  Requirement 
● Suspension tubes 
Procedure 
● A Arms welding jigs  
1. Front A Arms Notching.   ● Bearings 
2. Bearing house Manufacturing.   ● Bearing House 

3. Using A Arm welding jigs, A Arms are welded in  ● Circlips 

defined position   ● Rod-ends  


● Jam nuts(left side+right side) 
4. Adapter are welded to all the Suspension Links. 
● Adapter 
5. Threading is done using Tabs in all adapters. 
● VD tabs  
6. Rod-ends and Jam-nut of opposite threads are  ● VD Tabs jigs  
inserted in the rear suspension links and tie rod. 
● Damper  
7. Now using suspension links and Tabs jigs, tabs welded  ● Damper tabs jigs  
onto chassis. (Chassis is lifted to a certain height viva  ● Fasteners 
wooden Billets)  ● Deralin  
8. Using damper and Tabs, Damper tabs is to we welded.   ● Metallic sleeve  

  
● Damper Spacer  

 
 
 
 
 
 
 