -
(i) Bill of Quantities.
(ii) Project Construction Drawing.
11.0 ANNEXES
Request for Inspection (RFI) form
13